Structural Engineering

Support the design with a clear structural plan.

Understand how the proposed building or alteration will be supported. Uni Construction lists structural engineering services and can discuss the responsible professional, required investigation, calculations, drawings, and coordination for your project.

AI-generated illustrative scene for Structural Engineering
AI-generated illustrative scene for Structural Engineering AI-generated illustrative scene for Structural Engineering

Los Angeles ADU BUILDERS

Our Promise To You

Structural Engineering for your property

Collage showcasing ADU construction in Los Angeles, featuring modern design and quality craftsmanship. Images include a stylish ADU bathroom, an exterior view of a completed ADU, an aerial view of construction progress, and a furnished interior living space. Highlights the attention to detail and seamless integration typical of Los Angeles ADU projects.
Stress-Free ADU Construction Services in Los Angeles

Structural Engineering for your property

Structural work considers how loads move through the building and into the supporting ground. New openings, altered walls, additions, and conversions can change that path. A layout decision should therefore be coordinated with the structural professional before it is treated as a straightforward field alteration.

Los Angeles ADU Builders with 20 Years of Expertise

20 years of ADU expertise

The structural scope depends on the proposed work and reliable information about the existing building and site. Identify the responsible California-licensed professional and the exact services included. Calculations, drawings, site observations, special inspections, and construction clarifications are distinct tasks and should be defined in the agreement.

Affordable ADU Construction Services in Los Angeles

Structural Engineering for your property

Provide architectural drawings, available structural records, and the intended work. Identify new openings, additions, changes in use, and retained construction affected by the proposal. The engineer determines what further information is needed for their analysis.

Full-Service ADU Construction Company

Trust the process, love your ADU

Review available records and observable conditions within the agreed scope. Concealed framing, foundations, or connections may require investigation. Do not assume an old plan proves that the building was constructed exactly as drawn or remains unchanged.

50+ five-star reviews

Top-rated ADU builders providing complete ADU construction services
Uni Construction & ADU Design

Need an ADU? We handle everything.

  • Feasibility

  • Design & Plan

  • Permit

  • Build

ADU Type ADU Type ADU Type

One ADU Contractor. Any build type.

Detached ADU Builders

Detached ADU

A detached ADU is a standalone unit with its own entrance (sometimes called a granny flat or guest house) and is perfect for generating rental income or multigenerational living for a family member.
Attached ADU Builders

Attached ADU

An attached ADU expands your home and boosts your property value by connecting new living space to the main residence. It’s often a great solution for older children or multigenerational living.
Room Addition ADU Builders

Room Additions

Room additions reimagine part of your existing home or add square footage to create a comfortable, functional living area. We help you determine if adapting or expanding your current layout is the simplest and most cost-effective path.
Garage Conversion ADU Builders

Garage Conversion

Converting a garage can turn underused space into a legal, livable ADU. It’s often the fastest way to add housing, but it comes with design and code considerations. We walk you through the feasibility, costs, and upgrades needed.

Start with inspiration

Browse ADU floor plans

The responsible professional develops the required analysis, structural plans, and details for the scope. Coordinate foundations, framing, connections, and openings with the architecture and other disciplines. Keep revisions aligned so the documents describe one intended structure.

Browse floor plans
1192 sq ft 4-bedroom 2-bath ADU floor plan
4 BR | 2 BA
  • 1192 SF
  • 4 Bed
  • 2 Bath
749 sq ft 2-bedroom 2-bath ADU floor plan
2 BR | 2 BA
  • 749 SF
  • 2 Bed
  • 2 Bath
800 sq ft 2-bedroom 2-bath ADU floor plan
2 BR | 2 BA
  • 800 SF
  • 2 Bed
  • 2 Bath
650 sq ft 2-bedroom 1-bath ADU floor plan
2 BR | 1 BA
  • 650 SF
  • 2 Bed
  • 1 Bath
400 sq ft 1-bedroom 1-bath ADU floor plan
1 BR | 1 BA
  • 400 SF
  • 1 Bed
  • 1 Bath

we handle everything

End-to-end ADU project management

As experienced ADU builders, we make the process easy, handling everything from design to construction with clarity and precision. Our team manages each step to deliver high-quality results and complete peace of mind, so you can simply enjoy your new space.

