Beverly Eye Associates

Beverly Eye Associates reception at 450 North Bedford Drive
Historical Suite 110 floor plan at the Beverly Hills medical building

Project overview

Behind the project

This project involved the design of an expansion for Dr. Peter J. Cornell’s ophthalmology practice at Beverly Hills Eye Associates, located at 450 Bedford Dr. within an existing medical office building. Uni Construction managed and oversaw the complete design and construction performed by applicable affiliates.

Scope of work

  • Coordinate tenant needs and existing building systems during design.
  • Manage design firms through permit approval and support contractor procurement.
  • Oversee construction performed by the project affiliates.

Project at a glance

Client
Beverly Hills Eye Associates
Location
Beverly Hills, CA
Year
2014
Role
Design-Build
Type
TI
Represented
Min Kang
Book a free consultation

Project FAQs

What does the historical Beverly Eye suite plan show?

The Suite 110 plan labels a reception area, administrative space, a doctor’s office, and several numbered rooms. It documents the historical layout.