Engineering Coordination

Bring the technical pieces together.

Keep the architectural proposal and technical disciplines working toward the same project. Uni Construction helps coordinate engineering inputs, required documentation, and review questions so important decisions are resolved across the drawing set.

Modern ADU living room by a top Los Angeles ADU contractor near me, featuring stylish furniture and contemporary decor.

Los Angeles ADU BUILDERS

Our Promise To You

Engineering Coordination for your property

Collage showcasing ADU construction in Los Angeles, featuring modern design and quality craftsmanship. Images include a stylish ADU bathroom, an exterior view of a completed ADU, an aerial view of construction progress, and a furnished interior living space. Highlights the attention to detail and seamless integration typical of Los Angeles ADU projects.
Stress-Free ADU Construction Services in Los Angeles

Engineering Coordination for your property

A building project brings together different kinds of information. The room layout, structure, equipment, site conditions, and approval requirements can influence one another. Coordination makes those relationships visible and gives each issue a responsible party and a place in the documents.

Los Angeles ADU Builders with 20 Years of Expertise

20 years of ADU expertise

Engineering coordination is different from the professional calculations and design assigned to a licensed engineer. Your scope should identify each discipline, the responsible professional, and the documents they provide. That distinction helps prevent missing work or a mistaken assumption that someone else has resolved a technical question.

Affordable ADU Construction Services in Los Angeles

Engineering Coordination for your property

Identify the project type and technical inputs expected for the agreed stage. Record the architectural, structural, energy, site, and systems responsibilities as applicable. Confirm who contracts each specialist and who gathers the information they need.

Full-Service ADU Construction Company

Trust the process, love your ADU

Provide consistent plans, dimensions, site information, and design decisions to the involved parties. Track revisions so an engineer is not designing from an outdated layout. Identify uncertain existing conditions that may require investigation before calculations or details can be completed.

50+ five-star reviews

Top-rated ADU builders providing complete ADU construction services
Uni Construction & ADU Design

Need an ADU? We handle everything.

  • Feasibility

  • Design & Plan

  • Permit

  • Build

ADU Type ADU Type ADU Type

One ADU Contractor. Any build type.

Detached ADU Builders

Detached ADU

A detached ADU is a standalone unit with its own entrance (sometimes called a granny flat or guest house) and is perfect for generating rental income or multigenerational living for a family member.
Attached ADU Builders

Attached ADU

An attached ADU expands your home and boosts your property value by connecting new living space to the main residence. It’s often a great solution for older children or multigenerational living.
Room Addition ADU Builders

Room Additions

Room additions reimagine part of your existing home or add square footage to create a comfortable, functional living area. We help you determine if adapting or expanding your current layout is the simplest and most cost-effective path.
Garage Conversion ADU Builders

Garage Conversion

Converting a garage can turn underused space into a legal, livable ADU. It’s often the fastest way to add housing, but it comes with design and code considerations. We walk you through the feasibility, costs, and upgrades needed.

Start with inspiration

Browse ADU floor plans

Review where disciplines meet: openings and framing, foundations and utilities, equipment and room layouts, or site levels and building entries. Bring questions to the responsible professional. Coordination should lead to clear decisions rather than unsupported substitutions.

Browse floor plans
1192 sq ft 4-bedroom 2-bath ADU floor plan
4 BR | 2 BA
  • 1192 SF
  • 4 Bed
  • 2 Bath
749 sq ft 2-bedroom 2-bath ADU floor plan
2 BR | 2 BA
  • 749 SF
  • 2 Bed
  • 2 Bath
800 sq ft 2-bedroom 2-bath ADU floor plan
2 BR | 2 BA
  • 800 SF
  • 2 Bed
  • 2 Bath
650 sq ft 2-bedroom 1-bath ADU floor plan
2 BR | 1 BA
  • 650 SF
  • 2 Bed
  • 1 Bath
400 sq ft 1-bedroom 1-bath ADU floor plan
1 BR | 1 BA
  • 400 SF
  • 1 Bed
  • 1 Bath

we handle everything

End-to-end ADU project management

As experienced ADU builders, we make the process easy, handling everything from design to construction with clarity and precision. Our team manages each step to deliver high-quality results and complete peace of mind, so you can simply enjoy your new space.

