Existing Garage Conversion to ADU - Los Angeles Lowell

Existing Garage Conversion to ADU - Los Angeles Lowell
Existing garage and property survey in Los Angeles
Proposed Lowell garage conversion site plan and sewer routes
Existing Garage Conversion to ADU - Los Angeles Lowell ,  source gallery image 3
Existing Garage Conversion to ADU - Los Angeles Lowell ,  source gallery image 4

Project overview

Behind the project

Uni Construction designed a garage conversion ADU in Los Angeles. The proposed site drawing shows the ADU within the garage footprint, a planned slab extension, and two possible sewer routes for the contractor to evaluate.

Scope of work

  • Show the existing garage and proposed ADU layout on the site drawing.
  • Document the proposed slab extension and both sewer connection options.

Project at a glance

Client
Homeowner
Location
Los Angeles
Year
2023
Role
Design
Type
ADU
Book a free consultation

Project FAQs

What utility work did the Lowell garage conversion plan address?

The site sheet shows two sewer connection options and calls for the contractor to evaluate them. The drawing does not identify a final selected route.