Detached ADU in Los Angeles
Project overview
Behind the project
Uni Construction provided design services for this detached ADU in Los Angeles. The first-floor drawing shows an open kitchen, dining, and living area, with two sleeping rooms drawn along the opposite side. A separate sheet documents the proposed roof.
Explore the Highland detached ADU design gallery.
Explore the West Covina detached ADU permit design project.
Scope of work
- Develop the proposed first-floor layout for the detached unit.
- Document the roof layout on a separate drawing.
Project at a glance
- Client
- Homeowner
- Location
- Los Angeles
- Year
- 2021
- Role
- Design
- Type
- ADU
- Represented
- Designer
Project FAQs
How is the Los Angeles detached ADU laid out?
The first-floor drawing groups the kitchen, dining, and living space together, with two separate rooms shown with beds.
More Projects
Design
Detached ADU in West Covina Marbury
Design · ADU · West Covina · 2024
Design
Detached ADU Sierra Madre Grand View
Design · ADU · Sierra Madre · 2023
Design
Detached ADU at Tiburon
Design · ADU · Tiburon · 2022
Design
Existing Garage Conversion to ADU - Los Angeles Lowell
Design · ADU · Los Angeles · 2023
Design
Detached ADU - Arcadia Loma Verde
Design · ADU · Arcadia · 2023
Design
Detached ADU in Highland
Design · ADU · Highland · 2021