Before we start building your Accessory Dwelling Unit, we do a detailed feasibility study, evaluating zoning regulations, building codes, and potential red tape to show exactly what’s possible for your property. Whether you envision multigenerational living or a backyard cottage, we align design with legal requirements and your lifestyle goals. Our streamlined process establishes a realistic budget, passive income potential, sets clear expectations, and provides full transparency and confidence for your long-term investment from day one.
Learn more

Organize authority comments and technical clarifications by responsible party. Coordinate revised documents and communicate their effect on the rest of the set. During construction, route engineering questions to the appropriate professional and retain written responses.

Forget the complexities of permits and building codes, we handle it all. Our experienced team manages every detail of permit submissions, building department approvals, code compliance, and inspections, ensuring a smooth and swift process that keeps your accessory dwelling unit project on track without delays.
Learn more

Your dedicated Project Manager oversees the entire construction process of your ADU. They handle everything from utility integration to final touches. They ensure the project progresses on time, maintains quality, and communicates clearly at every step. Our general contractors deliver high-quality workmanship, bringing your vision to life seamlessly and without surprises.
Learn more

Review the proposed project, available drawings, records, and scope boundaries. Identify missing information and required specialist involvement. Agree the deliverables for the next stage rather than assuming a full engineering package is already defined.

Coordinate the current plan and relevant site information with the specialists. Confirm key dimensions, equipment, and design choices. Record assumptions and issues requiring further review before they spread across several documents.

Maximize your accessory dwelling unit investment by boosting your property value and earning extra income with our comprehensive rental support services. From market analysis and tenant attraction to compliance guidance, we'll help you confidently navigate renting your ADU, ensuring optimal returns, extra income, and minimal stress.
Learn more

Track conflicts and dependencies, obtain decisions from the responsible professionals, and update affected documents. A structural change may affect the architecture; a systems change may require space or a different route. Close the loop across disciplines.

ADU design & construction in Los Angeles

Serving homeowners across Los Angeles and surrounding cities, with offices in Diamond Bar, Los Angeles, and Pomona.

Exploring ADU Options

Where should I start with my ADU?

Thinking about an ADU

Not sure if an ADU is right for you? Curious about costs of building, zoning details, or whether you need a feasibility study? We can walk you through the basics and give you a clear picture of your options and the basics of ADUs.
Start here to learn the basics

I’m weighing my options

Done some research but still comparing paths? Should you hire separate designers and ADU builders, general contractors, or one trusted design-build partner? Learn why the design-build approach cuts through red tape, saves time, and delivers better value.
The design-build difference

I’m ready to build my ADU

If you’re ready to move forward, we’ll make the process seamless. Our team will review your property, handle permits, and create a tailored plan to design and build your ADU, so you can focus on enjoying your new space.
Get my custom ADU proposal

ADU Regulations

The easy way to build an ADU is here

Coordinate submission inputs, plan-check responses, or construction clarifications as included. Keep issued sets and revisions identifiable. Confirm the scope of any further services required when the project advances or changes.

smaller adu setbacks

Smaller ADU setbacks

Allowing you to do more with your property.
reduce adu costs

Reduced ADU costs

Carrying out cost-effective construction without compromise.
expideted

Expedited ADU approvals

Speeding up the permit approval timeline for ADUs.
list-icon-2

ADU parking requirements

Alleviating the parking space requirement for ADUs.
list-icon-4

Additional ADUs

Supporting both ADUs and Junior ADUs on a single property.
list-icon-6

Bigger ADU builds

Greater build sizes Making even larger ADUs possible.

