ADU Design & Construction

A second home. A considered plan.

Create space for family, independent living, or a long-term rental with an ADU designed around your property. Uni Construction helps connect the early decisions with drawings, engineering coordination, permitting, and construction under an agreed project scope.

Modern ADU living room by a top Los Angeles ADU contractor near me, featuring stylish furniture and contemporary decor.

Los Angeles ADU BUILDERS

Our Promise To You

ADU Design & Construction for your property

Collage showcasing ADU construction in Los Angeles, featuring modern design and quality craftsmanship. Images include a stylish ADU bathroom, an exterior view of a completed ADU, an aerial view of construction progress, and a furnished interior living space. Highlights the attention to detail and seamless integration typical of Los Angeles ADU projects.
Stress-Free ADU Construction Services in Los Angeles

ADU Design & Construction for your property

An accessory dwelling unit is a complete small home, and the site around it is part of the design. Its entrance, living spaces, kitchen, bathroom, storage, and building systems need to work together. The first useful question is what kind of home the property can support and what its future occupant needs.

Los Angeles ADU Builders with 20 Years of Expertise

20 years of ADU expertise

Uni Construction works from Diamond Bar with homeowners across Los Angeles and surrounding cities. We can discuss a detached ADU, an attached unit, or conversion of existing space. Design services and construction services should be defined in the proposal so the responsibilities, deliverables, and next decision are clear.

Affordable ADU Construction Services in Los Angeles

ADU Design & Construction for your property

Review available records, existing buildings, access, grade, and known site restrictions. Identify the reviewing jurisdiction and what information is needed to test a concept. This stage should separate verified information from assumptions that need further investigation.

Full-Service ADU Construction Company

Trust the process, love your ADU

Develop the unit and its relationship to the existing home together. Compare privacy, entrances, outdoor space, room proportions, utility routes, and maintenance access. Resolve the major choices before committing to a detailed drawing package.

50+ five-star reviews

Top-rated ADU builders providing complete ADU construction services
Uni Construction & ADU Design

Need an ADU? We handle everything.

  • Feasibility

  • Design & Plan

  • Permit

  • Build

ADU Type ADU Type ADU Type

One ADU Contractor. Any build type.

Detached ADU Builders

Detached ADU

A detached ADU is a standalone unit with its own entrance (sometimes called a granny flat or guest house) and is perfect for generating rental income or multigenerational living for a family member.
Attached ADU Builders

Attached ADU

An attached ADU expands your home and boosts your property value by connecting new living space to the main residence. It’s often a great solution for older children or multigenerational living.
Room Addition ADU Builders

Room Additions

Room additions reimagine part of your existing home or add square footage to create a comfortable, functional living area. We help you determine if adapting or expanding your current layout is the simplest and most cost-effective path.
Garage Conversion ADU Builders

Garage Conversion

Converting a garage can turn underused space into a legal, livable ADU. It’s often the fastest way to add housing, but it comes with design and code considerations. We walk you through the feasibility, costs, and upgrades needed.

Start with inspiration

Browse ADU floor plans

Coordinate architectural information with the required engineering, energy documentation, and other project disciplines. The agreed scope should state which documents are included, which specialists are involved, and who is responsible for their work.

Browse floor plans
1192 sq ft 4-bedroom 2-bath ADU floor plan
4 BR | 2 BA
  • 1192 SF
  • 4 Bed
  • 2 Bath
749 sq ft 2-bedroom 2-bath ADU floor plan
2 BR | 2 BA
  • 749 SF
  • 2 Bed
  • 2 Bath
800 sq ft 2-bedroom 2-bath ADU floor plan
2 BR | 2 BA
  • 800 SF
  • 2 Bed
  • 2 Bath
650 sq ft 2-bedroom 1-bath ADU floor plan
2 BR | 1 BA
  • 650 SF
  • 2 Bed
  • 1 Bath
400 sq ft 1-bedroom 1-bath ADU floor plan
1 BR | 1 BA
  • 400 SF
  • 1 Bed
  • 1 Bath

we handle everything

End-to-end ADU project management

As experienced ADU builders, we make the process easy, handling everything from design to construction with clarity and precision. Our team manages each step to deliver high-quality results and complete peace of mind, so you can simply enjoy your new space.

