Finish inspiration for your Uni Construction project. These selections are a starting point, not a fixed-price package. Confirm products, availability and allowances with your project team.

Updated November 6, 2026

A luxurious bathroom in an ADU showcasing premium finishes. The space features a spacious glass-enclosed shower with elegant marble tile, a rain showerhead, and a sleek black frame. The wooden vanity with open shelving below is topped with a sophisticated countertop and gold fixtures, including a modern faucet. Above the vanity, a large rectangular mirror is flanked by stylish wall sconces that provide warm lighting. The bathroom exudes a blend of modern and rustic charm with its high-quality materials and meticulous design details.

Premium Materials & Finishes

Highly-tailored builds with every detail considered.

Uni Construction connects design decisions with drawings and construction planning. Discuss your property, priorities and the agreed scope with our team in Diamond Bar, Los Angeles or Pomona.

Start designing

Catalina Kitchen

Aloe green glossy ceramic wall tile backsplash sample (Marin 2.5 x 10)

Backsplash

Marin 2.5" x 10" Ceramic Wall Tile in Aloe Green - Gloss
Polished quartz countertop sample in Calacatta Milan pattern

Countertop

Revera 63" x 126" - 3 cm Polished Quartz in Calacatta Milan
Jute oak vinyl plank flooring sample

Flooring

Style Selections Jute Oak Vinyl Plank Flooring
White shaker-style cabinet finish sample

Cabinet

White Shaker Style
Gold kitchen cabinet pull handle sample

Cabinet Pull

25 Pack 5inch Kitchen Cabinet Handles Gold
Brass pendant light fixture sample

Pendant Light

1-Light Kitchen Island Brass Gold Pendant Light
White fireclay single-bowl undermount kitchen sink sample

Sink

31.5" Single Bowl Fireclay Undermount Kitchen Sink
Pull-down single-handle kitchen faucet sample

Faucet

Pull-Down Single Handle Kitchen Faucet
White colonial PVC baseboard moulding sample

Baseboard

7/16 in. x 3 1/4 in. x 96 in. Colonial Finished PVC White Baseboard Moulding

Catalina Bathroom

Polished porcelain tile sample for shower wall and shampoo niche (Luxe White)

Shower Wall & Shampoo Box

Magnifica 24" x 48" - 8mm Polished Porcelain Tile in Luxe White
Blue mosaic tile sample for shower pan (Chateau 2 x 2, Ocean)

Shower Pan

Chateau 2" x 2" Floor & Wall Mosaic in Ocean
Honed porcelain tile flooring sample (Luxe White)

Flooring

Magnifica 24" x 48" - 8mm Honed Porcelain Tile in Luxe White
Gold framed rectangular bathroom mirror sample

Mirror

Gold 30x20 Mirror
Single-sink bathroom vanity sample

Vanity

24.4'' Single Bathroom Vanity
Warm brass wall sconce sample for vanity lighting

Vanity Lighting

Warm Brass Sconces
Gold framed bathroom mirror sample (30 x 22)

Mirror

30x22 Gold Mirror
Double-sink bathroom vanity sample

Vanity

54'' Free-standing Double Bathroom Vanity
Shower faucet trim kit sample

Shower System

Eco-Performance Shower Only Faucet Trim Kit, Valve Required
Tub and shower faucet trim kit sample

Shower Tub System

Eco-Performance Tub and Shower Faucet Trim Kit, Valve Required
Alcove soaking bathtub sample (60 x 32)

Tub

Oriel 60" L x 32" W Alcove Soaking Acrylic Bathtub
Frameless sliding bathtub glass door sample

Glass Door

56 - 60 in. x 60 in. Fully Frameless Sliding Bathtub Door
Two-piece elongated toilet sample

Toilet

Elongated Chair Height Floor Mounted Two-Piece Toilet
White colonial PVC baseboard moulding sample

Baseboard

7/16 in. x 3 1/4 in. x 96 in. Colonial Finished PVC White Baseboard Moulding

Laguna Kitchen

Dove-colored 5 x 5 ceramic wall tile backsplash sample

Backsplash

Renzo Dove 5X5 Ceramic Wall Tile
Quartz countertop sample in Calacatta Idillio pattern

Countertop

Calacatta Idillio
Austen oak vinyl plank flooring sample

Flooring

Austen Oak Vinyl Plank Flooring
White shaker-style cabinet finish sample

Cabinet

White Shaker Style
Matte black cabinet pull handle sample

Cabinet Pull

10 Pack Matt Black Cabinet Pulls, 5 Inch
Adjustable modern pendant light sample

Pendant Light

Modern Adjustable Kitchen Hanging Ceiling Light
Farmhouse kitchen sink sample

Sink

Farmhouse Kitchen Sink
Single-handle pull-down kitchen faucet sample

Faucet

Pull Down Sprayer Kitchen Sink Faucet, Single Handle Kitchen Faucet
Colonial primed PVC baseboard moulding sample

Baseboard

9/16 in. x 3 1/4 in. x 96 in. Colonial Primed PVC Baseboard Moulding

Laguna Bathroom

Polished porcelain tile sample for shower wall and shampoo niche (Calacatta Luca, 24 x 48)

Shower Wall & Shampoo Box

Calacatta Luca Porcelain Tile Polished 24x48
Matte penny round mosaic tile sample for shower pan (Bianco)

Shower Pan

Bianco Matte Penny Round Mosaic
White luxury vinyl flooring sample (Andover Whitby White)

Flooring

Andover Whitby White Luxury Vinyl
Round wall mirror sample (22 x 22)

