Same-capacity replacement
Replace worn or obsolete equipment while keeping the existing service capacity.
What moves the price
Panel and breaker condition, access, grounding, and repairs around the enclosure.
Los Angeles County
Replace an aging panel or add capacity for an ADU or EV charger. Get a written scope for utility coordination, inspection, and stucco repairs around the new panel.
CSLB License #1026926General contractor


The biggest difference between quotes is often what happens outside the panel. Compare whether each quote covers the meter, utility work, grounding, permits, and repairs after installation.
Replace worn or obsolete equipment while keeping the existing service capacity.
What moves the price
Panel and breaker condition, access, grounding, and repairs around the enclosure.
Increase service capacity when the load calculation and utility review show it is appropriate.
What moves the price
Meter equipment, service wiring, utility scheduling, permit fees, and inspection.
Move the panel or change how power reaches it when the project calls for it.
What moves the price
New conduit routes, trench length, driveway or yard repairs, and exterior finish work.
A panel’s condition and your home’s electrical demand are separate questions. Both belong in the assessment.
Start with the label you can see on the closed panel and any note from your insurer or home inspector. If you’re working against a renewal or closing date, include it in the request so the permit and utility schedule can be checked early.

Ask whether they need a contractor invoice, a photo of the installed panel, or a final inspection record. Share the request up front so those items can be accounted for in the scope.
A 200-amp panel rating is only one part of a 200-amp service. The assessment looks at the equipment feeding the panel as well as the power your home needs.
Adding an ADU? Use our ADU electrical walkthrough checklist to gather equipment details and photos before your electrician visits.

List the appliances and equipment you plan to add, such as an EV charger or ADU water heater. Your electrician uses that list to check what your existing service can support.
Check what can stay, what needs replacement, and what requires utility review. Moving an overhead service underground is a separate scope of work.
Ask which circuits will transfer to the new panel and whether new circuits for the ADU or charger are priced separately.
See what your written estimate covers before the job starts, including who coordinates the power shutoff and what we’ll repair around the panel.

See which parts are being replaced, from the panel and breakers to the meter equipment and service wiring. The estimate also lists the grounding, bonding, and circuit labeling work it covers.

We confirm which agency and utility serve your address, then coordinate the permit, inspection, and any required disconnect and reconnect. Ask us which dates are confirmed before planning around the outage.

If we need to open the wall, the estimate shows what gets patched and whether it includes texture matching and paint. It lists any trenching and driveway or yard repairs separately.
Both sample quotes specify a 200-amp panel. The difference is what each quote puts in writing. Use these four lines to see what you’re paying for before you compare totals.
If the upgrade is part of a larger build, check the ADU costs Los Angeles homeowners often miss for other items to look for in the construction bid.
| What to compare | Quote AShort scope | Quote BItemized scope |
|---|---|---|
| Electrical equipment | 200A panel and breakers. | 200A panel, breakers, meter equipment, and service wiring listed separately. |
| Permits and utility | “Permit included.” No detail on inspection or utility scheduling. | Names who files the permit, books inspection, and coordinates disconnect and reconnect. |
| Wall and yard repairs | “Patch as needed.” Texture and paint are unspecified. | Shows the area to patch and specifies texture and paint. Lists trenching or yard repairs separately if needed. |
| Changes after the quote | Additional work billed separately. | Explains how added work, such as a utility-requested meter move, will be priced and approved. |
The upgrade process
The time without power and the full project schedule are two different things. Permit review, utility availability and any relocation work can affect the overall schedule.
1
Show us where the panel and meter sit and tell us what you plan to power. A site visit and load calculation can confirm the right scope before pricing.
2
We confirm who serves the address, including SCE or LADWP where applicable, and plan the required inspections and utility work.
3
Before work starts, confirm the planned outage window so you can make arrangements for refrigeration, work equipment or anything else that needs power.
4
We coordinate final inspection and reconnection as required and complete the exterior repairs listed in the estimate.
Ask when power will go off and who will confirm it’s back on. Use the walkthrough at the end to check the new panel, the wall finish, and your paperwork.

BeforeWeathered box and uneven patch
Clear a path to the meter and panel. Plan for the outage, including refrigeration, home-office equipment, garage-door access, and any medical equipment that needs continuous power.

AfterFlush panel and blended stucco
Review the breaker labels and check the patched wall against your estimate. Collect the inspection record, itemized invoice, and any applicable warranty details.
An ADU’s kitchen, water heater, heating and cooling can add to the load on the main house. Review service capacity and the route to the new unit while you’re planning the project.
Our LA ADU electrical planning guide explains how a load calculation helps determine whether the ADU can use a subpanel or needs more service capacity. If you’re converting a garage, see which garage conversion loads to plan for before finalizing the budget.

Southern California Edison’s Charge Ready Home program offers two rebate paths. Start with your existing panel rating and whether it can support Level 2 charging.

You’ll need residential SCE service and a qualifying household income, public assistance enrollment, or address in a designated disadvantaged community. SCE ends the disadvantaged-community rebate path on January 1, 2027.
You can apply without owning or leasing an EV. The panel-and-outlet rebate comes with a Level 2 charger installation deadline. Confirm the date with SCE when you apply.
Keep the panel cover in place. Photos of the outside help the team see the setup and flag what needs a closer look on site.
Stand where you can safely show how they sit together. If the label is readable from where you stand, include it.
Show the surrounding wall and ground. Include nearby doors, windows, or equipment that could affect access or relocation.
Share your ZIP code and what you’re planning so we can check the utility and permitting process for your address.
Contractor license
Getting started
Share your ZIP code and what you’re planning
Send photos or discuss the existing panel
Review your written project scope
Get specific about the price, paperwork and rebate before you request a quote.

Compare local published prices and check what’s included for the meter, permits and wall repair.
Read the guide
Find out who handles the meter review, planned outage, inspection and reconnection.
Read the guide
Compare both rebate paths and see what to collect before you apply.
Read the guideWhat homeowners ask before they schedule the work.
Start with the existing service and the equipment you plan to add. A load calculation helps determine whether the service can support the new demand and whether load management is an option.
The utility and permitting agency may need to review the existing location. Tell us if the meter is near doors, windows, gas equipment or a new addition so we can flag location constraints early.
The estimate should identify the circuits that can remain and any wiring that needs replacement. The condition of the existing wiring and the scope of the project determine what is required.
Expect a planned interruption for a main-service panel swap. Ask for the anticipated outage window and who confirms that power can be restored after the work.
Yes. Send your ZIP code and a short description of the project. Photos help with the initial review. Final pricing may depend on an on-site assessment or utility review.
Enter your contact details and property ZIP code so we can follow up about your project.