Pool Re-design in Pasadena

Pool Re-design in Pasadena
Pasadena pool layout drawing
Pasadena pool resurfacing and stepped access plan
Pool Re-design in Pasadena ,  source gallery image 3
Pool Re-design in Pasadena ,  source gallery image 4

Project overview

Behind the project

The Pasadena pool redesign drawings show resurfacing and access improvements. The plan identifies depths from 3 to 5 feet, and the sections show steps and handrails.

Scope of work

  • Specify white plaster resurfacing and smooth glossy tile.
  • Show steps, handrails, drains, skimmers, and lighting.

Project at a glance

Location
Pasadena, CA
Type
Pool redesign
Depth shown
3 to 5 ft
Book a free consultation

Project FAQs

What finish does the Pasadena pool drawing specify?

The drawing specifies white plaster resurfacing and smooth glossy tile. It excludes coping work from the drawn scope.