Floor Plans

700 sqft ADU floor plans

A 700 sq ft Accessory Dwelling Unit (ADU) strikes the perfect balance between comfort, flexibility, and efficient use of space, ideal for homeowners looking to add livable square footage or generate rental income. This versatile size comfortably supports spacious one-bedroom layouts or efficient two-bedroom designs, adaptable to site conditions and local zoning requirements.

Customize any design to suit your individual needs.

Adjustment options available for your perfect ADU.

In-house designers will adapt any layout to your exact requirements.

Filter by...

360 sq.ft

1200 sq.ft

Sort by

View:

Customize any design to suit your individual needs.

Adjustment options available for your perfect ADU.

In-house designers will adapt any layout to your exact requirements.

No matching plans...

Let’s customize your dream ADU from scratch!
Custom Plan

Large Floor Plans 7 results

Medium Floor Plans 8 results

Small Floor Plans 8 results

700 SF

2 Bed

1 Bath

700 SF

2 Bed

2 Bath

Compact Floor Plans 12 results

Designed to live larger

700 sq ft ADU floor plans

With just the right amount of space for comfortable, flexible living, this ADU size strikes a balance between functionality and ease of design. It supports a range of lifestyle needs, from private retreats to rental units, while adding lasting property value through thoughtful Architectural Designs and efficient kitchen layouts.

This footprint gives you room to breathe without overwhelming your lot or construction budget. It fits well within the ADU requirements for your property and offers layout flexibility that aligns with locality regulations, permit fees, and the potential to generate long-term rental income.

Open layouts, vaulted Ceiling Heights, and large windows help the interior feel bright and airy. Smart use of flow, integrated Plumbing Drawings, and hidden storage ensures every area feels purposeful and well-proportioned.

From full-size kitchens with a kitchen peninsula to in-unit laundry and flexible-use rooms, you can customize the space based on your day-to-day needs. Whether for daily living or occasional guests, Semi-Custom options let you prioritize comfort without adding unnecessary construction time.

Strategic layout decisions, like split bedrooms, sound-reducing walls, and outdoor transitions, enhance privacy without disconnecting the space. Smart Exterior Wall planning and landscaping help reduce noise control concerns while enhancing comfort.

Designed to meet building codes and setback rules, this ADU can be positioned to maximize light, ventilation, and privacy. A smart Foundation plan and structural strategy ensures compatibility with diverse lots across unincorporated Los Angeles.

With just the right amount of square footage to include meaningful features, you can focus on quality materials and lasting comfort. Durable finishes, smart energy efficiency upgrades, and a streamlined floor framing approach help create a functional space that delivers long-term value.

Build your ADU smarter, not harder

Claim your FREE guide: 9 Costly ADU Mistakes in Los Angeles & How to Avoid Them. Get insider insights from Los Angeles’s ADU experts.

9 common budget busters
Rules homeowners often overlook
Design flaws that hurt ROI
Strategies for smooth approvals

Error: Contact form not found.

triangle

700 sqft ADU designs

Why a 700 sq ft ADU makes sense

A 700 sq ft ADU offers the perfect balance between space and flexibility. It allows for a full, separate layout with generous living areas, full-size amenities, and multiple configuration options, without requiring a large lot. Whether used for family, rentals, or personal needs, this size delivers comfort, privacy, and long-term value in one efficient package.

700 square foot ADU layout ideal for multigenerational living with privacy and comfort

Ideal for multigenerational living

Offer family members their own comfortable, private space.
700 square foot ADU designed for strong rental appeal with full features

Strong rental appeal

Attract long-term tenants and increase rental income.
700 sq ft ADU offering space to grow for young adults or evolving needs.

Space to grow

Ideal starter space for young adults seeking independence.
Design of a 700 square foot ADU used as a personal retreat or quiet getaway

Your personal retreat

Create a home office, studio, or relaxing getaway.
700 sq ft ADU floor plan that adds real home value through smart, compact design

Add real home value

Boost resale value with functional, appealing design.
Smart and adaptable 700 sq ft ADU investment with flexible floor plan options

Smart, adaptable investment

Flexible use now and adaptable for future needs.

Our Design Philosophy

Custom vs. Pre-approved plans

Built around your priorities

A custom 700 sq ft ADU lets you personalize your space, whether a guest suite, home office, or expanded kitchen, to perfectly fit your lifestyle and future plans.

Long-term value, not just speed

Unlike pre-approved plans, custom designs maximize usability, resale value, and adaptability for rental or family needs, making your ADU a lasting investment.

Designed to fit your lot

Custom plans are designed specifically for your property's size, shape, and local regulations, ensuring a seamless, naturally integrated ADU built without permitting issues.

