749 SQFT, 2 BED, 2 BATH
2BR/2BA 31×30 L-Shape
749 SQFT, 2 BED, 2 BATH
Plan status: Local Approval Required
2 Bedrooms
2 Baths
See floor plan
749 SQFT
31′ × 30′
1 Story
Customize any design to suit your individual needs.
Adjustment options available for your perfect ADU.
In-house designers will adapt any layout to your exact requirements.
Compare this 749 sq ft 2-bedroom ADU with 2 bathrooms and explore the floor plan alongside its exterior views.
Plan description
Compact L-Shaped ADU Floor Plan
This L-shaped ADU floor plan is a compact 750 sq ft design with 2 bedrooms and 2 bathrooms, perfect for maximizing privacy and space. With dual suites, each bedroom comes with its own walk-in closet, making it an ideal choice for roommates or guests. One of the bathrooms is also accessible from the hallway, adding convenience for visitors. The L-shaped ADU plan includes a full kitchen with standard appliances, providing ample cooking space and functionality. It also features a laundry area with full-size appliances, ensuring that the compact size of this ADU doesn’t sacrifice convenience. For those who love outdoor living, the optional patio space off the great room creates a cozy extension into the courtyard. This unique feature enhances the overall design of the L-shaped ADU, making it perfect for entertaining or relaxing outside.
Read less Read more
Why Homeowners Consider L-Shaped ADU Floor Plans
L-shaped ADU floor plans are gaining popularity for their unique ability to create a highly functional, yet cozy living space. The defining characteristic of the “L” layout is its ability to carve out a private outdoor area, making these designs ideal for smaller lots where space is at a premium. By naturally wrapping around a courtyard or patio, this design maximizes the available land, offering homeowners a perfect blend of indoor and outdoor living.
For those who want more privacy between living areas, L-shaped ADUs are ideal. Bedrooms can be placed on opposite ends of the “L,” making them great for dual-occupancy arrangements, such as roommates or guests. Additionally, this design works well for properties with unusual layouts, giving more flexibility when siting the ADU on a corner or narrow lot. L-shaped ADUs also offer enhanced natural light and ventilation since the shape allows for more exterior wall space and windows.
Whether you’re looking to create a rental, a guest suite, or a home office, the L-shaped ADU offers practical solutions for space utilization while adding aesthetic appeal with its unique shape and integrated outdoor spaces.
Advantages of L-Shaped House Plans
L-shaped house designs are not just for accessory dwelling units but are also widely used in full-sized homes due to their modern aesthetic and practical benefits. The “L” configuration offers a seamless connection between indoor and outdoor spaces, creating an easy flow that is particularly suited for homes in warm climates or areas where outdoor living is a priority.
Increased Natural Light
The “L” shape allows for greater flexibility in window placement, leading to more natural light in key living spaces. This design is particularly beneficial for homes in urban areas or on smaller lots where neighboring properties might block light from entering on one side. With an L-shaped home, more exterior walls are exposed to sunlight, providing brighter living areas throughout the day.
Enhanced Privacy
The L-shape allows for enhanced privacy by separating different parts of the home. For example, in a two-bedroom L-shaped ADU, bedrooms can be located at opposite ends, making it ideal for families, roommates, or hosting guests. In larger L-shaped house plans, this design is perfect for creating a master suite retreat or separating living quarters from entertainment areas.
Outdoor Living Integration
Incorporating outdoor living is another major benefit. The courtyard formed by the “L” shape is perfect for a private garden, patio, or entertainment space, adding to the overall livability and functionality of the ADU. A trellis over the patio is one option to explore for outdoor living, subject to the site conditions and applicable design requirements. Read more about exterior ADU options.
Architectural Flexibility
Beyond practical benefits, L-shaped homes are visually striking. The distinctive layout provides a more modern and dynamic structure compared to traditional rectangular homes, offering plenty of opportunities for unique architectural elements, such as varying roof heights or glass walls that open up to the courtyard. This flexibility allows homeowners to customize the home to fit their aesthetic preferences and functional needs. Read more about ADU architects.
Site-specific approval and drawing review
Local Approval Required. This 749 sq ft 2-bedroom ADU is a starting layout for a property-specific design. Its catalog listing does not establish approval for your address or inclusion in a city plan program.
Review the measured site, the proposed building position and the documents needed for your project with the design team. Any changes to the layout, openings or dimensions need to be coordinated in the drawing set before submission.
Discuss customization and the agreed design scope with Uni Construction. Confirm the actual review process with the responsible authority.