Our reviews

Yelp review

“He also provided realistic timelines which he maintained. Above all, he knows his craft.”

Leo O.

Review excerpt · Yelp
View on Yelp
Yelp review

“Their expertise, competitive pricing, and impressively fast response time made the entire experience smooth and stress-free.”

I-ting W.

Review excerpt · Yelp
View on Yelp
Yelp review

“Min is very responsive and communicates well with our team.”

Brandon L.

Review excerpt · Yelp
View on Yelp
Yelp review

“Min always responds to my requests quickly, and helps me revise the plan many times until the ADU permit application is approved.”

Doris C.

Review excerpt · Yelp
View on Yelp
Google review

“They did full design that helped me get city permit approval.”

Sonia Hobbs

Review excerpt · Google
View on Google
Google review

“Uni construction came in with better cost but more so solved many problems that architect had created!”

Forest Jones

Review excerpt · Google
View on Google
Google review

“They did a great job on my plans for a detached ADU and getting them fully approved by the city.”

Josue Moreno

Review excerpt · Google
View on Google

ADU INSIGHTS

ADU contractors you can count on

Aerial view of a Los Angeles neighborhood with a detached backyard unit ,  What Is ADU Construction illustration for Uni Construction blog.

What Is ADU Construction?

ADU construction involves planning, permitting, and building a self-contained living space on a residential property , adding value, flexibility, and income potential without buying new land.

Learn More
Aerial view of ADU site preparation backyard – When Should You Build an ADU

Engineering Coordination for your property

ADU construction involves planning, permitting, and building a self-contained living space on a residential property , adding value, flexibility, and income potential without buying new land. In California, ADUs now make up about one in six new homes, reflecting their growing role in solving the state’s housing shortage.

Learn More
Aerial view of professional ADU construction showing framed structure and residential site , Why Choose a Professional ADU Builder

Engineering Coordination for your property

The answer follows the proposed work, authority requirements, and actual site conditions. Ask for a responsibility schedule that identifies required inputs and exclusions instead of assuming every project needs the same consultants.

Learn More
Modern Los Angeles home representing where ADUs can be built on residential lots.

Engineering Coordination for your property

The appropriate professional should make and document decisions within their discipline. Coordination helps move the question to that person and communicate the outcome; it should not obscure professional responsibility.

Learn More
Construction workers framing a detached ADU structure CA during the early building process

Engineering Coordination for your property

Separate measured or verified information from assumptions and records that may not reflect current conditions. Agree what investigation is needed and when. Clear inputs reduce avoidable redesign later in the process.

Learn More

Calculate your
ADU ROI

Our calculator offers a clear look at what your return on investment will be for your ADU project.

$ Maximum value ranges from 1$ to 1000000$
$ Maximum value ranges from 1$ to 1000000$
Total Return On Your ADU Investment

1,739%

Compare to other investments:

Real Estate

Avg. 6-8%

Stocks

Avg. 5-7%

Savings Account

Avg. 2-4%

Financing your ADU
made simple

We proudly extend flexible financing options to the homeowners we serve, breaking down the full cost of an ADU into manageable payment schedules. Here's how our process works.

1

Easily apply online

Easily apply with our hassle-free online process.

2

Pre-qualify

See if you pre-qualify for an even quicker turnaround.

3

Fast review process

Sit back and relax while we handle the review process.

4

Approval

Receive a notification the moment you’re approved.

Your top ADU questions answered

Answers to your most common ADU building questions.

No. Structural engineering includes professional structural analysis, design, and documentation. Coordination organizes how that work connects with other disciplines. The agreement should identify the responsible structural professional and their specific scope.

Share the current documents, file formats, permissions, and each party’s scope. We can discuss the coordination needed and agree who makes design decisions, updates drawings, and communicates with the authority.

Only when that service is expressly included. Design coordination, permit support, construction administration, and management of the build are different responsibilities. Define the stage and deliverables in the written proposal.