Warehouse Tenant Improvement Design in Pico Rivera

Warehouse interior and office enclosure in Pico Rivera
Warehouse floor and glazing in Pico Rivera
Warehouse loading door and office enclosure in Pico Rivera
Enlarged office lighting plan in Pico Rivera
Main floor lighting plan in Pico Rivera

Project overview

Behind the project

Uni Construction prepared the design package for a Pico Rivera warehouse tenant improvement, coordinating architectural, structural, mechanical, electrical, plumbing, and Title 24 documents. The design obtained a permit in 2025, and construction is complete. The electrical sheets show offices and workstations alongside the warehouse floor.

Scope of work

  • Prepare architectural and structural drawings for the warehouse tenant improvement.
  • Coordinate mechanical, electrical, plumbing, and Title 24 documents for permit review.
  • Document the main-floor lighting and power layouts and show the office lighting layout at a larger scale.

What the plans show

The stamped electrical set labels the warehouse area as 26,717.55 sq ft. It also shows workstations, restrooms, a conference room, and a separate open-air break room. The area figure refers to the labeled warehouse space.

Project at a glance

Location
8850 Rex Rd. Pico Rivera, CA 90660
Status
Completed in 2025
Warehouse area shown
26,717.55 sq ft
Design scope
Architecture, engineering and Title 24
Book a free consultation

Project FAQs

How much warehouse space is shown on the Pico Rivera tenant improvement plans?

The stamped electrical set labels 26,717.55 sq ft of warehouse area. The plans also identify a conference room, workstations, restrooms, and a separate open-air break room.

What do the Pico Rivera tenant improvement electrical drawings show?

The drawings show main-floor lighting and power. An enlarged office lighting plan gives a closer view of the fixtures and layout in the office area.

What was included in the Pico Rivera tenant improvement permit package?

The design package included architectural and structural drawings, mechanical, electrical and plumbing drawings, and Title 24 energy documentation.