Home Additions & Remodeling

More room. A home that still works.

Expand or reshape your home around the way you want to live. Uni Construction helps plan additions and remodels with attention to the existing building, structural connections, circulation, systems, and the practical conditions of construction.

Living room with fireplace and balcony — UNI-CM project
Living room with fireplace and balcony — UNI-CM project Living room with fireplace and balcony — UNI-CM project

Los Angeles ADU BUILDERS

Our Promise To You

Home Additions & Remodeling for your property

Collage showcasing ADU construction in Los Angeles, featuring modern design and quality craftsmanship. Images include a stylish ADU bathroom, an exterior view of a completed ADU, an aerial view of construction progress, and a furnished interior living space. Highlights the attention to detail and seamless integration typical of Los Angeles ADU projects.
Stress-Free ADU Construction Services in Los Angeles

Home Additions & Remodeling for your property

An addition changes more than the edge of a floor plan. It can affect light, movement between rooms, roof and drainage details, existing systems, and the way the home relates to its yard. The goal is useful new space with a deliberate connection to the rooms you already have.

Los Angeles ADU Builders with 20 Years of Expertise

20 years of ADU expertise

A remodel may also involve structural changes, new services, or a change in how an area is used. Define the extent of work clearly, including the existing rooms and exterior areas affected by the new design. The drawings and proposal should distinguish retained, removed, and proposed construction.

Affordable ADU Construction Services in Los Angeles

Home Additions & Remodeling for your property

Document the spaces affected and review available records. Compare circulation, furniture, daylight, and the relationship between new and existing rooms. Resolve the purpose of the addition before assuming that a larger footprint alone will solve the problem.

Full-Service ADU Construction Company

Trust the process, love your ADU

Coordinate new openings, altered load paths, foundations, and connections with the responsible structural professional. Existing construction may need investigation. A change that appears small on a floor plan can have consequences elsewhere in the building.

50+ five-star reviews

Top-rated ADU builders providing complete ADU construction services
Uni Construction & ADU Design

Need an ADU? We handle everything.

  • Feasibility

  • Design & Plan

  • Permit

  • Build

ADU Type ADU Type ADU Type

One ADU Contractor. Any build type.

Detached ADU Builders

Detached ADU

A detached ADU is a standalone unit with its own entrance (sometimes called a granny flat or guest house) and is perfect for generating rental income or multigenerational living for a family member.
Attached ADU Builders

Attached ADU

An attached ADU expands your home and boosts your property value by connecting new living space to the main residence. It’s often a great solution for older children or multigenerational living.
Room Addition ADU Builders

Room Additions

Room additions reimagine part of your existing home or add square footage to create a comfortable, functional living area. We help you determine if adapting or expanding your current layout is the simplest and most cost-effective path.
Garage Conversion ADU Builders

Garage Conversion

Converting a garage can turn underused space into a legal, livable ADU. It’s often the fastest way to add housing, but it comes with design and code considerations. We walk you through the feasibility, costs, and upgrades needed.

Start with inspiration

Browse ADU floor plans

Plan roof connections, weather protection, drainage, heating and cooling, plumbing, and electrical work together. Define the areas of the existing home affected by tie-ins. Matching an exterior finish does not by itself resolve the technical connection.

Browse floor plans
1192 sq ft 4-bedroom 2-bath ADU floor plan
4 BR | 2 BA
  • 1192 SF
  • 4 Bed
  • 2 Bath
749 sq ft 2-bedroom 2-bath ADU floor plan
2 BR | 2 BA
  • 749 SF
  • 2 Bed
  • 2 Bath
800 sq ft 2-bedroom 2-bath ADU floor plan
2 BR | 2 BA
  • 800 SF
  • 2 Bed
  • 2 Bath
650 sq ft 2-bedroom 1-bath ADU floor plan
2 BR | 1 BA
  • 650 SF
  • 2 Bed
  • 1 Bath
400 sq ft 1-bedroom 1-bath ADU floor plan
1 BR | 1 BA
  • 400 SF
  • 1 Bed
  • 1 Bath

we handle everything

End-to-end ADU project management

As experienced ADU builders, we make the process easy, handling everything from design to construction with clarity and precision. Our team manages each step to deliver high-quality results and complete peace of mind, so you can simply enjoy your new space.

