749 SQFT, 1 BED, 1 BATH
1BR/1BA 36×25 L-Shape
749 SQFT, 1 BED, 1 BATH
Plan status: Local Approval Required
1 Bedroom
1 Bath
See floor plan
749 SQFT
36′ × 25′
1 Story
Customize any design to suit your individual needs.
Adjustment options available for your perfect ADU.
In-house designers will adapt any layout to your exact requirements.
Compare this 749 sq ft 1-bedroom ADU with 1 bathroom and explore the floor plan alongside its exterior views.
Plan description
1 Bedroom Guest House Plans: Spacious and Practical Designs for Extra Living Space
Our guest house plans with 1 bedroom offer the perfect balance between comfort and functionality, making them ideal for accommodating guests or providing a private space for family members. This 750 sq ft layout features a large kitchen and living room with optional dual sliding glass doors or French doors, creating a bright, open atmosphere. With a well-designed layout and luxurious amenities, this guest house ensures that your visitors enjoy all the comforts of home.
Read less Read more
Thoughtfully Designed Layout for Maximum Comfort
This 1 bedroom guest house floor plan is designed to make the most of its 750 square feet. The L-shaped layout naturally separates the living space from the bedroom, offering privacy while maintaining a sense of openness throughout the home. The open kitchen and living room offer a spacious area for relaxing and entertaining, while the bedroom provides a peaceful retreat for guests.
Key Layout Features:
-
L-Shaped Design: The L-shape not only enhances privacy by separating the living and sleeping areas, but also provides a more visually appealing design that breaks away from the typical rectangular layout.
-
Open Kitchen and Living Space: The kitchen seamlessly flows into the living area, creating an ideal space for hosting and everyday living. With the option to add dual sliding glass doors or French doors, this area can easily connect to outdoor spaces such as a patio or poolside area. If considering building your ADU near a pool, check out our Poolside ADU guide.
-
Spacious Bedroom: These guest house floor plans have 1 bedroom, which comfortably fits a queen-size bed and includes a walk-in closet with stacked in-unit laundry for added convenience.
-
Accessible Bathroom: The bathroom is conveniently located in the hallway, accessible from both the bedroom and the living space, ensuring ease of use for guests and homeowners alike. If building next to a pool, this accessible location is perfect.
750 Sq Ft: The Ideal Size for a Guest House
At just under 750 square feet, this 1 bedroom guest house provides a spacious, comfortable living environment without requiring a large lot. It’s an excellent option for homeowners who need extra living space without building a larger, more expensive unit. Whether used as a guest suite, rental unit, or family member’s residence, this size strikes the perfect balance between functionality and affordability.
Benefits of Building a 750 Sq Ft Guest House:
-
Spacious but Manageable: At 750 sq ft, this unit provides enough space for comfortable living, but it remains easy to maintain and care for. It includes a full kitchen, large bedroom, walk-in closet, and laundry, all within a compact footprint.
-
Waived Impact Fees: ADUs that are 750 sq ft or smaller qualify for waived impact fees per California state ADU laws, providing substantial cost savings compared to larger ADUs.
-
Statewide Exemption ADU: This guest house is allowed even if your property has floor area ratio (FAR) restrictions. As long as the unit meets required ADU setbacks, it’s permitted regardless of your lot’s FAR limits.
-
Perfect for Smaller Yards: The 750 sq ft size is ideal for properties with smaller backyards or tighter space constraints, making it an excellent solution for urban and suburban properties where maximizing space is essential.
-
Customizable for Indoor-Outdoor Living: With optional sliding glass or French doors, this guest house plan allows for seamless indoor-outdoor living, perfect for homes with a pool or garden.
Cost to Build a 1 Bedroom Guest House
Building a 1 bedroom guest house provides a cost-effective way to add value to your property while maintaining an affordable construction budget. This size qualifies for reduced permit fees and offers lower energy and maintenance costs compared to larger ADUs.
Key Cost Considerations:
-
Lower Construction Costs: A smaller unit naturally requires fewer materials and less labor, leading to a lower total ADU cost. This makes it a more affordable choice for adding a functional living space to your property.
-
Waived Impact Fees: As mentioned previously, ADUs under 750 sq ft benefit from waived impact fees, which can save homeowners thousands of dollars.
-
Energy Efficiency: With a smaller square footage, this guest house is easier and more affordable to heat, cool, and maintain. The result is lower utility bills and ongoing savings over time.
-
Customization Options: While the base model is cost-effective, you can still add personal touches like upgraded interior finishes, dual doors, and outdoor connections to enhance the unit without significantly increasing costs.
Unique Customization Options for Your Guest House
Our 1 bedroom guest house floor plans are designed with flexibility in mind, allowing you to customize the layout to fit your property and needs. Whether you prefer sliding glass doors to connect to a backyard patio or French doors to create a more elegant entryway, we offer a variety of options to make this guest house truly your own.
