1BR/1BA 749 Sq Ft | Layout 3

749 SQFT, 1 BED, 1 BATH

  • Floor Plan
  • Front Perspective
  • Rear Perspective
  • Left Side
  • Right Side
  • Top View

1BR/1BA 749 Sq Ft | Layout 3

749 SQFT, 1 BED, 1 BATH

Plan status: Local Approval Required

1 Bedroom

1 Bath

Square

749 SQFT

27′ × 27′

1 Story

Customize any design to suit your individual needs.

Adjustment options available for your perfect ADU.

In-house designers will adapt any layout to your exact requirements.

Compare this 749 sq ft 1-bedroom ADU with 1 bathroom and explore the floor plan alongside its exterior views.

Plan description

1 Bedroom Granny Flat Floor Plans: Spacious, Functional, and Full of Storage

Our 1 bedroom granny flat plans offer a thoughtful design that maximizes both living space and storage. This 750 sq ft layout features a large bedroom, an open living room and kitchen, and plenty of built-in storage options. Perfect for accommodating family members or offering rental space, this granny flat combines modern functionality with a cozy, home-like feel.

Read less Read more

What Is a Granny Flat and How Is It Different From an ADU?

A granny flat is a self-contained living space built on the same lot as a primary residence and often intended for housing family members, such as aging parents.  A term often used interchangeably with accessory dwelling units (ADUs), granny flats are traditionally designed with multigenerational living in mind and may offer more accessible layouts or additional storage for convenience. Granny flats provide privacy and independence while being close to the main home, making them a great solution for housing family or providing a rental unit.

Smart and Spacious Layout: 750 Sq Ft of Comfortable Living

This 1 bedroom granny flat floor plan is designed with storage and functionality in mind. The 750 sq ft layout offers a square design, making the most of every corner. With a spacious bedroom, open-concept living area, and multiple storage options, this granny flat is perfect for long-term living.

Key Layout Features:

  • Open-Concept Living Room and Kitchen: The living room flows into the kitchen in a great room style, providing a bright and open area for entertaining or relaxing. The kitchen is highly functional, with an optional 5′ peninsula for additional counter space and seating.

  • Large Bedroom with Ensuite Bath: These granny flat plans have 1 bedroom that is big enough to serve as both a sleeping area and a home office, offering flexibility for those who need extra space. It includes a large walk-in closet and an ensuite bathroom for privacy and convenience.

  • Abundant Storage: This granny flat is designed with storage in mind. It features a kitchen pantry, a hallway closet, and a large bedroom closet, ensuring plenty of room to keep the home organized and clutter-free.

  • In-Unit Laundry: A built-in laundry area makes this granny flat self-sufficient, providing convenience for daily living.

  • French Doors for Natural Light: The main living space includes French doors that let in plenty of natural light and offer easy access to outdoor spaces, enhancing the connection between indoor and outdoor living.

Site-specific approval and drawing review

Local Approval Required. This 749 sq ft 1-bedroom ADU is a starting layout for a property-specific design. Its catalog listing does not establish approval for your address or inclusion in a city plan program.

Review the measured site, the proposed building position and the documents needed for your project with the design team. Any changes to the layout, openings or dimensions need to be coordinated in the drawing set before submission.

Discuss customization and the agreed design scope with Uni Construction. Confirm the actual review process with the responsible authority.

Original reference drawings

The original reference drawing set is separate from the property-specific Uni Construction documents. Its source-program status does not establish local approval for this catalog layout.

Cost to Build a 1 Bedroom Granny Flat

Key Cost Considerations:

  • Lower Construction Costs: This granny flat is large enough to provide comfortable living while keeping construction costs manageable. The compact footprint requires fewer materials and less labor than larger units.

  • Reduced Permit Fees and Waived Impact Fees: At 750 sq ft, impact fees are waived per California state ADU laws and ADU permit fees will be less than a larger unit.

  • Customization Options: You can personalize the layout with options like a 5′ kitchen peninsula, custom finishes, or upgraded fixtures, allowing you to tailor the home to your specific needs without significantly increasing costs.

The ROI of your 749 sq ft ADU in real time

A 749 sq ft 1-bedroom ADU can serve different goals: a separate home for family, space for guests or a potential long-term rental. This layout lists 749 sq ft, 1 bedroom, 1 bathroom and 1 story. Before comparing rental income, consider who would use the home and how the entrance, outdoor space and access would work alongside your main residence. Use the calculator to compare estimated annual rent with your project price. Adjust both figures to explore your own scenario.

$
$

Total Return On Your ADU Investment

12.0%

Compare to other investments:

Real Estate

Avg. 6–8%

Stocks

Avg. 5–7%

Savings Account

Avg. 2–4%

Illustrative comparison ranges. Calculator shows gross annual rent divided by project price, before expenses, financing and taxes. Figures are editable examples, not a quote or guaranteed return.