Before we start building your Accessory Dwelling Unit, we do a detailed feasibility study, evaluating zoning regulations, building codes, and potential red tape to show exactly what’s possible for your property. Whether you envision multigenerational living or a backyard cottage, we align design with legal requirements and your lifestyle goals. Our streamlined process establishes a realistic budget, passive income potential, sets clear expectations, and provides full transparency and confidence for your long-term investment from day one.
Learn more

Discuss work zones, access, temporary protections, service interruptions, and whether parts of the house can remain occupied. Include restoration and finishing around affected areas in the scope. Establish inspection stages and a written process for discovered conditions and changes.

Forget the complexities of permits and building codes, we handle it all. Our experienced team manages every detail of permit submissions, building department approvals, code compliance, and inspections, ensuring a smooth and swift process that keeps your accessory dwelling unit project on track without delays.
Learn more

Your dedicated Project Manager oversees the entire construction process of your ADU. They handle everything from utility integration to final touches. They ensure the project progresses on time, maintains quality, and communicates clearly at every step. Our general contractors deliver high-quality workmanship, bringing your vision to life seamlessly and without surprises.
Learn more

Explain which activities the home does not support and what needs to change. Share records, photos, priorities, and budget expectations. Compare reconfiguration with expansion when both may address the brief.

Test how the proposed space links to the existing rooms, yard, and entry. Review doors, circulation, daylight, and furniture. Decide which areas need alteration and which should remain protected during the project.

Maximize your accessory dwelling unit investment by boosting your property value and earning extra income with our comprehensive rental support services. From market analysis and tenant attraction to compliance guidance, we'll help you confidently navigate renting your ADU, ensuring optimal returns, extra income, and minimal stress.
Learn more

Develop the selected design with structural and other required documentation. Clearly describe existing and proposed work. Coordinate authority responses and confirm remaining permit conditions before finalizing the construction sequence.

ADU design & construction in Los Angeles

Serving homeowners across Los Angeles and surrounding cities, with offices in Diamond Bar, Los Angeles, and Pomona.

Exploring ADU Options

Where should I start with my ADU?

Thinking about an ADU

Not sure if an ADU is right for you? Curious about costs of building, zoning details, or whether you need a feasibility study? We can walk you through the basics and give you a clear picture of your options and the basics of ADUs.
Start here to learn the basics

I’m weighing my options

Done some research but still comparing paths? Should you hire separate designers and ADU builders, general contractors, or one trusted design-build partner? Learn why the design-build approach cuts through red tape, saves time, and delivers better value.
The design-build difference

I’m ready to build my ADU

If you’re ready to move forward, we’ll make the process seamless. Our team will review your property, handle permits, and create a tailored plan to design and build your ADU, so you can focus on enjoying your new space.
Get my custom ADU proposal

ADU Regulations

The easy way to build an ADU is here

Confirm selections, access, household arrangements, and protection measures. Coordinate required inspections and record changes. Complete the agreed restoration, closeout information, and final signoffs so the addition becomes a usable part of the home.

smaller adu setbacks

Smaller ADU setbacks

Allowing you to do more with your property.
reduce adu costs

Reduced ADU costs

Carrying out cost-effective construction without compromise.
expideted

Expedited ADU approvals

Speeding up the permit approval timeline for ADUs.
list-icon-2

ADU parking requirements

Alleviating the parking space requirement for ADUs.
list-icon-4

Additional ADUs

Supporting both ADUs and Junior ADUs on a single property.
list-icon-6

Bigger ADU builds

Greater build sizes Making even larger ADUs possible.

Our reviews

Yelp review

“He also provided realistic timelines which he maintained. Above all, he knows his craft.”

Leo O.

Review excerpt · Yelp
View on Yelp
Yelp review

“Their expertise, competitive pricing, and impressively fast response time made the entire experience smooth and stress-free.”

I-ting W.

Review excerpt · Yelp
View on Yelp
Yelp review

“Min is very responsive and communicates well with our team.”

