749 SQFT, 2 BED, 2 BATH
ADU Over Garage 2BR/2BA | Two Bedroom Carriage House
749 SQFT, 2 BED, 2 BATH
Plan status: Local Approval Required
2 Bedrooms
2 Baths
Over garage
749 SQFT
See floor plan
2 Stories
Customize any design to suit your individual needs.
Adjustment options available for your perfect ADU.
In-house designers will adapt any layout to your exact requirements.
Compare this 749 sq ft 2-bedroom ADU with 2 bathrooms and explore the floor plan alongside its exterior views.
Plan description
2 Bedroom Carriage House Plans: Maximize Your Property with Versatile Living Space
Our carriage house plans with 2 bedrooms provide a smart solution for maximizing your property’s potential. With a 2 car garage and ADU above, this two-story design combines practical parking spaces with comfortable living quarters. Ideal for generating rental income, housing family members, or offering guest accommodations, this layout is efficient, stylish, and flexible.
Read less Read more
What is a Carriage House?
A carriage house is a detached, two-story structure traditionally used to house carriages and horses on the ground floor, with living quarters above. In modern times, carriage houses have been reimagined to include garages with an ADU upstairs, blending practicality with additional living space. Read more about carriage houses and ADUs over garages.
Practical and Efficient 2 Bedroom Carriage House Design
These 2 bedroom 2 bath carriage house plans offer 750 sq ft offers living space above a 2 car garage. The square layout makes efficient use of every inch, and an optional deck off the great room extends the living space and offers an ideal spot for relaxation or enjoying the view.
Key Layout Features:
-
Two Bedrooms, Two Bathrooms: Both bedrooms are comfortably sized, each with access to a bathroom.
-
Open Living Area: The living room, dining, and kitchen areas flow together in an open layout, creating a bright and spacious feel.
-
Optional Deck: Add a deck for more outdoor living space, extending the great room and providing a perfect area for enjoying the outdoors.
-
Flexible Garage Space: The 2 car garage can be used for parking, storage, or even converted into a workshop or home gym, making this plan adaptable to your lifestyle.
-
Customization Options: Tailor the layout by adding storage, expanding the deck, or upgrading interior finishes to match your personal style.
-
Maximized Property Use: The vertical design makes great use of smaller lots or properties where space is limited.
Benefits of Building a 2 Bedroom Carriage House
A 2 bedroom carriage house offers numerous benefits, from adding value to your property to providing extra living space. This compact design is perfect for various use cases.
Key Benefits:
-
Increased Property Value: A carriage house adds both living space and parking, increasing your property’s resale value.
-
Rental Income Potential: The ADU can be rented out for additional income, making it a smart investment.
-
Efficient Space Usage: By building above the garage, you make the most of your property’s footprint. No need to choose between a covered parking and an ADU!
-
Flexible Living Arrangements: The two-bedroom layout is ideal for small families, roommates, or guests, offering privacy and shared living space.
Garage Conversion vs. New Construction: Which is Right for You?
When adding a carriage house, you may consider converting an existing garage or building a new structure. Each option has its advantages, so it’s essential to weigh the costs and benefits carefully.
Garage Conversion Considerations:
-
Lower Costs: Converting an existing garage typically costs less than building from scratch. However, this may not be the case if the garage is in poor condition.
-
Faster Timeline: Renovating an existing space can be quicker, helping you add living quarters more efficiently.
-
Potential Design Limits: An existing garage may have limitations, so consider if it offers the flexibility you need for your new ADU.
Benefits of New Construction:
-
Complete Design Control: Building new allows you to fully customize your carriage house.
-
Maximized Space Efficiency: A new build ensures every square foot is optimized for living, storage, and parking.
Read more about whether tomodify an existing detached garage or demolish and start over.
Is a 2 Bedroom Carriage House Right for You?
Building a 2 bedroom carriage house is a practical way to add living space and value to your property. With this design, you maintain parking while creating a functional, private living area. Whether for rental, family, or guests, this design is an ideal solution for making the most of your property.
Let us help you customize the perfect ADU that fits your needs and enhances your lifestyle!