Before we start building your Accessory Dwelling Unit, we do a detailed feasibility study, evaluating zoning regulations, building codes, and potential red tape to show exactly what’s possible for your property. Whether you envision multigenerational living or a backyard cottage, we align design with legal requirements and your lifestyle goals. Our streamlined process establishes a realistic budget, passive income potential, sets clear expectations, and provides full transparency and confidence for your long-term investment from day one.
Learn more

Prepare submissions and respond to review comments within the agreement. When construction is included, use the approved documents and written scope to plan procurement, inspections, changes, and closeout. Submission, approval, and authorization to occupy are distinct milestones.

Forget the complexities of permits and building codes, we handle it all. Our experienced team manages every detail of permit submissions, building department approvals, code compliance, and inspections, ensuring a smooth and swift process that keeps your accessory dwelling unit project on track without delays.
Learn more

Your dedicated Project Manager oversees the entire construction process of your ADU. They handle everything from utility integration to final touches. They ensure the project progresses on time, maintains quality, and communicates clearly at every step. Our general contractors deliver high-quality workmanship, bringing your vision to life seamlessly and without surprises.
Learn more

Explain who will live in the ADU, the rooms and features required, and your priorities for privacy, maintenance, and future use. Share budget expectations early so options can be compared against a useful brief.

Consider a detached home, garage conversion, or attached arrangement where appropriate. Evaluate what each option changes about the main property as well as what it adds. Record unresolved site questions before choosing a direction.

Maximize your accessory dwelling unit investment by boosting your property value and earning extra income with our comprehensive rental support services. From market analysis and tenant attraction to compliance guidance, we'll help you confidently navigate renting your ADU, ensuring optimal returns, extra income, and minimal stress.
Learn more

Advance the preferred concept with dimensions, openings, systems, and required technical details. Confirm selections that affect the documents. Coordinate revisions across disciplines before submission and again when review comments arrive.

ADU design & construction in Los Angeles

Serving homeowners across Los Angeles and surrounding cities, with offices in Diamond Bar, Los Angeles, and Pomona.

Exploring ADU Options

Where should I start with my ADU?

Thinking about an ADU

Not sure if an ADU is right for you? Curious about costs of building, zoning details, or whether you need a feasibility study? We can walk you through the basics and give you a clear picture of your options and the basics of ADUs.
Start here to learn the basics

I’m weighing my options

Done some research but still comparing paths? Should you hire separate designers and ADU builders, general contractors, or one trusted design-build partner? Learn why the design-build approach cuts through red tape, saves time, and delivers better value.
The design-build difference

I’m ready to build my ADU

If you’re ready to move forward, we’ll make the process seamless. Our team will review your property, handle permits, and create a tailored plan to design and build your ADU, so you can focus on enjoying your new space.
Get my custom ADU proposal

ADU Regulations

The easy way to build an ADU is here

Confirm permit conditions, construction inclusions, allowances, exclusions, and access arrangements. Identify procurement decisions and inspection stages. Agree how changes will be documented, then review the required closeout and final approvals at handover.

smaller adu setbacks

Smaller ADU setbacks

Allowing you to do more with your property.
reduce adu costs

Reduced ADU costs

Carrying out cost-effective construction without compromise.
expideted

Expedited ADU approvals

Speeding up the permit approval timeline for ADUs.
list-icon-2

ADU parking requirements

Alleviating the parking space requirement for ADUs.
list-icon-4

Additional ADUs

Supporting both ADUs and Junior ADUs on a single property.
list-icon-6

Bigger ADU builds

Greater build sizes Making even larger ADUs possible.

Our reviews

Yelp review

“He also provided realistic timelines which he maintained. Above all, he knows his craft.”

Leo O.

Review excerpt · Yelp
View on Yelp
Yelp review

“Their expertise, competitive pricing, and impressively fast response time made the entire experience smooth and stress-free.”

I-ting W.

Review excerpt · Yelp
View on Yelp
Yelp review

“Min is very responsive and communicates well with our team.”

Brandon L.