Brandon L.

Review excerpt · Yelp
View on Yelp
Yelp review

“Min always responds to my requests quickly, and helps me revise the plan many times until the ADU permit application is approved.”

Doris C.

Review excerpt · Yelp
View on Yelp
Google review

“They did full design that helped me get city permit approval.”

Sonia Hobbs

Review excerpt · Google
View on Google
Google review

“Uni construction came in with better cost but more so solved many problems that architect had created!”

Forest Jones

Review excerpt · Google
View on Google
Google review

“They did a great job on my plans for a detached ADU and getting them fully approved by the city.”

Josue Moreno

Review excerpt · Google
View on Google

ADU INSIGHTS

ADU contractors you can count on

Aerial view of a Los Angeles neighborhood with a detached backyard unit ,  What Is ADU Construction illustration for Uni Construction blog.

What Is ADU Construction?

ADU construction involves planning, permitting, and building a self-contained living space on a residential property , adding value, flexibility, and income potential without buying new land.

Learn More
Aerial view of ADU site preparation backyard – When Should You Build an ADU

Home Additions & Remodeling for your property

ADU construction involves planning, permitting, and building a self-contained living space on a residential property , adding value, flexibility, and income potential without buying new land. In California, ADUs now make up about one in six new homes, reflecting their growing role in solving the state’s housing shortage.

Learn More
Aerial view of professional ADU construction showing framed structure and residential site , Why Choose a Professional ADU Builder

Home Additions & Remodeling for your property

An addition expands the existing home; an ADU creates a separate dwelling arrangement with its own applicable requirements. Start with intended use and household independence, then confirm the appropriate project type for the property.

Learn More
Modern Los Angeles home representing where ADUs can be built on residential lots.

Home Additions & Remodeling for your property

Discuss the rooms and services affected by each phase. Occupancy depends on the scope and safe practical arrangements. Do not assume that living through a remodel is possible simply because the new work is concentrated at one side of the house.

Learn More
Construction workers framing a detached ADU structure CA during the early building process

Home Additions & Remodeling for your property

Review roof form, proportions, openings, and materials alongside technical details. A coherent addition can use compatible or distinct elements, but the connection should be intentional and supported by a complete drawing package.

Learn More

Calculate your
ADU ROI

Our calculator offers a clear look at what your return on investment will be for your ADU project.

$ Maximum value ranges from 1$ to 1000000$
$ Maximum value ranges from 1$ to 1000000$
Total Return On Your ADU Investment

1,739%

Compare to other investments:

Real Estate

Avg. 6-8%

Stocks

Avg. 5-7%

Savings Account

Avg. 2-4%

Financing your ADU
made simple

We proudly extend flexible financing options to the homeowners we serve, breaking down the full cost of an ADU into manageable payment schedules. Here's how our process works.

1

Easily apply online

Easily apply with our hassle-free online process.

2

Pre-qualify

See if you pre-qualify for an even quicker turnaround.

3

Fast review process

Sit back and relax while we handle the review process.

4

Approval

Receive a notification the moment you’re approved.

Your top ADU questions answered

Answers to your most common ADU building questions.

That can be explored against the property, existing structure, intended use, and applicable requirements. Bring a description of the space you need rather than a fixed footprint, so layout alternatives can be evaluated before detailed design.

The proposal should identify architectural drawings, required engineering, supporting documents, submission coordination, and fees separately. These services are not automatically included in every remodel or construction agreement.

Use the same drawings, specifications, existing-condition assumptions, and restoration scope. Compare allowances, exclusions, temporary protections, and how changes are priced. An estimate with omitted tie-in work may appear lower without describing the same project.

Our work

A closer look inside.

living room entry view — Uni Construction project
living room wide — Uni Construction project
living room fireplace balcony — Uni Construction project
reading nook home office — Uni Construction project
home office open living area — Uni Construction project
dining room wide — Uni Construction project
dining room arched window detail — Uni Construction project
kitchen wood cabinets — Uni Construction project
bedroom wide — Uni Construction project
bedroom window view — Uni Construction project
bedroom mirrored wardrobe — Uni Construction project