Original reference drawings
The original reference drawing set is separate from the property-specific Uni Construction documents. Its source-program status does not establish local approval for this catalog layout.
Compare another floor area
A 900 sq ft alternative is mentioned in the source layout notes. Compare its recorded dimensions and room arrangement with this 749 sq ft drawing before choosing between them.
The ROI of your 749 sq ft ADU in real time
A 749 sq ft 2-bedroom ADU can serve different goals: a separate home for family, space for guests or a potential long-term rental. This layout lists 749 sq ft, 2 bedrooms, 2 bathrooms and 1 story. Before comparing rental income, consider who would use the home and how the entrance, outdoor space and access would work alongside your main residence. Use the calculator to compare estimated annual rent with your project price. Adjust both figures to explore your own scenario.
Total Return On Your ADU Investment
Compare to other investments:
Real Estate
Avg. 6–8%
Stocks
Avg. 5–7%
Savings Account
Avg. 2–4%
Illustrative comparison ranges. Calculator shows gross annual rent divided by project price, before expenses, financing and taxes. Figures are editable examples, not a quote or guaranteed return.

A tip from our CEO
For this 749 sq ft 2-bedroom ADU, start by deciding which spaces need privacy and which should connect. Mark the route from the entrance to the living area, then check how it passes the bedrooms and bathrooms. Consider window placement, storage and everyday furniture at the same time so changes to one room do not compromise the rest of the home.
Look at the possibilities
Is this 749 sq ft 2-bedroom ADU right for you?
Compare the layout with how you intend to use the home. These are planning questions, not promises of approval or rental returns.
The room arrangement
Compare the recorded 749 sq ft area and 2 bedrooms with the room relationships shown in the drawing. Use furniture, storage and access needs to assess whether this layout suits your household.
The size of the home
Consider whether 749 sq ft suits the occupants, furniture and storage you have in mind.
Bathrooms and access
Review how the 2 bathrooms are reached from the living and sleeping spaces.
Outdoor relationships
Compare the front and rear views of this 749 sq ft 2-bedroom ADU with the access, privacy and outdoor space on your own property.
Designed around your property
Adapt the plan to your property
Local Approval Required
The status for this 749 sq ft 2-bedroom ADU is Local Approval Required. The layout does not establish approval for your address.Start with the site
Use the 749 sq ft layout and the floor-plan drawing to discuss property boundaries, access, utility routes and orientation.Coordinate your changes
Review changes to rooms, openings or finishes together with the drawings and technical coordination they require.Plan smart. Build right.
What to check before planning this 749 sq ft ADU
Use the 2-bedroom plan as a reference while gathering the information for your property.
Your address and jurisdiction
Confirm which local authority reviews the property and which requirements need checking for the proposed design.The proposed footprint
The drawing is listed as see floor plan. Its recorded dimensions are 31′ × 30′. Review the drawing against a measured site plan.Entrances and connections
Discuss access, privacy and the route for water, drainage and electrical connections.The approval status
Local Approval Required. Complete the property-specific review and submission process before treating a plan as ready to build.Room for your next chapter
Plan your 749 sq ft around everyday life

Family living
Consider how the 2-bedroom arrangement could support the family members who would use the home.
Independent space
Review whether the 749 sq ft layout provides the living space and privacy your household needs.
Potential rental use
Discuss the intended use and applicable requirements before making assumptions about rental eligibility or income.
Long-term flexibility
Consider furniture, circulation and changing household needs when discussing revisions to the drawing.
Your path to a 749 sq ft 2-bedroom ADU
Move from a reference layout to a property-specific proposal with the relevant design and approval steps.
1
Discuss your property
Bring your address and your goals for this 749 sq ft 2-bedroom ADU to a 30-minute consultation.
2
Review the layout
Discuss the site information and the changes to investigate in the floor plan.
3
Develop the drawings
Coordinate the design documents and the technical information needed for the proposed project.
4
Review and plan the next step
Work through local review and the project scope before planning construction.
Frequently asked questions about this 749 sq ft 2-bedroom ADU
Explore the layout, customization, budgeting and property considerations for this 749 sq ft plan. Start with the drawing, then check how the design would work at your address.
How many bedrooms and bathrooms does this 749 sq ft plan have?
This layout lists 749 sq ft, 2 bedrooms, 2 bathrooms and 1 story. Use the drawing to compare the relationship between the sleeping space, bathroom, kitchen and living area.
What are the dimensions of this 749 sq ft 2-bedroom ADU?
