Detached ADU Design & Construction

A backyard home with room to live.

A detached ADU gives a household its own building and a different relationship to the main home. Plan the building, entrance, outdoor space, and utility connections as one project, with a layout that fits the property rather than a footprint placed wherever it fits.

Modern ADU living room by a top Los Angeles ADU contractor near me, featuring stylish furniture and contemporary decor.

Los Angeles ADU BUILDERS

Our Promise To You

Detached ADU Design & Construction for your property

Collage showcasing ADU construction in Los Angeles, featuring modern design and quality craftsmanship. Images include a stylish ADU bathroom, an exterior view of a completed ADU, an aerial view of construction progress, and a furnished interior living space. Highlights the attention to detail and seamless integration typical of Los Angeles ADU projects.
Stress-Free ADU Construction Services in Los Angeles

Detached ADU Design & Construction for your property

A separate unit can provide privacy for family or a long-term tenant, but its success depends on the way both homes share the property. Consider arrival, windows, paths, outdoor activities, and maintenance. The remaining yard should still work after the ADU is built.

Los Angeles ADU Builders with 20 Years of Expertise

20 years of ADU expertise

Early concepts should show more than room labels. Locate the unit, review access and grade, and identify potential connection routes. The drawing package can then develop a consistent relationship between architectural decisions, structure, systems, and the requirements confirmed for the parcel.

Affordable ADU Construction Services in Los Angeles

Detached ADU Design & Construction for your property

Compare positions that preserve practical access, daylight, and useful outdoor areas. Review known boundaries, restrictions, existing trees and structures, and any specialist information needed. Establish which assumptions require a survey or further site review.

Full-Service ADU Construction Company

Trust the process, love your ADU

Arrange the kitchen, living area, bedrooms, bathroom, laundry, and storage around the intended household. Test furniture and circulation. Provide a deliberate entrance so residents and visitors can understand how to reach the home without unnecessarily crossing private areas.

50+ five-star reviews

Top-rated ADU builders providing complete ADU construction services
Uni Construction & ADU Design

Need an ADU? We handle everything.

  • Feasibility

  • Design & Plan

  • Permit

  • Build

ADU Type ADU Type ADU Type

One ADU Contractor. Any build type.

Detached ADU Builders

Detached ADU

A detached ADU is a standalone unit with its own entrance (sometimes called a granny flat or guest house) and is perfect for generating rental income or multigenerational living for a family member.
Attached ADU Builders

Attached ADU

An attached ADU expands your home and boosts your property value by connecting new living space to the main residence. It’s often a great solution for older children or multigenerational living.
Room Addition ADU Builders

Room Additions

Room additions reimagine part of your existing home or add square footage to create a comfortable, functional living area. We help you determine if adapting or expanding your current layout is the simplest and most cost-effective path.
Garage Conversion ADU Builders

Garage Conversion

Converting a garage can turn underused space into a legal, livable ADU. It’s often the fastest way to add housing, but it comes with design and code considerations. We walk you through the feasibility, costs, and upgrades needed.

Start with inspiration

Browse ADU floor plans

Coordinate water, sewer, electrical service, and proposed equipment with the site plan. Discuss capacity and provider requirements. A longer or more difficult route can affect site work even when the floor plan itself remains unchanged.

Browse floor plans
1192 sq ft 4-bedroom 2-bath ADU floor plan
4 BR | 2 BA
  • 1192 SF
  • 4 Bed
  • 2 Bath
749 sq ft 2-bedroom 2-bath ADU floor plan
2 BR | 2 BA
  • 749 SF
  • 2 Bed
  • 2 Bath
800 sq ft 2-bedroom 2-bath ADU floor plan
2 BR | 2 BA
  • 800 SF
  • 2 Bed
  • 2 Bath
650 sq ft 2-bedroom 1-bath ADU floor plan
2 BR | 1 BA
  • 650 SF
  • 2 Bed
  • 1 Bath
400 sq ft 1-bedroom 1-bath ADU floor plan
1 BR | 1 BA
  • 400 SF
  • 1 Bed
  • 1 Bath

we handle everything

End-to-end ADU project management

As experienced ADU builders, we make the process easy, handling everything from design to construction with clarity and precision. Our team manages each step to deliver high-quality results and complete peace of mind, so you can simply enjoy your new space.