What’s the ROI for
700 sq ft ADU?

Wondering how a 700 sq ft ADU can impact your bottom line? Our ROI calculator helps you estimate potential rental income, property value increase, and long-term financial benefits based on your goals. See how this versatile unit can become a smart, income-generating asset on your property. Quick, easy insights, built around your investment.

$ Maximum value ranges from 1$ to 1000000$
$ Maximum value ranges from 1$ to 1000000$
Total Return on Your ADU Investment

1,739%

Compare to other investments:

Real Estate

Avg. 6-8%

Stocks

Avg. 5-7%

Savings Account

Avg. 2-4%

Bedroom interior of a 700 sq ft ADU with layered textures and accent wallpaper.

A tip from our designer...

decorative

Sarah

Interior Designer
"A 700 sq ft ADU provides the perfect canvas for creating a stylish, functional space that lives larger than its footprint. Start with a layout that defines clear zones, like dedicated bedrooms and flexible living areas, while maintaining an open, connected feel in the main gathering spaces. Use vertical elements like tall cabinetry, wall-mounted shelving, and light-enhancing finishes to boost storage and visual space. Incorporate thoughtful touches like pocket doors, layered lighting, and multi-purpose furniture to add comfort without clutter. With intentional design choices, a 700 sq ft ADU can feel expansive, efficient, and effortlessly modern."

Popular 700 sq ft ADU layouts

A 700 sq ft ADU strikes the sweet spot between spacious living and efficient design, ideal for homeowners who want more flexibility without going oversized. These layout ideas offer smart room configurations, full-sized features, and thoughtful flow to suit everything from multigenerational living to rental opportunities. Each one is thoughtfully crafted to meet local building codes, control construction costs, and reflect energy-efficient living.

Offering the most privacy, this dual-bedroom and bathroom layout works well for multigenerational living or as a high-demand rental. Each bedroom has private access to a full bath, making it ideal for couples or house-sharing scenarios. The central living and kitchen space ties the home together with warmth and flexibility, keeping design cohesive while respecting Government Code Section 65852.27(b)(2). Our Redwood and Teak floor plans are perfect examples of how great design elevates compact living.

Designed for versatility, this layout includes two bedrooms with a centrally located bathroom, ideal for roommates or small families. It provides flexibility for daily life with a central gathering space and thoughtful roof framing and electrical plans that support multiple configurations. A compact kitchen and defined living area make the most of the square footage. Our Hickory floor plan proves that even similar floor plans can feel unique with the right flow and detail.

This spacious one-bedroom layout is perfect for full-time living, offering ample space and privacy. The large bedroom includes options for a walk-in wardrobe, and the open living area enhances natural flow. A well-placed kitchen and dining area supports everyday functionality while keeping the space feeling light and open. Our Sycamore floor plan shows how to scale up living in a smaller footprint with comfort and utility in mind.

With two bedrooms and two full bathrooms, this plan supports privacy and independence within a compact footprint. Each bedroom is thoughtfully separated and ideal for Master Suites or guest accommodations. The layout maintains flow through the central living area, with space-saving kitchen design options like a peninsula or breakfast bar. See how our Acacia floor plan balances comfort and compliance with fire safety and accessibility standards.

This layout offers a smart and efficient use of space, providing two well-sized bedrooms and one shared bathroom. It’s ideal for small families, guests, or long-term rentals seeking both comfort and function. The open living area connects easily to the kitchen, allowing residents to move around freely while maintaining clear zoning. Our Almond floor plan is a great example of how to maximize comfort and value in 700 square feet without exceeding impact fees or zoning limits.

Build your 700 sq ft ADU with confidence

From initial ideas to final walk-through, we manage every stage of your 700 sq ft ADU project, delivering a smooth, personalized experience that brings your vision to life with zero guesswork.

1

Discover what’s possible

We begin with a conversation to understand your goals, whether it’s added income, multigenerational living, or a dedicated retreat, and how your ADU should function day to day.

2

Tailored design solutions

Our design team collaborates with you to create a custom layout that reflects your style, fits your lot, and makes the most of every square foot.

3

Clear, upfront proposal

You’ll receive a transparent proposal with pricing, timelines, and project scope, so there are no surprises and you know exactly what to expect.

4

We handle the rest

From permits to construction, we take care of every detail, delivering a beautifully built 700 sq ft ADU that’s ready for living, renting, or anything in between.

Common questions for 700 sqft ADUs

A 700 sq ft ADU offers a great mix of space, comfort, and flexibility. Whether you're planning a rental, guest house, or extended family living, these FAQs cover key details about layout options, design features, and what to expect during the process.