The recorded overall dimensions are 31′ × 30′, and the listed area is 749 sq ft. Overall dimensions and floor area describe different things, especially where a building has an irregular outline or more than one level. Use the dimensioned drawing when checking the footprint, and confirm dimensions in the final coordinated drawings before construction.
Is this a pre-approved ADU plan?
The status of this 749 sq ft 2-bedroom ADU is Local Approval Required. The drawing is a starting point for a property-specific design, not an approval for your address. Site placement, utilities, access and the final construction documents still need to be reviewed. An approval held by a reference plan elsewhere does not establish approval for your property.
Can I customize this 749 sq ft floor plan?
Yes, changes can be explored during design. Start with the rooms and features you want to retain, then identify what needs to change. Moving walls, changing windows or rearranging plumbing can affect several parts of the drawing, so review those changes together rather than treating each as an isolated edit.
What should I bring to a 30-minute consultation?
Bring your property address, available site drawings, photos of the existing home and a short list of goals. Tell us why this 749 sq ft 2-bedroom ADU appeals to you and what you would change. Information about access, existing structures and utility locations helps make the conversation more specific, even if you do not yet have a complete set of plans.
How much would it cost to build this 749 sq ft 2-bedroom ADU?
The 749 sq ft area alone is not enough to price construction. Access, ground conditions, utility work, the selected building system and finishes all affect the scope. Request a property-specific estimate that separates design, engineering, permit fees, site preparation and construction. The images on this page do not establish a construction price or a guaranteed total budget.
How long would design, approval and construction take?
The schedule for this 749 sq ft 2-bedroom ADU depends on the property, the extent of customization and the required reviews. Separate the schedule into design, engineering coordination, permit review, site preparation and building work. Ask which decisions or records are needed before each stage begins. A schedule for another property is not a reliable completion promise for yours.
Can this layout work for a family member or multigenerational living?
This layout lists 749 sq ft, 2 bedrooms, 2 bathrooms and 1 story. Discuss the intended resident’s daily routine before choosing the final arrangement. Check privacy, access to the bathroom, kitchen use and the relationship to the main home. If step-free access or other mobility needs matter, raise them at the start so the entrance, clearances and fixtures can be considered as part of the design.
Can I use part of the home as an office or flex space?
With 2 bedrooms, this plan gives you rooms to compare for sleeping, work or flexible use. Decide how many bedrooms you need to retain, then check furniture, storage and circulation before assigning an office. The 749 sq ft drawing should be reviewed around the actual activities you need the home to support.
Does this plan automatically fit my backyard?
No. The recorded dimensions of 31′ × 30′ are only one part of a fit check. The design team also needs to understand the property boundaries, existing buildings, required access, utilities and applicable development standards. A clear area in a photograph does not establish a buildable envelope. Review the building placement on a measured site plan.
Could this be used for a garage conversion?
This page presents a 749 sq ft floor-plan layout, not a confirmation that an existing garage can accommodate it. A conversion starts with the actual garage dimensions and condition. Structure, floor levels, openings and services need assessment before deciding what can stay. Compare the existing building with this drawing before assuming that the same footprint or room arrangement will transfer.
How should I plan the kitchen, bathroom and laundry?
Review appliance sizes, door swings, storage and the space needed to use fixtures comfortably. Check where water, drainage, electrical and ventilation services would run. Keeping a preferred room arrangement is useful only if the coordinated design can support the way those spaces will be used.
Can the entrance or windows be repositioned?
Entrance and window changes can be explored when adapting this 749 sq ft 2-bedroom ADU. Consider privacy from the main home, the approach from the street, daylight and furniture placement. Moving an opening can also affect the wall and the surrounding design. Review it with the site layout and coordinated drawings rather than relying on the preview image alone.
Will this plan require additional parking?
Parking needs to be checked for the property and proposed ADU type. This 749 sq ft drawing does not establish a parking requirement or an exemption for your address. Include existing parking, driveways and the proposed access route in the site review. Confirm the applicable requirements with the reviewing authority before fixing the building placement.
How can I compare this layout with other ADU floor plans?
Start with the actual 749 sq ft area, the bedroom and bathroom count, and the recorded dimensions of 31′ × 30′. Then compare the kitchen, storage, privacy and access to each room. A larger advertised area does not by itself mean a better fit. Use the floor plan alongside the exterior views, and shortlist the layouts that support your intended use and property.
How does this layout compare with l shaped adu?
This plan has 749 sq ft, 2 bedrooms and 2 bathrooms.