What Is ADU Construction?
ADU construction involves planning, permitting, and building a self-contained living space on a residential property , adding value, flexibility, and income potential without buying new land.
Building Design
Plan residential and commercial spaces around the way they will be used. Uni Construction provides building design, drafting and technical coordination across Los Angeles and surrounding cities. Permit coordination connects the agreed drawings with local review responses; approval remains with the responsible agency.
Los Angeles ADU BUILDERS
Our Promise To You
Building design begins with the way a space needs to work. A useful brief connects people, rooms, activities, light, privacy, outdoor areas, and budget priorities. It also identifies which aspects of the existing property should remain and which need to change.
The design should develop at the right level for each decision. Compare concepts while major changes are still manageable, then refine the selected option with the technical disciplines and documents required for the next stage. Clear decision points help avoid repeatedly redesigning an already detailed package.
Discuss intended use, room needs, daily routines, future changes, visual preferences, and budget expectations. For an existing home, identify what currently works and what does not. Define priorities so alternatives can be compared against more than appearance.
Consider the building position, arrival, circulation, daylight, privacy, outdoor use, and known constraints. Use reliable information about existing conditions. Identify professional inputs needed to resolve boundaries, structure, or other site-specific questions.

Feasibility
Design & Plan
Permit
Build
Start with inspiration
Compare plans and the corresponding building form. Test furniture, openings, storage, and service areas. Review proportions, roof form, and materials alongside practical needs, so the exterior and interior describe the same design direction.
we handle everything
As experienced ADU builders, we make the process easy, handling everything from design to construction with clarity and precision. Our team manages each step to deliver high-quality results and complete peace of mind, so you can simply enjoy your new space.
Before we start building your Accessory Dwelling Unit, we do a detailed feasibility study, evaluating zoning regulations, building codes, and potential red tape to show exactly what’s possible for your property. Whether you envision multigenerational living or a backyard cottage, we align design with legal requirements and your lifestyle goals. Our streamlined process establishes a realistic budget, passive income potential, sets clear expectations, and provides full transparency and confidence for your long-term investment from day one.
Learn more
Refine the selected concept and identify the architectural, engineering, and supporting documentation required. Record approved decisions and unresolved selections. Define whether the next stage includes permit coordination, construction documentation, pricing support, or a handoff to another party.
Forget the complexities of permits and building codes, we handle it all. Our experienced team manages every detail of permit submissions, building department approvals, code compliance, and inspections, ensuring a smooth and swift process that keeps your accessory dwelling unit project on track without delays.
Learn more
Your dedicated Project Manager oversees the entire construction process of your ADU. They handle everything from utility integration to final touches. They ensure the project progresses on time, maintains quality, and communicates clearly at every step. Our general contractors deliver high-quality workmanship, bringing your vision to life seamlessly and without surprises.
Learn more
Share the property, existing information, intended use, and examples of what you like. Explain practical needs as well as visual preferences. Agree the project brief, design scope, and included review stages.
Compare layouts and site arrangements that respond to the brief. Test room relationships, entrances, furniture, and outdoor connections. Identify tradeoffs and choose a direction before investing in detailed development.
Maximize your accessory dwelling unit investment by boosting your property value and earning extra income with our comprehensive rental support services. From market analysis and tenant attraction to compliance guidance, we'll help you confidently navigate renting your ADU, ensuring optimal returns, extra income, and minimal stress.
Learn more
Develop dimensions, openings, exterior form, material direction, and key equipment requirements. Coordinate early specialist input where needed. Confirm decisions that would be costly to change after the technical package advances.
Serving homeowners across Los Angeles and surrounding cities, with offices in Diamond Bar, Los Angeles, and Pomona.
Exploring ADU Options
Where should I start with my ADU?
Thinking about an ADU
Not sure if an ADU is right for you? Curious about costs of building, zoning details, or whether you need a feasibility study? We can walk you through the basics and give you a clear picture of your options and the basics of ADUs.I’m weighing my options
Done some research but still comparing paths? Should you hire separate designers and ADU builders, general contractors, or one trusted design-build partner? Learn why the design-build approach cuts through red tape, saves time, and delivers better value.I’m ready to build my ADU
If you’re ready to move forward, we’ll make the process seamless. Our team will review your property, handle permits, and create a tailored plan to design and build your ADU, so you can focus on enjoying your new space.ADU Regulations
The easy way to build an ADU is here
Organize the selected design and requirements for documentation, engineering, and authority review. Clarify which work Uni Construction provides and which is separately commissioned. Keep the current drawings and approved decisions identifiable.
ADU INSIGHTS
ADU construction involves planning, permitting, and building a self-contained living space on a residential property , adding value, flexibility, and income potential without buying new land.
ADU construction involves planning, permitting, and building a self-contained living space on a residential property , adding value, flexibility, and income potential without buying new land. In California, ADUs now make up about one in six new homes, reflecting their growing role in solving the state’s housing shortage.
Start with how much independence and space the household needs. A reconfigured home, an addition, and a separate dwelling solve different problems. Compare their implications before deciding which project type deserves detailed design.
An inspiration image can guide materials or atmosphere, but it does not establish a workable floor plan. Review storage, circulation, privacy, daylight, and maintenance alongside the desired appearance.
Identify the features that matter most and the decisions with the greatest scope implications. Keep optional features visible so they can be discussed deliberately. A clear priority list makes design tradeoffs easier when estimates develop.
Our calculator offers a clear look at what your return on investment will be for your ADU project.
1,739%
Real Estate
Avg. 6-8%
Stocks
Avg. 5-7%
Savings Account
Avg. 2-4%
We proudly extend flexible financing options to the homeowners we serve, breaking down the full cost of an ADU into manageable payment schedules. Here's how our process works.
1
Easily apply with our hassle-free online process.
2
See if you pre-qualify for an even quicker turnaround.
3
Sit back and relax while we handle the review process.
4
Receive a notification the moment you’re approved.
Answers to your most common ADU building questions.
Uni Construction lists ADU building design among its services. Share the site and household brief so a custom layout can be considered against the property and required documentation. A custom concept still needs technical coordination and approvals.
They are distinct professional descriptions. Your agreement should identify the actual professionals, their roles, and any required licenses or stamps for the proposed work. Do not assume that a service label replaces the project’s professional requirements.
Share the complete material, its status, and permission to use or modify it. We can discuss the remaining design work and technical inputs. Confirm ownership, responsibilities, and the extent of revisions before continuing.
Ask for a written scope covering the site review, layout options, exterior design, drawings and coordination needed for your project. Identify who handles engineering, permit responses and revisions. Bring examples of rooms you like, but also explain your storage, privacy and everyday access needs so the design brief is practical.
The appropriate team depends on the proposed work and the professional services required for it. Ask who is responsible for design and which licensed professionals will provide any required architectural or engineering services. Uni Construction can discuss the design and coordination scope without assuming every project needs the same team.