Detached ADU Sierra Madre Grand View

Detached ADU Sierra Madre Grand View
Sierra Madre ADU floor plan, roof plan and elevations
Sierra Madre ADU site plan
Detached ADU Sierra Madre Grand View ,  source gallery image 3
Detached ADU Sierra Madre Grand View ,  source gallery image 4

Project overview

Behind the project

Uni Construction prepared design drawings to help a property manager permit prior ADU work in Sierra Madre. The floor plan shows one bedroom, one bathroom, and a combined living and kitchen area.

Scope of work

  • Document the existing ADU layout and roof configuration.
  • Show exterior elevations, electrical symbols, and door and window schedules for permit review.

Project at a glance

Client
Property Manager
Location
Sierra Madre
Year
2023
Role
Design
Type
ADU
Bedrooms shown
1
Bathrooms shown
1
Represented
Property Manager
Book a free consultation

Project FAQs

What did the Sierra Madre ADU permit drawings include?

The sheets include the one-bedroom floor plan, roof plan, four elevations, an electrical legend, and door and window schedules.