Finish inspiration for your Uni Construction project. These selections are a starting point, not a fixed-price package. Confirm products, availability and allowances with your project team.

Updated November 6, 2026

A modern kitchen in an ADU featuring elite finishes. The space includes sleek blue cabinetry with gold hardware, complemented by stainless steel appliances. The countertops are a pristine white, paired with a stylish backsplash featuring geometric patterns. A large window above the sink allows natural light to flood the space, highlighting the elegant gold faucet. The kitchen exudes contemporary sophistication with its clean lines, high-quality materials, and thoughtful design details.

Elite Materials & Finishes

Distinct designs for a luxury living experience.

Uni Construction connects design decisions with drawings and construction planning. Discuss your property, priorities and the agreed scope with our team in Diamond Bar, Los Angeles or Pomona.

Start designing

Mailbu Kitchen

White glossy fish scale mosaic tile backsplash sample

Backsplash

White Glossy Fish Scale Mosaic
Quartz countertop sample in Calacatta Leon pattern

Countertop

Calacatta Leon
Waterproof rigid core flooring sample in Avery Ash finish

Flooring

Waterproof Hybrid Rigid Core Avery Ash
Gray and white cabinet finish sample for main cabinets and island

Main Cabinets & Island

Gray & White Cabinets
Black and silver cabinet pull handle sample (4.8 inch)

Cabinet Pulls

Pack of 10, Black Silver 4.8in
Single pendant light fixture sample

Pendant Light

Light Single Pendant
Single-bowl granite kitchen sink sample (dual-mount)

Sink

33" L Dual Mount Single Bowl Granite Kitchen Sink
Kitchen faucet set with pull-down sprayer and soap dispenser sample

Faucet Set

Pull Down Sprayer Bar Faucet Cold Water Dispensers Soap Dispenser
Colonial PVC composite baseboard moulding sample

Baseboard

9/16 in. x 5.25 in. x 144 in. Colonial PVC Composite Baseboard Moulding

Mailbu Bathroom

Polished Calacatta-look porcelain tile sample for shower wall and shampoo niche (24 x 48)

Shower Wall & Shampoo Box

Kaya Calacatta Venato Polished 24x48
Calacatta-look 2 x 2 mosaic tile sample for shower pan

Shower Pan

Pietra Calacatta 2x2 Mosaic
Vinyl flooring sample in Akadia finish

Flooring

Cyrus 2.0 Akadia Vinyl
Black-framed bathroom mirror sample (24 x 36 and 40 x 30)

Mirror

24x36 Black Mirror & 40X30 Black Mirror
Three-light bathroom vanity light fixture sample

Vanity Light

3 - Light Vanity Light
Single-sink bathroom vanity sample (24 inch)

Vanity

24'' Single Bathroom Vanity
Iron-armed wall sconce set for vanity lighting

Vanity Light

Iron Armed Sconce (Set of 2)
Wall-mounted single-sink bathroom vanity sample (about 35 inches)

Vanity

35.4'' Wall Mounted Single Bathroom Vanity
Tub and shower faucet set sample with rough-in valve

Shower System

Tub Shower Faucet Set Rough in Valve
Freestanding soaking bathtub sample (59 x 32)

Tub

59'' x 32'' Freestanding Soaking Acrylic Bathtub
Floor-mounted tub filler with hand shower sample

Tub Filler

Floor Mounted Tub Spout with Diverter and Handshower
Modern single-hole bathroom faucet sample with drain assembly

Faucet

Modern Single Hole Bathroom Faucet with Drain Assembly
Five-piece bathroom hardware set sample

Hardware Set

5 - Piece Bathroom Hardware Set
One-piece floor-mounted toilet sample

Toilet

Floor Mounted One- Piece Toilet (Seat Included)
Colonial PVC composite baseboard moulding sample

Baseboard

9/16 in. x 5.25 in. x 144 in. Colonial PVC Composite Baseboard Moulding

Napa Kitchen

Sky-blue ceramic picket tile backsplash sample

Backsplash

Renzo Sky Ceramic Pickett
Quartz countertop sample in Calacatta Miraggio Gold pattern

Countertop

Calacatta Miraggio Gold
Luxury vinyl plank flooring sample in Bayhill Blonde finish

Flooring

Andover Bayhill Blonde
Green and white cabinet finish sample for main cabinets and island

Main Cabinets & Island

Green & White Cabinets
Brushed brass cabinet pull handle sample (5 inch)

Cabinet Pulls

20 Pack 5 Inch(128mm) Brushed Brass Kitchen Cabinet Handles
Single pendant light fixture sample

Pendant Light

Light Single Pendant
Single-bowl granite kitchen sink sample (dual-mount)

Sink

33" L Dual Mount Single Bowl Granite Kitchen Sink
Kitchen faucet set with pull-down sprayer and soap dispenser sample

Faucet Set

Pull Down Sprayer Bar Faucet Cold Water Dispensers Soap Dispenser
Craftsman-style MDF baseboard moulding sample

Baseboard

5 1/4 in. x 96 in. Craftsman Primed MDF CoverTrim Baseboard Moulding

Napa Bathroom

Sand Dollar glossy ceramic wall tile sample for shower wall and shampoo niche (2.5 x 10)

Shower Wall & Shampoo Box

Marin 2.5" x 10" Ceramic Wall Tile in Sand Dollar Gloss
White and tan sliced pebble mosaic tile sample for shower pan

Shower Pan

Waterbrook Jumbo Sliced Pebble Mosaic in White & Tan
Vinyl plank flooring sample in Oxford Ojai finish