Before we start building your Accessory Dwelling Unit, we do a detailed feasibility study, evaluating zoning regulations, building codes, and potential red tape to show exactly what’s possible for your property. Whether you envision multigenerational living or a backyard cottage, we align design with legal requirements and your lifestyle goals. Our streamlined process establishes a realistic budget, passive income potential, sets clear expectations, and provides full transparency and confidence for your long-term investment from day one.
Learn more

Coordinate structural plan-check comments with the responsible engineer. Define any included construction observations or clarification services. When actual conditions differ from assumptions, obtain professional direction before changing structural work or concealing affected construction.

Forget the complexities of permits and building codes, we handle it all. Our experienced team manages every detail of permit submissions, building department approvals, code compliance, and inspections, ensuring a smooth and swift process that keeps your accessory dwelling unit project on track without delays.
Learn more

Your dedicated Project Manager oversees the entire construction process of your ADU. They handle everything from utility integration to final touches. They ensure the project progresses on time, maintains quality, and communicates clearly at every step. Our general contractors deliver high-quality workmanship, bringing your vision to life seamlessly and without surprises.
Learn more

Share the proposed work, current plans, records, and known conditions. Identify the responsible professional and agreed services. Establish which site information and architectural decisions are required before analysis can proceed.

The structural professional identifies investigation or reports needed for the design. Coordinate access and documentation. Keep assumptions visible so the design does not rely silently on concealed conditions that have not been verified.

Maximize your accessory dwelling unit investment by boosting your property value and earning extra income with our comprehensive rental support services. From market analysis and tenant attraction to compliance guidance, we'll help you confidently navigate renting your ADU, ensuring optimal returns, extra income, and minimal stress.
Learn more

Develop the structural package alongside the current architecture. Review interfaces with openings, equipment, foundations, and utilities. Communicate design changes promptly so dimensions and details remain consistent across the set.

ADU design & construction in Los Angeles

Serving homeowners across Los Angeles and surrounding cities, with offices in Diamond Bar, Los Angeles, and Pomona.

Exploring ADU Options

Where should I start with my ADU?

Thinking about an ADU

Not sure if an ADU is right for you? Curious about costs of building, zoning details, or whether you need a feasibility study? We can walk you through the basics and give you a clear picture of your options and the basics of ADUs.
Start here to learn the basics

I’m weighing my options

Done some research but still comparing paths? Should you hire separate designers and ADU builders, general contractors, or one trusted design-build partner? Learn why the design-build approach cuts through red tape, saves time, and delivers better value.
The design-build difference

I’m ready to build my ADU

If you’re ready to move forward, we’ll make the process seamless. Our team will review your property, handle permits, and create a tailored plan to design and build your ADU, so you can focus on enjoying your new space.
Get my custom ADU proposal

ADU Regulations

The easy way to build an ADU is here

Coordinate authority comments or construction clarifications as included. Additional observations, revised designs, or discovered conditions may require additional services. Keep issued documents and written professional responses available to the construction team.

smaller adu setbacks

Smaller ADU setbacks

Allowing you to do more with your property.
reduce adu costs

Reduced ADU costs

Carrying out cost-effective construction without compromise.
expideted

Expedited ADU approvals

Speeding up the permit approval timeline for ADUs.
list-icon-2

ADU parking requirements

Alleviating the parking space requirement for ADUs.
list-icon-4

Additional ADUs

Supporting both ADUs and Junior ADUs on a single property.
list-icon-6

Bigger ADU builds

Greater build sizes Making even larger ADUs possible.

Our reviews

Yelp review

“He also provided realistic timelines which he maintained. Above all, he knows his craft.”