The ROI of your 749 sq ft ADU in real time
A 749 sq ft 2-bedroom ADU can serve different goals: a separate home for family, space for guests or a potential long-term rental. This layout lists 749 sq ft, 2 bedrooms, 2 bathrooms and 2 stories. Before comparing rental income, consider who would use the home and how the entrance, outdoor space and access would work alongside your main residence. Use the calculator to compare estimated annual rent with your project price. Adjust both figures to explore your own scenario.
Total Return On Your ADU Investment
Compare to other investments:
Real Estate
Avg. 6–8%
Stocks
Avg. 5–7%
Savings Account
Avg. 2–4%
Illustrative comparison ranges. Calculator shows gross annual rent divided by project price, before expenses, financing and taxes. Figures are editable examples, not a quote or guaranteed return.

A tip from our CEO
For this 749 sq ft 2-bedroom ADU, start by deciding which spaces need privacy and which should connect. Mark the route from the entrance to the living area, then check how it passes the bedrooms and bathrooms. Consider window placement, storage and everyday furniture at the same time so changes to one room do not compromise the rest of the home.
Look at the possibilities
Is this 749 sq ft 2-bedroom ADU right for you?
Compare the layout with how you intend to use the home. These are planning questions, not promises of approval or rental returns.
The room arrangement
Compare the recorded 749 sq ft area and 2 bedrooms with the room relationships shown in the drawing. Use furniture, storage and access needs to assess whether this layout suits your household.
The size of the home
Consider whether 749 sq ft suits the occupants, furniture and storage you have in mind.
Bathrooms and access
Review how the 2 bathrooms are reached from the living and sleeping spaces.
Outdoor relationships
Compare the front and rear views of this 749 sq ft 2-bedroom ADU with the access, privacy and outdoor space on your own property.
Designed around your property
Adapt the plan to your property
Local Approval Required
The status for this 749 sq ft 2-bedroom ADU is Local Approval Required. The layout does not establish approval for your address.Start with the site
Use the 749 sq ft layout and the floor-plan drawing to discuss property boundaries, access, utility routes and orientation.Coordinate your changes
Review changes to rooms, openings or finishes together with the drawings and technical coordination they require.Plan smart. Build right.
What to check before planning this 749 sq ft ADU
Use the 2-bedroom plan as a reference while gathering the information for your property.
Your address and jurisdiction
Confirm which local authority reviews the property and which requirements need checking for the proposed design.The proposed footprint
The drawing is listed as over garage. Review the drawing against a measured site plan.Entrances and connections
Discuss access, privacy and the route for water, drainage and electrical connections.The approval status
Local Approval Required. Complete the property-specific review and submission process before treating a plan as ready to build.Room for your next chapter
Plan your 749 sq ft around everyday life

Family living
Consider how the 2-bedroom arrangement could support the family members who would use the home.
Independent space
Review whether the 749 sq ft layout provides the living space and privacy your household needs.
Potential rental use
Discuss the intended use and applicable requirements before making assumptions about rental eligibility or income.
Long-term flexibility
Consider furniture, circulation and changing household needs when discussing revisions to the drawing.
Your path to a 749 sq ft 2-bedroom ADU
Move from a reference layout to a property-specific proposal with the relevant design and approval steps.
1
Discuss your property
Bring your address and your goals for this 749 sq ft 2-bedroom ADU to a 30-minute consultation.
2
Review the layout
Discuss the site information and the changes to investigate in the floor plan.
3
Develop the drawings
Coordinate the design documents and the technical information needed for the proposed project.
4
Review and plan the next step
Work through local review and the project scope before planning construction.
Frequently asked questions about this 749 sq ft 2-bedroom ADU
Explore the layout, customization, budgeting and property considerations for this 749 sq ft plan. Start with the drawing, then check how the design would work at your address.
How many bedrooms and bathrooms does this 749 sq ft plan have?
This layout lists 749 sq ft, 2 bedrooms, 2 bathrooms and 2 stories. Use the drawing to compare the relationship between the sleeping space, bathroom, kitchen and living area.
What are the dimensions of this 749 sq ft 2-bedroom ADU?
The recorded overall dimensions are See floor plan, and the listed area is 749 sq ft. Overall dimensions and floor area describe different things, especially where a building has an irregular outline or more than one level. Use the dimensioned drawing when checking the footprint, and confirm dimensions in the final coordinated drawings before construction.
