Carport Renovation and Canopy Permit Design in Anaheim

Existing carport from the driveway in Anaheim
Existing carport canopy and supporting post in Anaheim
Proposed rear-unit floor plan for the Anaheim rear dwelling renovation
Existing carport and demolition plan for the Anaheim rear dwelling renovation
Proposed east and west elevations for the Anaheim rear dwelling renovation

Project overview

Behind the project

Uni Construction prepared permit drawings for alterations the owner had already made to a rental property in Anaheim. The carport and canopy needed structural review, so the design package documented the existing work and the canopy support details for permitting.

Scope of work

Uni Construction prepared permit drawings for changes to an existing rear dwelling and its carport. The scope below comes from the plan set.

  • Document the removal of the carport and two exterior patio walls.
  • Re-insulate the two walls and specify exterior siding.
  • Add an electrical subpanel and show the proposed work on the electrical plan.

What the plans show

The cover sheet lists the rear unit at 572 sq ft. The proposed floor plan shows one bathroom and a bonus room. It does not label any room as a bedroom. The drawings also show the existing roof framing and details for the canopy support.

Project at a glance

Location
Anaheim, CA
Rear unit area
572 sq ft
Bathrooms
1 shown
Bedrooms
None shown on plan
Book a free consultation

Project FAQs

What did the Anaheim carport permit drawings cover?

The set documented the altered carport, the demolition scope shown on the drawings, and the proposed canopy support details. The owner needed structural engineering input to resolve the canopy work.

Was a bedroom shown on the Anaheim rear-unit floor plan?

The 572 sq ft rear unit shows a bathroom and a bonus room. The drawing does not designate the bonus room as a bedroom.

What do the Anaheim canopy drawings show about the existing roof?

The drawing set shows existing roof framing and details for the canopy support. The plan views and elevations help locate that work in relation to the rear dwelling.