Leo O.

Review excerpt · Yelp
View on Yelp
Yelp review

“Their expertise, competitive pricing, and impressively fast response time made the entire experience smooth and stress-free.”

I-ting W.

Review excerpt · Yelp
View on Yelp
Yelp review

“Min is very responsive and communicates well with our team.”

Brandon L.

Review excerpt · Yelp
View on Yelp
Yelp review

“Min always responds to my requests quickly, and helps me revise the plan many times until the ADU permit application is approved.”

Doris C.

Review excerpt · Yelp
View on Yelp
Google review

“They did full design that helped me get city permit approval.”

Sonia Hobbs

Review excerpt · Google
View on Google
Google review

“Uni construction came in with better cost but more so solved many problems that architect had created!”

Forest Jones

Review excerpt · Google
View on Google
Google review

“They did a great job on my plans for a detached ADU and getting them fully approved by the city.”

Josue Moreno

Review excerpt · Google
View on Google

ADU INSIGHTS

ADU contractors you can count on

Aerial view of a Los Angeles neighborhood with a detached backyard unit ,  What Is ADU Construction illustration for Uni Construction blog.

What Is ADU Construction?

ADU construction involves planning, permitting, and building a self-contained living space on a residential property , adding value, flexibility, and income potential without buying new land.

Learn More
Aerial view of ADU site preparation backyard – When Should You Build an ADU

Structural Engineering for your property

ADU construction involves planning, permitting, and building a self-contained living space on a residential property , adding value, flexibility, and income potential without buying new land. In California, ADUs now make up about one in six new homes, reflecting their growing role in solving the state’s housing shortage.

Learn More
Aerial view of professional ADU construction showing framed structure and residential site , Why Choose a Professional ADU Builder

Structural Engineering for your property

A wall’s appearance does not establish whether it carries load or contributes to lateral resistance. Provide the proposed change and available building information to the structural professional before assuming a wall can be removed.

Learn More
Modern Los Angeles home representing where ADUs can be built on residential lots.

Structural Engineering for your property

Residential use and proposed openings can change structural considerations. Existing floor and foundation conditions need appropriate review. Retaining a garage shell does not automatically establish that it is suitable for the new design.

Learn More
Construction workers framing a detached ADU structure CA during the early building process

Structural Engineering for your property

New and existing construction need a considered structural relationship. Foundations, roof changes, openings, and load paths should be coordinated. The extent of investigation depends on the building and the alteration, not only the size of the new room.

Learn More

Calculate your
ADU ROI

Our calculator offers a clear look at what your return on investment will be for your ADU project.

$ Maximum value ranges from 1$ to 1000000$
$ Maximum value ranges from 1$ to 1000000$
Total Return On Your ADU Investment

1,739%

Compare to other investments:

Real Estate

Avg. 6-8%

Stocks

Avg. 5-7%

Savings Account

Avg. 2-4%

Financing your ADU
made simple

We proudly extend flexible financing options to the homeowners we serve, breaking down the full cost of an ADU into manageable payment schedules. Here's how our process works.

1

Easily apply online

Easily apply with our hassle-free online process.

2

Pre-qualify

See if you pre-qualify for an even quicker turnaround.

3

Fast review process

Sit back and relax while we handle the review process.

4

Approval

Receive a notification the moment you’re approved.

Your top ADU questions answered

Answers to your most common ADU building questions.

The responsible licensed professional provides the required signed or stamped work within their scope. Confirm their identity, license, and responsibilities in the project agreement. A general service-page description is not a substitute for that project-specific information.

Confirm the exact services in the proposal. Design, construction observations, special inspections, and building-department inspections serve different purposes and may involve different parties. Do not assume one replaces another.

Describe the concern and provide records and photographs. The responsible professional can determine what assessment is appropriate. If the matter involves potential immediate danger, use the appropriate local emergency or building-safety channel rather than waiting for a routine design consultation.