Kitchen Remodel at SFR

Kitchen remodel at Single Family Residence

Task

kitchen remodel

Role

General Contractor overseeing the entire kitchen renovation project.

About Project

At Uni Construction, we specialize in transforming kitchens in Los Angeles homes from ordinary to extraordinary. This project exemplifies our expertise in single-family residence (SFR) kitchen remodels, creating a space that elevates both function and beauty.

This inspiring kitchen remodel in an Los Angeles SFR completely revitalized the heart of the home. Uni Construction managed the entire project, from the initial design meeting to the final touches, ensuring a stress-free and efficient experience for the homeowner.

Project Scope

The kitchen remodel encompassed a comprehensive upgrade, including:

Existing cabinets Removal: Our team removed existing cabinets, countertops, appliances, flooring, and outdated fixtures.

Space Planning & Optimization: Collaborated with the homeowner to assess the existing layout and explore opportunities for improvement. This involved reconfiguring the space for better workflow or potentially modifying walls to create a more open and inviting kitchen.

Cabinetry Design & Installation: We worked closely with the homeowner to select new cabinets that perfectly match their style and storage needs. Our skilled craftspeople then handled the installation, ensuring a flawless fit and finish.

Countertop Transformation: Facilitated the selection and installation of beautiful new countertops. The chosen material, like granite, quartz, or butcher block, would depend on the homeowner’s preferences and budget.

Appliance Upgrade: The outdated appliances were replaced with brand new, energy-efficient models, including a range, dishwasher, refrigerator, and potentially other features like a microwave or a modern ventilation hood.

Flooring Refresh: The old flooring was replaced with a new material that complements the overall kitchen design. Popular options include tile, hardwood, or luxury vinyl plank flooring.

Plumbing & Electrical Expertise: Our team ensured a seamless transition by updating plumbing fixtures and electrical wiring to accommodate the new appliances and layout.

Illuminating the Space: A well-lit kitchen environment is crucial. Uni Construction designed and installed a lighting scheme that combines overhead lighting, under-cabinet lighting, and task lighting over essential areas like the sink and cooktop.

Backsplash Magic: A beautiful and functional backsplash was installed to add a touch of personality and protect the walls from splatters. This could involve ceramic tile, subway tile, or another material that complements the countertop and cabinetry.

Finishing Touches: In the last, took care of all the final details, including painting, trim work, and installing hardware for cabinets and drawers, ensuring a polished and complete renovation.

Step-by-Step Process

We follow a well-defined process to ensure a smooth and efficient project:

Initial Consultation: We discuss your vision, needs, and budget to develop a preliminary plan.

Design & Material Selection: We collaborate with you to create a detailed design and help you choose materials like cabinets, countertops, and flooring.

Permitting & Ordering: Uni Construction handles obtaining necessary permits and ordering materials to keep the project on schedule.

Demolition & Construction: Our experienced crew efficiently removes existing elements and begins construction based on the approved plan.

Installation & Finishing Touches: New cabinets, countertops, appliances, and flooring are installed. The project concludes with painting, trim work, and final details.

Final Inspection & Sign-Off: Once everything is complete, a final inspection is conducted, and upon your satisfaction, the project is signed off.

Uni Construction's Differentiators

Instead of focusing solely on the general steps, we can expand on the “Uni Construction Difference” section to showcase what sets your company apart:

3D Modeling & Visualization: We can use 3D modeling software to create a realistic visualization of your new kitchen before construction begins. This allows you to see the design come to life and make any adjustments before demolition starts.

Sustainable Practices: We prioritize eco-friendly practices whenever possible, by using recycled or sustainable materials and implementing water-saving fixtures to minimize the environmental impact of your renovation.

Detailed Project Timeline: Our team creates a detailed project timeline with clear milestones, keeping you informed of the progress and completion date.

Dedicated Project Manager: A dedicated project manager will be your main point of contact throughout the renovation, overseeing all aspects and addressing any questions or concerns you may have.

Project gallery

Top Construction Services in LA by Uni Construction

Hospitality

Mixed Use

FOOD & BEVERAGES

EDUCATION & PUBLIC SECTOR

Broad-museum-featured-image

CULTURAL

RETAIL & RESIDENTIALS