As-Built Patio Enclosure Permit Design in Gardena

Interior of the enclosed patio in Gardena
Original open patio exterior in Gardena
Enclosure framing during work in Gardena
Patio enclosure floor and roof plans in Gardena
Patio enclosure elevations and sections in Gardena

Project overview

Behind the project

A Gardena homeowner needed drawings for a patio enclosure that had already been built. Uni Construction documented the existing layout and framing and helped the homeowner obtain a permit. The plans identify the 280 sq ft enclosure as unconditioned utility and storage space.

Explore the Pasadena pool redesign drawings for another outdoor-space project.

Scope of work

  • Prepare as-built architectural drawings for the existing patio enclosure for permit review.
  • Document the floor and roof layouts, elevations, and framing and connection details.
  • Show the enclosure as unconditioned utility and storage space with no HVAC or plumbing.

What the plans show

The revised cover sheet lists 280 sq ft of patio area. The floor plan identifies an existing bedroom and bathroom in the main house. Those rooms are outside the enclosure, and the plans do not establish a total bedroom count for the house.

Project at a glance

Location
Gardena, CA
Patio enclosure
280 sq ft
Bedrooms in enclosure
None
Bathrooms in enclosure
None
Book a free consultation

Project FAQs

Is the Gardena patio enclosure a habitable room or an ADU?

The drawings identify the enclosure as non-habitable utility and storage space. The existing bedroom and bathroom shown on the sheet are in the main house, outside the enclosure.

What was included in the as-built patio enclosure drawings?

The set shows the floor and roof layouts, exterior elevations, sections, and framing connections. These drawings record how the existing enclosure was built.

Did the Gardena patio enclosure include heating or plumbing?

The plans show an unconditioned enclosure with no HVAC or plumbing in that space.