200-Amp Electrical Panel Upgrade Cost in Los Angeles County

share Share

4 min read

Compare local published estimates and see how meter relocation, permits, utility work and stucco repairs change a panel-upgrade quote.

Illustrative closed electrical panel and meter on a stucco wall

What a 200-amp upgrade costs in Los Angeles

Ceon Electric publishes $2,500–$4,500 for a standard 100-to-200-amp upgrade that keeps the meter in place and leaves the service mast alone. Its range rises to $4,000–$6,500 when the job includes meter-main or mast work. If you’re budgeting for a specific address, the first question to ask is what can stay. Ceon Electric’s Los Angeles pricing guide

Published Los Angeles example Price What the figure covers
Angi 200-amp panel, equipment only $295–$413 The panel itself, before installation.
Angi 200-amp panel with installation $1,534–$2,360 Its estimated equipment and installation range for that panel size.
Ceon 100-to-200-amp upgrade, same meter location $2,500–$4,500 A service upgrade with the location retained and no mast rework.
Ceon 100-to-200-amp upgrade with additional service equipment $4,000–$6,500 An upgrade with additional meter-main, mast, or related service work.

Angi’s broader Los Angeles estimate averages $1,818 across panel upgrade work. Its 200-amp figures in the table come from a separate breakdown by panel size. Angi develops its local estimates by adjusting nationwide pricing data for local costs. Ceon publishes ranges for its own job categories. Both are useful planning references. Neither is a Uni Construction quote, and averaging them would hide what each figure includes. Angi’s Los Angeles estimate and methodology · Ceon Electric’s scope and pricing

Identify the work your quote is pricing

A same-capacity replacement addresses the condition of existing equipment. A 100-to-200-amp service upgrade increases the service rating and may involve the utility meter, incoming service, or the route to the house. A new circuit for an EV outlet or appliance is another item to account for. One estimate can cover all three and another can cover only the replacement.

For example, one quote might assume the meter stays on the wall beside the garage door. Another might include moving it around the corner, along with new wiring and patching at the old location. Ask the contractors which location their number assumes and whether the utility has reviewed it. If its decision is pending, request a base price and a separate price for the likely relocation. Our permit and utility guide explains who makes that decision and when it can affect scheduling.

If the project starts with an ADU or EV charger, ask the electrician to review that equipment before choosing a panel size. A short list with the appliances you’re adding is more useful than asking for 200 amps with no project details. See how electrical capacity is evaluated for an LA ADU.

Check the work outside the panel

Read the estimate as a list of work at your address. Ask the estimator to mark these items as included, separately priced, or pending utility review.

  • Panel and breakers. Ask for the service rating, the equipment being replaced, and how existing circuits will be labeled.
  • Meter and incoming service. Find out if the estimate includes the meter assembly or mast, or assumes both can remain in place.
  • Grounding and bonding. Ask which updates the estimate includes and how the contractor will price additional work if the existing setup needs attention.
  • Permit and outage. Ask who files the permit, who pays the agency and utility charges, and who coordinates the power shutoff, inspection, and reconnection.
  • Stucco and paving. Ask how much wall is expected to be opened. Confirm whether the price includes the patch, texture matching, and paint. For an underground service, ask where the trench runs and who restores the driveway, walkway, or landscape above it.
  • Changes and warranty. Ask how you’ll approve a change in writing and which parts of the finished work the warranty covers.

Another useful question is, “What would make this quote change before installation?” The answer should tell you whether the amount can change after the utility reviews the site or after the crew sees a concealed condition. Get that answer before comparing totals.

What to send for a more useful estimate

Share the property ZIP code, the reason for the upgrade, and two photos. One should show the closed panel and meter, and the other should show the wall, the ground below it, and nearby openings. Keep the cover in place. If you have a proposed EV outlet location or an ADU plan, include it with the request.

If the job includes an EV outlet, check the SCE Charge Ready Home eligibility guide before counting any rebate in your budget. Keep the quoted price and a possible rebate separate while you check eligibility.

Get a written scope for your property

See what Uni includes in an electrical panel upgrade, or request a panel upgrade estimate with your ZIP code and photos if you have them.