Is this a pre-approved ADU plan?
The status of this 749 sq ft 2-bedroom ADU is Local Approval Required. The drawing is a starting point for a property-specific design, not an approval for your address. Site placement, utilities, access and the final construction documents still need to be reviewed. An approval held by a reference plan elsewhere does not establish approval for your property.
Can I customize this 749 sq ft floor plan?
Yes, changes can be explored during design. Start with the rooms and features you want to retain, then identify what needs to change. Moving walls, changing windows or rearranging plumbing can affect several parts of the drawing, so review those changes together rather than treating each as an isolated edit.
What should I bring to a 30-minute consultation?
Bring your property address, available site drawings, photos of the existing home and a short list of goals. Tell us why this 749 sq ft 2-bedroom ADU appeals to you and what you would change. Information about access, existing structures and utility locations helps make the conversation more specific, even if you do not yet have a complete set of plans.
How much would it cost to build this 749 sq ft 2-bedroom ADU?
The 749 sq ft area alone is not enough to price construction. Access, ground conditions, utility work, the selected building system and finishes all affect the scope. Request a property-specific estimate that separates design, engineering, permit fees, site preparation and construction. The images on this page do not establish a construction price or a guaranteed total budget.
How long would design, approval and construction take?
The schedule for this 749 sq ft 2-bedroom ADU depends on the property, the extent of customization and the required reviews. Separate the schedule into design, engineering coordination, permit review, site preparation and building work. Ask which decisions or records are needed before each stage begins. A schedule for another property is not a reliable completion promise for yours.
Can this layout work for a family member or multigenerational living?
This layout lists 749 sq ft, 2 bedrooms, 2 bathrooms and 2 stories. Discuss the intended resident’s daily routine before choosing the final arrangement. Check privacy, access to the bathroom, kitchen use and the relationship to the main home. If step-free access or other mobility needs matter, raise them at the start so the entrance, clearances and fixtures can be considered as part of the design.
Can I use part of the home as an office or flex space?
With 2 bedrooms, this plan gives you rooms to compare for sleeping, work or flexible use. Decide how many bedrooms you need to retain, then check furniture, storage and circulation before assigning an office. The 749 sq ft drawing should be reviewed around the actual activities you need the home to support.
Does this plan automatically fit my backyard?
No. The recorded dimensions of See floor plan are only one part of a fit check. The design team also needs to understand the property boundaries, existing buildings, required access, utilities and applicable development standards. A clear area in a photograph does not establish a buildable envelope. Review the building placement on a measured site plan.
Could this be used for a garage conversion?
This page presents a 749 sq ft floor-plan layout, not a confirmation that an existing garage can accommodate it. A conversion starts with the actual garage dimensions and condition. Structure, floor levels, openings and services need assessment before deciding what can stay. Compare the existing building with this drawing before assuming that the same footprint or room arrangement will transfer.
How should I plan the kitchen, bathroom and laundry?
Review appliance sizes, door swings, storage and the space needed to use fixtures comfortably. Check where water, drainage, electrical and ventilation services would run. Keeping a preferred room arrangement is useful only if the coordinated design can support the way those spaces will be used.
Can the entrance or windows be repositioned?
Entrance and window changes can be explored when adapting this 749 sq ft 2-bedroom ADU. Consider privacy from the main home, the approach from the street, daylight and furniture placement. Moving an opening can also affect the wall and the surrounding design. Review it with the site layout and coordinated drawings rather than relying on the preview image alone.
Will this plan require additional parking?
Parking needs to be checked for the property and proposed ADU type. This 749 sq ft drawing does not establish a parking requirement or an exemption for your address. Include existing parking, driveways and the proposed access route in the site review. Confirm the applicable requirements with the reviewing authority before fixing the building placement.
How can I compare this layout with other ADU floor plans?
Start with the actual 749 sq ft area, the bedroom and bathroom count, and the recorded dimensions of See floor plan. Then compare the kitchen, storage, privacy and access to each room. A larger advertised area does not by itself mean a better fit. Use the floor plan alongside the exterior views, and shortlist the layouts that support your intended use and property.
How does this layout compare with 2 story garage plans?
This plan has 749 sq ft, 2 bedrooms and 2 bathrooms.