Before we start building your Accessory Dwelling Unit, we do a detailed feasibility study, evaluating zoning regulations, building codes, and potential red tape to show exactly what’s possible for your property. Whether you envision multigenerational living or a backyard cottage, we align design with legal requirements and your lifestyle goals. Our streamlined process establishes a realistic budget, passive income potential, sets clear expectations, and provides full transparency and confidence for your long-term investment from day one.
Learn more

Define demolition, foundations, building work, drainage, paths, and landscape reinstatement in the scope. Coordinate inspections and final approvals. Ask what is included outside the building so the new home is connected to a usable, finished property.

Forget the complexities of permits and building codes, we handle it all. Our experienced team manages every detail of permit submissions, building department approvals, code compliance, and inspections, ensuring a smooth and swift process that keeps your accessory dwelling unit project on track without delays.
Learn more

Your dedicated Project Manager oversees the entire construction process of your ADU. They handle everything from utility integration to final touches. They ensure the project progresses on time, maintains quality, and communicates clearly at every step. Our general contractors deliver high-quality workmanship, bringing your vision to life seamlessly and without surprises.
Learn more

Collect existing records and identify access, structures, site levels, and known constraints. Confirm which authority will review the unit. Decide what additional information is needed before selecting a building position.

Compare the unit orientation, entrance, room layout, and outdoor separation. Evaluate the effect on the existing household. A concept should support a decision about the whole site, not only the appearance of the new home.

Maximize your accessory dwelling unit investment by boosting your property value and earning extra income with our comprehensive rental support services. From market analysis and tenant attraction to compliance guidance, we'll help you confidently navigate renting your ADU, ensuring optimal returns, extra income, and minimal stress.
Learn more

Refine openings, roof form, materials, equipment locations, and required technical documentation. Keep structural and systems information aligned with the selected plan and record changes so the submission describes one consistent project.

ADU design & construction in Los Angeles

Serving homeowners across Los Angeles and surrounding cities, with offices in Diamond Bar, Los Angeles, and Pomona.

Exploring ADU Options

Where should I start with my ADU?

Thinking about an ADU

Not sure if an ADU is right for you? Curious about costs of building, zoning details, or whether you need a feasibility study? We can walk you through the basics and give you a clear picture of your options and the basics of ADUs.
Start here to learn the basics

I’m weighing my options

Done some research but still comparing paths? Should you hire separate designers and ADU builders, general contractors, or one trusted design-build partner? Learn why the design-build approach cuts through red tape, saves time, and delivers better value.
The design-build difference

I’m ready to build my ADU

If you’re ready to move forward, we’ll make the process seamless. Our team will review your property, handle permits, and create a tailored plan to design and build your ADU, so you can focus on enjoying your new space.
Get my custom ADU proposal

ADU Regulations

The easy way to build an ADU is here

Plan delivery access, work zones, service interruptions, and inspection stages. Confirm selections and responsibilities before starting. At completion, review remaining site work, closeout information, and the approvals required for the intended use.

smaller adu setbacks

Smaller ADU setbacks

Allowing you to do more with your property.
reduce adu costs

Reduced ADU costs

Carrying out cost-effective construction without compromise.
expideted

Expedited ADU approvals

Speeding up the permit approval timeline for ADUs.
list-icon-2

ADU parking requirements

Alleviating the parking space requirement for ADUs.
list-icon-4

Additional ADUs

Supporting both ADUs and Junior ADUs on a single property.
list-icon-6

Bigger ADU builds

Greater build sizes Making even larger ADUs possible.

Our reviews

Yelp review

“He also provided realistic timelines which he maintained. Above all, he knows his craft.”

Leo O.