Mirror

Round Wall Mirror 22x22
Single-sink bathroom vanity sample in dove gray (24 inch)

Vanity

Bilston 24 in. W x 19 in. D x 34 in. H Single Sink Bath Vanity in Dove Gray
Brushed nickel wall sconce set for vanity lighting

Vanity Lighting

Nickel Sconces Set of 2
Framed rectangular vanity mirror sample in brushed nickel

Mirror

30 in. W x 36 in. H Framed Rectangular Bathroom Vanity Mirror in Brush Nickel
Single-sink bathroom vanity sample in dove gray (36 inch)

Vanity

Bilston 36 in. W x 19 in. D x 34 in. H Single Sink Bath Vanity in Dove Gray
Brushed nickel shower system sample

Shower System

Brushed-Nickel Combo Shower System
Pressure-balanced tub and shower system sample with hand shower

Shower Tub System

Pressure Balanced Shower System with Shower Head, Hand Shower, Shower Arm, Hose, and Valve Trim
Left-hand steel soaking tub sample (60 x 30)

Tub

60" x 30" Left Hand Steel Soaking Tub
Frameless tub door sample with clear glass

Glass Door

34'' W x 58'' H Frameless Tub Door with Clear Glass
Single-handle bathroom faucet sample

Faucet

Single-Handle Bathroom Faucet
Three-piece bathroom hardware set sample

Hardware Set

3-Piece Bath Hardware Set
Dual-flush round toilet sample

Toilet

Dual Flush Round Toilet in White
Colonial primed PVC baseboard moulding sample

Baseboard

9/16 in. x 3 1/4 in. x 96 in. Colonial Primed PVC Baseboard Moulding

Sonoma Kitchen

Gray arabesque mosaic tile backsplash sample

Backsplash

Influence 10x11 Arabesque Gray
Quartz countertop sample in Calico White

Countertop

Calico White
Monarch Stuart vinyl plank flooring sample

Flooring

Emcore 12 MIL Monarch Stuart Vinyl Plank
White shaker-style cabinet finish sample

Cabinet

White Shaker Style
Chrome cabinet pull handle sample

Cabinet Pull

20-Pack Cabinet Pull, Chrome Handle, 5 Inch
Chrome lantern-style pendant light sample

Pendant Light

4-Light Lantern Pendant Light Chrome Modern Hanging Pendant Light
Single-bowl kitchen sink sample (top-mount or undermount)

Sink

33" x 22" Top- Mount/Undermount Single-Bowl
Pull-down kitchen faucet sample

Faucet

Pull Down Kitchen Faucet
Primed MDF baseboard moulding sample

Baseboard

5/8 in. x 4 in. x 96 in. Primed MDF Baseboard Moulding

Sonoma Bathroom

Hexagon-pattern tile sample for shower wall and shampoo niche

Shower Wall & Shampoo Box

Dove & Hexagon Tile 9x10.5
White 2 x 2 mosaic tile sample for shower pan

Shower Pan

Durban White 2x2
Twilight oak luxury vinyl flooring sample

Flooring

Luxury Vinyl Flooring Glenridge Twilight Oak
Metal-framed rectangular bathroom mirror sample

Mirror

Metal Rectangle Wall Mirror 30x20
Single-sink bathroom vanity sample (24 inch) with ceramic top

Vanity

24'' Single Bathroom Vanity with Ceramic Top
Matte black wall sconce sample for vanity lighting

Vanity Lighting

1-Light Wall Sconce, Matte Black Bathroom Vanity Light
Metal-framed rectangular vanity mirror sample

Mirror

Metal Rectangle Wall Mirror
Single-sink bathroom vanity sample (40 inch)

Vanity

40'' Single Bathroom Vanity
High-pressure shower system sample

Shower System

10” High-Pressure Shower System
Tub and shower faucet set sample with rough-in valve

Shower Tub System

Tub And Shower Faucet With Rough- In Valve
Alcove soaking bathtub sample (60 x 31)

Tub

60" x 31" Alcove Soaking Acrylic Bathtub
Pivot frameless tub door sample with clear glass

Glass Door

35'' 33'' W x 55'' H Pivot Frameless Tub Door with Clear Glass
Single-handle bathroom faucet sample

Faucet

Single Hole Faucet Single-handle Bathroom Faucet
Five-piece bathroom hardware set sample

Hardware Set

5 - Piece Bathroom Hardware Set
Dual-flush round toilet sample

Toilet

Dual Flush Round Toilet in White
Primed MDF baseboard moulding sample

Baseboard

5/8 in. x 4 in. x 96 in. Primed MDF Baseboard Moulding

Design Packages

From classic elegance to elite luxury, discover the ideal ADU design for you.

Classic

Quality ADUs designed for any lifestyle. Package Details
A modern kitchen in an ADU featuring sleek white cabinetry with brass handles, a stainless steel dishwasher, and a polished quartz countertop. The space is well-lit with natural light streaming in through a window above the double sink, highlighting the minimalist design and high-end finishes. A small potted plant adds a touch of greenery to the clean and elegant setting.

Elite

Distinct designs for a luxury living experience. Package Details
A modern kitchen in an ADU featuring elite finishes. The space includes sleek blue cabinetry with gold hardware, complemented by stainless steel appliances. The countertops are a pristine white, paired with a stylish backsplash featuring geometric patterns. A large window above the sink allows natural light to flood the space, highlighting the elegant gold faucet. The kitchen exudes contemporary sophistication with its clean lines, high-quality materials, and thoughtful design details.