749 sq ft 1 bedroom ADU: Front Perspective

A tip from our CEO

MK

For this 749 sq ft 1-bedroom ADU, start by deciding which spaces need privacy and which should connect. Mark the route from the entrance to the living area, then check how it passes the bedrooms and bathrooms. Consider window placement, storage and everyday furniture at the same time so changes to one room do not compromise the rest of the home.

Key details of this 749 sq ft 1-bedroom ADU

This 749 sq ft 1-bedroom ADU lists 1 bathroom and 1 story.

749 sq ft 1 bedroom ADU: Floor Plan

1 bedroom

Review sleeping space, furniture placement and the route to the bathroom in this 1-bedroom drawing.
749 sq ft 1 bedroom ADU: Front Perspective

1 bathroom

The source lists 1 bathroom. Review the drawing for fixture positions, access and any changes you would like to discuss.
749 sq ft 1 bedroom ADU: Rear Perspective

749 sq ft

The listed floor area is 749 sq ft. Confirm the final measurement and site fit during drawing development.
749 sq ft 1 bedroom ADU: Left Side

1 story

This is listed as a 1-story arrangement. Review entrances, circulation and its relationship to surrounding structures.
749 sq ft 1 bedroom ADU: Right Side

Layout and circulation

Trace the route from the entrance to the kitchen, bathroom and sleeping space. Check furniture clearances and door swings on this 749 sq ft drawing before deciding whether an opening or partition should move.
749 sq ft 1 bedroom ADU: Top View

A starting point for your property

Use this 749 sq ft 1-bedroom ADU to discuss orientation, openings and the details that need to be coordinated for your address.

Look at the possibilities

Is this 749 sq ft 1-bedroom ADU right for you?

Compare the layout with how you intend to use the home. These are planning questions, not promises of approval or rental returns.

The room arrangement

Compare the recorded 749 sq ft area and 1 bedroom with the room relationships shown in the drawing. Use furniture, storage and access needs to assess whether this layout suits your household.

The size of the home

Consider whether 749 sq ft suits the occupants, furniture and storage you have in mind.

Bathrooms and access

Review how the 1 bathroom is reached from the living and sleeping spaces.

Outdoor relationships

Compare the front and rear views of this 749 sq ft 1-bedroom ADU with the access, privacy and outdoor space on your own property.

Designed around your property

Adapt the plan to your property

Local Approval Required

The status for this 749 sq ft 1-bedroom ADU is Local Approval Required. The layout does not establish approval for your address.

Start with the site

Use the 749 sq ft layout and the floor-plan drawing to discuss property boundaries, access, utility routes and orientation.

Coordinate your changes

Review changes to rooms, openings or finishes together with the drawings and technical coordination they require.

Plan smart. Build right.

What to check before planning this 749 sq ft ADU

Use the 1-bedroom plan as a reference while gathering the information for your property.

Your address and jurisdiction

Confirm which local authority reviews the property and which requirements need checking for the proposed design.

The proposed footprint

The drawing is listed as square. Its recorded dimensions are 27′ × 27′. Review the drawing against a measured site plan.

Entrances and connections

Discuss access, privacy and the route for water, drainage and electrical connections.

The approval status

Local Approval Required. Complete the property-specific review and submission process before treating a plan as ready to build.

Room for your next chapter

Plan your 749 sq ft around everyday life

749 sq ft 1 bedroom ADU: Rear Perspective

Family living

Consider how the 1-bedroom arrangement could support the family members who would use the home.

Independent space

Review whether the 749 sq ft layout provides the living space and privacy your household needs.

Potential rental use

Discuss the intended use and applicable requirements before making assumptions about rental eligibility or income.

Long-term flexibility

Consider furniture, circulation and changing household needs when discussing revisions to the drawing.

Your path to a 749 sq ft 1-bedroom ADU

Move from a reference layout to a property-specific proposal with the relevant design and approval steps.

1

Discuss your property

Bring your address and your goals for this 749 sq ft 1-bedroom ADU to a 30-minute consultation.

2

Review the layout

Discuss the site information and the changes to investigate in the floor plan.

3

Develop the drawings

Coordinate the design documents and the technical information needed for the proposed project.

4

Review and plan the next step

Work through local review and the project scope before planning construction.

Frequently asked questions about this 749 sq ft 1-bedroom ADU

Explore the layout, customization, budgeting and property considerations for this 749 sq ft plan. Start with the drawing, then check how the design would work at your address.

How many bedrooms and bathrooms does this 749 sq ft plan have?

This layout lists 749 sq ft, 1 bedroom, 1 bathroom and 1 story. Use the drawing to compare the relationship between the sleeping space, bathroom, kitchen and living area.

What are the dimensions of this 749 sq ft 1-bedroom ADU?