Review excerpt · Yelp
View on Yelp
Yelp review

“Their expertise, competitive pricing, and impressively fast response time made the entire experience smooth and stress-free.”

I-ting W.

Review excerpt · Yelp
View on Yelp
Yelp review

“Min is very responsive and communicates well with our team.”

Brandon L.

Review excerpt · Yelp
View on Yelp
Yelp review

“Min always responds to my requests quickly, and helps me revise the plan many times until the ADU permit application is approved.”

Doris C.

Review excerpt · Yelp
View on Yelp
Google review

“They did full design that helped me get city permit approval.”

Sonia Hobbs

Review excerpt · Google
View on Google
Google review

“Uni construction came in with better cost but more so solved many problems that architect had created!”

Forest Jones

Review excerpt · Google
View on Google
Google review

“They did a great job on my plans for a detached ADU and getting them fully approved by the city.”

Josue Moreno

Review excerpt · Google
View on Google

ADU INSIGHTS

ADU contractors you can count on

Aerial view of a Los Angeles neighborhood with a detached backyard unit ,  What Is ADU Construction illustration for Uni Construction blog.

What Is ADU Construction?

ADU construction involves planning, permitting, and building a self-contained living space on a residential property , adding value, flexibility, and income potential without buying new land.

Learn More
Aerial view of ADU site preparation backyard – When Should You Build an ADU

Detached ADU Design & Construction for your property

ADU construction involves planning, permitting, and building a self-contained living space on a residential property , adding value, flexibility, and income potential without buying new land. In California, ADUs now make up about one in six new homes, reflecting their growing role in solving the state’s housing shortage.

Learn More
Aerial view of professional ADU construction showing framed structure and residential site , Why Choose a Professional ADU Builder

Detached ADU Design & Construction for your property

Balance room count with living space, storage, bathrooms, and cost. Compare realistic furniture arrangements rather than squeezing extra rooms into a fixed footprint. The right size follows the household brief and the constraints of the property.

Learn More
Modern Los Angeles home representing where ADUs can be built on residential lots.

Detached ADU Design & Construction for your property

Think about views from both homes, window locations, paths, and outdoor seating. A separate building does not create privacy automatically. The relationship between openings and shared areas deserves the same attention as the room arrangement.

Learn More
Construction workers framing a detached ADU structure CA during the early building process

Detached ADU Design & Construction for your property

Consider durability, cleaning, replacement parts, and energy use when selecting materials and equipment. Confirm the level of finish in the proposal so visual inspiration and priced construction describe the same scope.

Learn More

Calculate your
ADU ROI

Our calculator offers a clear look at what your return on investment will be for your ADU project.

$ Maximum value ranges from 1$ to 1000000$
$ Maximum value ranges from 1$ to 1000000$
Total Return On Your ADU Investment

1,739%

Compare to other investments:

Real Estate

Avg. 6-8%

Stocks

Avg. 5-7%

Savings Account

Avg. 2-4%

Financing your ADU
made simple

We proudly extend flexible financing options to the homeowners we serve, breaking down the full cost of an ADU into manageable payment schedules. Here's how our process works.

1

Easily apply online

Easily apply with our hassle-free online process.

2

Pre-qualify

See if you pre-qualify for an even quicker turnaround.

3

Fast review process

Sit back and relax while we handle the review process.

4

Approval

Receive a notification the moment you’re approved.

Your top ADU questions answered

Answers to your most common ADU building questions.

No. Compare site area, the condition of any existing garage, access, utility work, household needs, and the uses you would lose. A detached unit offers independence but also requires new building and site work that a concept-only comparison may overlook.

That arrangement can be explored, subject to the parcel and applicable requirements. Construction planning should address the route from the street, deliveries, occupants, and any service interruptions. Confirm site access before assuming the build can proceed without affecting daily routines.

The written scope should say whether paths, drainage, fencing, planting, and restoration of disturbed areas are included. A detached ADU project can leave substantial work outside the building if those items are not discussed early.