Flooring

Emcore 20 Mİ L Vinyl Plank Oxford Ojai
LED bathroom mirror sample (24 x 36)

Mirror

LED-Bathroom- Mirror 24x36
Single-sink bathroom vanity sample (24 inch)

Vanity

24'' Single Bathroom Vanity
Arched metal wall mirror sample (24 x 36)

Mirror

Metal Arch Wall Mirror 24x36
Bathroom vanity sconce sample

Vanity Light

Vanity Sconce
Double-sink bathroom vanity sample (60 inch)

Vanity

60'' Free Standing Double Bathroom Vanity
Shower system sample with rough-in valve

Shower System

Shower System with Rough-in Valve
Freestanding soaking bathtub sample (59 x 28)

Tub

59'' x 28'' Freestanding Soaking Acrylic Bathtub
Floor-mounted tub filler with hand shower sample

Tub Filler

1 Handle Floor Mounted Tub Filler with Diverter and Handshower
Single-handle bathroom faucet sample with drain assembly

Faucet

Single-handle Bathroom Faucet with Drain Assembly
Five-piece bathroom hardware set sample

Hardware Set

5 - Piece Bathroom Hardware Set
Smart bidet toilet sample

Toilet

Smart Bidet Toilet
Craftsman-style MDF baseboard moulding sample

Baseboard

5 1/4 in. x 96 in. Craftsman Primed MDF CoverTrim Baseboard Moulding

Montecito Kitchen

Gray glossy arabesque tile backsplash sample

Backsplash

Gray Glossy Arabesque Tile
Quartz countertop sample in Calacatta Clara pattern

Countertop

Calacatta Clara
Glacier porcelain floor tile sample (24 x 48)

Flooring

Glacier Porcelain Tile 24x48
Blue and white cabinet finish sample for main cabinets and island

Main Cabinets & Island

Blue & White Cabinets
Polished chrome cabinet pull handle sample (5 inch)

Cabinet Pulls

10 Pack 5 Inch(128mm) Polished Chrome Kitchen Cabinet Handles
Single pendant light fixture sample

Pendant Light

Light Single Pendant
Single-bowl granite kitchen sink sample (dual-mount)

Sink

33" L Dual Mount Single Bowl Granite Kitchen Sink
Kitchen faucet set with pull-down sprayer and soap dispenser sample

Faucet Set

Pull Down Sprayer Bar Faucet Cold Water Dispensers Soap Dispenser
Colonial primed MDF baseboard moulding sample

Baseboard

1/2 in. x 5 1/4 in. x 96 in. Colonial Primed MDF Baseboard Moulding

Montecito Bathroom

Fan-pattern mosaic tile sample for shower wall and shampoo niche

Shower Wall & Shampoo Box

Impact Fan Mosaic 11x12
White 2 x 2 mosaic tile sample for shower pan

Shower Pan

Impact White 2x2 Mosaic
Vinyl plank flooring sample in Windsor Barstow finish

Flooring

Emcore 20 Mİ L Vinyl Plank Windsor Barstow
Three-light bathroom vanity light fixture sample

Vanity Light

3 - Light Vanity Light
Metal-framed rectangular wall mirror sample (23 x 35)

Mirror

Metal Rectangle Wall Mirror 23x35
Free-standing single-sink bathroom vanity sample (24 inch)

Vanity

24'' Free Standing Single Bathroom Vanity
Single vanity light fixture sample

Vanity Light

Single Vanity Light
Round wall mirror sample (36 inch)

Mirror

36” Round Mirror
Single-sink bathroom vanity sample (48 inch)

Vanity

48'' Single Bathroom Vanity
Circular shower faucet set sample with rough-in valve

Shower System

Circular Shower Faucet with Rough-in Valve
Freestanding soaking bathtub sample (59 x 28)

Tub

59" x 28" Freestanding Soaking Bathtub
Floor-mounted tub filler with hand shower sample

Tub Filler

1 Handle Floor Mounted Tub Filler with Diverter and Handshower
Single-handle bathroom faucet sample with drain assembly

Faucet

Single-handle Bathroom Faucet with Drain Assembly
Four-piece bathroom hardware set sample

Hardware Set

4 - Piece Bathroom Hardware Set
Dual-flush elongated one-piece toilet sample

Toilet

Dual-Flush Elongated One- Piece Toilet with Glazed Surface (Seat Included)
Colonial primed MDF baseboard moulding sample

Baseboard

1/2 in. x 5 1/4 in. x 96 in. Colonial Primed MDF Baseboard Moulding

Design Packages

From classic charm to elite luxury, discover the ideal ADU design for you.

Premium

Highly-tailored builds with every detail considered. Package Details
A luxurious bathroom in an ADU showcasing premium finishes. The space features a spacious glass-enclosed shower with elegant marble tile, a rain showerhead, and a sleek black frame. The wooden vanity with open shelving below is topped with a sophisticated countertop and gold fixtures, including a modern faucet. Above the vanity, a large rectangular mirror is flanked by stylish wall sconces that provide warm lighting. The bathroom exudes a blend of modern and rustic charm with its high-quality materials and meticulous design details.

Classic

Quality ADUs designed for any lifestyle. Package Details
A modern kitchen in an ADU featuring sleek white cabinetry with brass handles, a stainless steel dishwasher, and a polished quartz countertop. The space is well-lit with natural light streaming in through a window above the double sink, highlighting the minimalist design and high-end finishes. A small potted plant adds a touch of greenery to the clean and elegant setting.