The recorded overall dimensions are 27′ × 27′, and the listed area is 749 sq ft. Overall dimensions and floor area describe different things, especially where a building has an irregular outline or more than one level. Use the dimensioned drawing when checking the footprint, and confirm dimensions in the final coordinated drawings before construction.

Is this a pre-approved ADU plan?

The status of this 749 sq ft 1-bedroom ADU is Local Approval Required. The drawing is a starting point for a property-specific design, not an approval for your address. Site placement, utilities, access and the final construction documents still need to be reviewed. An approval held by a reference plan elsewhere does not establish approval for your property.

Can I customize this 749 sq ft floor plan?

Yes, changes can be explored during design. Start with the rooms and features you want to retain, then identify what needs to change. Moving walls, changing windows or rearranging plumbing can affect several parts of the drawing, so review those changes together rather than treating each as an isolated edit.

What should I bring to a 30-minute consultation?

Bring your property address, available site drawings, photos of the existing home and a short list of goals. Tell us why this 749 sq ft 1-bedroom ADU appeals to you and what you would change. Information about access, existing structures and utility locations helps make the conversation more specific, even if you do not yet have a complete set of plans.

How much would it cost to build this 749 sq ft 1-bedroom ADU?

The 749 sq ft area alone is not enough to price construction. Access, ground conditions, utility work, the selected building system and finishes all affect the scope. Request a property-specific estimate that separates design, engineering, permit fees, site preparation and construction. The images on this page do not establish a construction price or a guaranteed total budget.

How long would design, approval and construction take?

The schedule for this 749 sq ft 1-bedroom ADU depends on the property, the extent of customization and the required reviews. Separate the schedule into design, engineering coordination, permit review, site preparation and building work. Ask which decisions or records are needed before each stage begins. A schedule for another property is not a reliable completion promise for yours.

Can this layout work for a family member or multigenerational living?

This layout lists 749 sq ft, 1 bedroom, 1 bathroom and 1 story. Discuss the intended resident’s daily routine before choosing the final arrangement. Check privacy, access to the bathroom, kitchen use and the relationship to the main home. If step-free access or other mobility needs matter, raise them at the start so the entrance, clearances and fixtures can be considered as part of the design.

Can I use part of the home as an office or flex space?

A workspace needs to fit without displacing the essential living and sleeping functions. Consider a desk location, daylight, storage and how the work area can be separated at the end of the day. The 749 sq ft drawing should be reviewed around the actual activities you need the home to support.

Does this plan automatically fit my backyard?

No. The recorded dimensions of 27′ × 27′ are only one part of a fit check. The design team also needs to understand the property boundaries, existing buildings, required access, utilities and applicable development standards. A clear area in a photograph does not establish a buildable envelope. Review the building placement on a measured site plan.

Could this be used for a garage conversion?

This page presents a 749 sq ft floor-plan layout, not a confirmation that an existing garage can accommodate it. A conversion starts with the actual garage dimensions and condition. Structure, floor levels, openings and services need assessment before deciding what can stay. Compare the existing building with this drawing before assuming that the same footprint or room arrangement will transfer.

How should I plan the kitchen, bathroom and laundry?

Review appliance sizes, door swings, storage and the space needed to use fixtures comfortably. Check where water, drainage, electrical and ventilation services would run. Keeping a preferred room arrangement is useful only if the coordinated design can support the way those spaces will be used.

Can the entrance or windows be repositioned?

Entrance and window changes can be explored when adapting this 749 sq ft 1-bedroom ADU. Consider privacy from the main home, the approach from the street, daylight and furniture placement. Moving an opening can also affect the wall and the surrounding design. Review it with the site layout and coordinated drawings rather than relying on the preview image alone.

Will this plan require additional parking?

Parking needs to be checked for the property and proposed ADU type. This 749 sq ft drawing does not establish a parking requirement or an exemption for your address. Include existing parking, driveways and the proposed access route in the site review. Confirm the applicable requirements with the reviewing authority before fixing the building placement.

How can I compare this layout with other ADU floor plans?

Start with the actual 749 sq ft area, the bedroom and bathroom count, and the recorded dimensions of 27′ × 27′. Then compare the kitchen, storage, privacy and access to each room. A larger advertised area does not by itself mean a better fit. Use the floor plan alongside the exterior views, and shortlist the layouts that support your intended use and property.

How does this layout compare with 1 bedroom granny flat floor plans?

This plan has 749 sq ft, 1 bedroom and 1 bathroom.

Compare related floor plans

1 BR | 1 BA

In-house designers will adapt any layout to your exact requirements.

749 SF

1 Bed

1 Bath

1 BR | 1 BA

In-house designers will adapt any layout to your exact requirements.

749 SF

1 Bed

1 Bath

1 BR | 1 BA

In-house designers will adapt any layout to your exact requirements.

696 SF

1 Bed

1 Bath