Review excerpt · Yelp
View on Yelp
Yelp review

“Min always responds to my requests quickly, and helps me revise the plan many times until the ADU permit application is approved.”

Doris C.

Review excerpt · Yelp
View on Yelp
Google review

“They did full design that helped me get city permit approval.”

Sonia Hobbs

Review excerpt · Google
View on Google
Google review

“Uni construction came in with better cost but more so solved many problems that architect had created!”

Forest Jones

Review excerpt · Google
View on Google
Google review

“They did a great job on my plans for a detached ADU and getting them fully approved by the city.”

Josue Moreno

Review excerpt · Google
View on Google

ADU INSIGHTS

ADU contractors you can count on

Aerial view of a Los Angeles neighborhood with a detached backyard unit ,  What Is ADU Construction illustration for Uni Construction blog.

What Is ADU Construction?

ADU construction involves planning, permitting, and building a self-contained living space on a residential property , adding value, flexibility, and income potential without buying new land.

Learn More
Aerial view of ADU site preparation backyard – When Should You Build an ADU

ADU Design & Construction for your property

ADU construction involves planning, permitting, and building a self-contained living space on a residential property , adding value, flexibility, and income potential without buying new land. In California, ADUs now make up about one in six new homes, reflecting their growing role in solving the state’s housing shortage.

Learn More
Aerial view of professional ADU construction showing framed structure and residential site , Why Choose a Professional ADU Builder

ADU Design & Construction for your property

Consider independence, privacy, entry conditions, and practical storage. Discuss future needs while the layout is flexible, especially where an occupant may benefit from easier circulation or a different bathroom arrangement.

Learn More
Modern Los Angeles home representing where ADUs can be built on residential lots.

ADU Design & Construction for your property

Plan durable finishes, laundry, maintenance access, outdoor separation, and operating responsibilities. Compare a realistic ownership budget separately from projected rent; future occupancy, income, and value are not guaranteed by the design.

Learn More
Construction workers framing a detached ADU structure CA during the early building process

ADU Design & Construction for your property

Check the documented use, structure, floor level, and services before assuming a garage or interior area can be reused unchanged. A conversion may retain a footprint while still requiring substantial work to meet residential requirements.

Learn More

Calculate your
ADU ROI

Our calculator offers a clear look at what your return on investment will be for your ADU project.

$ Maximum value ranges from 1$ to 1000000$
$ Maximum value ranges from 1$ to 1000000$
Total Return On Your ADU Investment

1,739%

Compare to other investments:

Real Estate

Avg. 6-8%

Stocks

Avg. 5-7%

Savings Account

Avg. 2-4%

Financing your ADU
made simple

We proudly extend flexible financing options to the homeowners we serve, breaking down the full cost of an ADU into manageable payment schedules. Here's how our process works.

1

Easily apply online

Easily apply with our hassle-free online process.

2

Pre-qualify

See if you pre-qualify for an even quicker turnaround.

3

Fast review process

Sit back and relax while we handle the review process.

4

Approval

Receive a notification the moment you’re approved.

Your top ADU questions answered

Answers to your most common ADU building questions.

A useful estimate needs a defined unit, site assumptions, connection scope, specifications, and exclusions. Separate design and approvals, site work, and building construction. Ask which items are fixed, which are allowances, and what has not yet been investigated.

Share the plan source and permission to use it. A preferred layout can be a starting point, but it must be tested against the site and developed into the required documents. A visual plan is not automatically a permit-ready or construction-ready package.

Discuss the services you need and the stage you have reached. A design-only scope differs from a construction agreement. If several parties are involved, identify who coordinates drawings, permit responses, pricing, and changes between them.

Compare the scope as well as the finished-home photos. Ask who develops the design, coordinates engineering, responds to permit comments and manages construction. The best ADU builders for your project should explain their relevant experience, exclusions, communication process and how changes are handled. Uni Construction starts with your property and household goals before defining the agreed work.

An accessory dwelling unit is a complete small home, and the site around it is part of the design. Its entrance, living spaces, kitchen, bathroom, storage, and building systems need to work together. The first useful question is what kind of home the property can support and what its future occupant needs.