A 700 sqft ADU floor plan is a compact, well-designed living space, typically featuring 1–2 bedrooms, 1–2 bathrooms, and an open-concept living/kitchen area. These layouts maximize functionality with features like laundry rooms, multi-use spaces, and space-saving elements (e.g., vaulted ceilings, built-ins, or Murphy beds). They’re ideal for small families, rentals, or guest units, offering comfort and privacy in a cost-effective footprint. For example, the “Acacia” floor plan delivers a 2-bed, 2-bath layout in just 700 sqft, complete with open living, laundry, and a compact 26' x 27' footprint, perfect for Los Angeles lots.

The most popular 700 sqft floor plan styles emphasize efficient layouts, visual openness, and livable charm. Modern minimalist homes often feature open living spaces, large windows, and clean finishes that create an airy, connected feel, sometimes even incorporating a Formal Dining Room within a compact footprint. Bungalow and cottage-style ADUs bring warmth and personality with details like a Covered Front Porch or classic exterior accents. Lofted and studio layouts make use of vertical space and multipurpose furniture for flexibility. Designs inspired by Scandinavian and Japanese principles highlight simplicity, natural light, and thoughtful flow, ideal for those focused on building homes that are both stylish and functional for the long term.

To get the most out of a 700 sqft floor plan, focus on open-concept layouts that eliminate unnecessary walls and improve flow between living zones. Incorporate multi-functional furniture, like fold-down tables, Murphy beds, and storage benches, to save room without sacrificing comfort. Vertical design elements, such as tall shelving or lofted Upstairs Bedrooms, help free up valuable floor area. Light color palettes, large windows, and mirrors can visually expand the space, making it feel open and bright. Thoughtful details like built-in nooks or under-stair storage create efficient, clutter-free environments, even in plans that might share space with Garage Features or a Detached Garage setup.

A well-planned 700 sqft ADU should feature an open-concept layout that seamlessly integrates the kitchen, dining, and living areas to create a sense of spaciousness. Most designs include 1–2 bedrooms, often as Lower Level Bedrooms, along with 1–2 bathrooms and a full kitchen equipped with smart storage solutions to maximize efficiency. Flexible-use areas such as a guest nook, home office, or even a compact laundry zone add versatility. Features like outdoor access, mechanical closets, and thoughtful touches such as a Screened Porch or optional Outdoor Kitchen Grill elevate both comfort and long-term functionality. These components come together to form a compact, flexible, and highly livable space.

Zoning regulations in unincorporated Los Angeles directly shape the design of a 700 sqft ADU by allowing greater flexibility for units under 800 sqft. These ADUs are exempt from lot coverage, floor area ratio, and open space rules, enabling more creative placement and layout. Setbacks are minimal, typically 4 feet from rear and side property lines, and single-story units under 16 feet in height benefit from relaxed restrictions. No additional parking is required in most cases, and converting existing structures like garages can use current setbacks. Overall, these regulations streamline the design and approval process, making 700 sqft ADUs easier to build and highly adaptable to a variety of lots.

A 700 square foot house is a compact yet efficient space, typically measuring around 20' x 35–45' or 32' x 21', depending on the layout and lot shape. Most floor plans include 1–2 bedrooms, 1 bathroom, and an open-concept living room and kitchen area that help the home feel more spacious. With smart use of vertical storage, multipurpose furniture, and large windows, this size can offer surprising comfort and functionality. Whether it's designed as a main residence or placed above a Garage Under or near Golf Cart Storage, it’s a great fit for individuals, couples, or small families who value affordability and simplicity.

A 700 square foot space can comfortably accommodate 3 to 4 people for daily residential living, based on HUD and building code guidelines of 150–165 sqft per person. For temporary gatherings or events, the same space can hold up to 40–70 people in a theater-style seating arrangement, depending on layout and furniture. However, this higher capacity is not suitable for long-term living. Most 700 sqft homes or ADUs are designed for 1–2 bedrooms, making them ideal for small households.

A 700 square foot home generally includes 3 to 4 rooms, depending on how the space is configured. Most layouts offer 1–2 bedrooms, 1 bathroom, and an open-concept kitchen, dining, and living area that enhances flow and usability. Some designs also include a small flex space or home office for added versatility. Whether paired with a Front Entry Garage, Oversized Garage, or even complemented by an Outdoor Fireplace, this footprint supports a functional and comfortable living environment.

No, 700 square feet is not considered a tiny home. Tiny homes are typically defined as having 400–500 sqft or less, according to the International Residential Code and tiny house movement standards. A 700 sqft home is better classified as a small or compact house, offering more space and features than traditional tiny homes. While still efficient in size, it falls outside the usual “tiny” category.