The ROI of your 749 sq ft ADU in real time
A 749 sq ft 1-bedroom ADU can serve different goals: a separate home for family, space for guests or a potential long-term rental. This layout lists 749 sq ft, 1 bedroom, 1 bathroom and 1 story. Before comparing rental income, consider who would use the home and how the entrance, outdoor space and access would work alongside your main residence. Use the calculator to compare estimated annual rent with your project price. Adjust both figures to explore your own scenario.
Total Return On Your ADU Investment
Compare to other investments:
Real Estate
Avg. 6–8%
Stocks
Avg. 5–7%
Savings Account
Avg. 2–4%
Illustrative comparison ranges. Calculator shows gross annual rent divided by project price, before expenses, financing and taxes. Figures are editable examples, not a quote or guaranteed return.

A tip from our CEO
For this 749 sq ft 1-bedroom ADU, start by deciding which spaces need privacy and which should connect. Mark the route from the entrance to the living area, then check how it passes the bedrooms and bathrooms. Consider window placement, storage and everyday furniture at the same time so changes to one room do not compromise the rest of the home.
Look at the possibilities
Is this 749 sq ft 1-bedroom ADU right for you?
Compare the layout with how you intend to use the home. These are planning questions, not promises of approval or rental returns.
The room arrangement
Compare the recorded 749 sq ft area and 1 bedroom with the room relationships shown in the drawing. Use furniture, storage and access needs to assess whether this layout suits your household.
The size of the home
Consider whether 749 sq ft suits the occupants, furniture and storage you have in mind.
Bathrooms and access
Review how the 1 bathroom is reached from the living and sleeping spaces.
Outdoor relationships
Compare the front and rear views of this 749 sq ft 1-bedroom ADU with the access, privacy and outdoor space on your own property.
Designed around your property
Adapt the plan to your property
Local Approval Required
The status for this 749 sq ft 1-bedroom ADU is Local Approval Required. The layout does not establish approval for your address.Start with the site
Use the 749 sq ft layout and the floor-plan drawing to discuss property boundaries, access, utility routes and orientation.Coordinate your changes
Review changes to rooms, openings or finishes together with the drawings and technical coordination they require.Plan smart. Build right.
What to check before planning this 749 sq ft ADU
Use the 1-bedroom plan as a reference while gathering the information for your property.
Your address and jurisdiction
Confirm which local authority reviews the property and which requirements need checking for the proposed design.The proposed footprint
The drawing is listed as see floor plan. Its recorded dimensions are 36′ × 25′. Review the drawing against a measured site plan.Entrances and connections
Discuss access, privacy and the route for water, drainage and electrical connections.The approval status
Local Approval Required. Complete the property-specific review and submission process before treating a plan as ready to build.Room for your next chapter
Plan your 749 sq ft around everyday life

Family living
Consider how the 1-bedroom arrangement could support the family members who would use the home.
Independent space
Review whether the 749 sq ft layout provides the living space and privacy your household needs.
Potential rental use
Discuss the intended use and applicable requirements before making assumptions about rental eligibility or income.
Long-term flexibility
Consider furniture, circulation and changing household needs when discussing revisions to the drawing.
Your path to a 749 sq ft 1-bedroom ADU
Move from a reference layout to a property-specific proposal with the relevant design and approval steps.
1
Discuss your property
Bring your address and your goals for this 749 sq ft 1-bedroom ADU to a 30-minute consultation.
2
Review the layout
Discuss the site information and the changes to investigate in the floor plan.
3
Develop the drawings
Coordinate the design documents and the technical information needed for the proposed project.
4
Review and plan the next step
Work through local review and the project scope before planning construction.
Frequently asked questions about this 749 sq ft 1-bedroom ADU
Explore the layout, customization, budgeting and property considerations for this 749 sq ft plan. Start with the drawing, then check how the design would work at your address.
How many bedrooms and bathrooms does this 749 sq ft plan have?
This layout lists 749 sq ft, 1 bedroom, 1 bathroom and 1 story. Use the drawing to compare the relationship between the sleeping space, bathroom, kitchen and living area.
What are the dimensions of this 749 sq ft 1-bedroom ADU?
The recorded overall dimensions are 36′ × 25′, and the listed area is 749 sq ft. Overall dimensions and floor area describe different things, especially where a building has an irregular outline or more than one level. Use the dimensioned drawing when checking the footprint, and confirm dimensions in the final coordinated drawings before construction.
Is this a pre-approved ADU plan?
The status of this 749 sq ft 1-bedroom ADU is Local Approval Required. The drawing is a starting point for a property-specific design, not an approval for your address. Site placement, utilities, access and the final construction documents still need to be reviewed. An approval held by a reference plan elsewhere does not establish approval for your property.
Can I customize this 749 sq ft floor plan?
Yes, changes can be explored during design. Start with the rooms and features you want to retain, then identify what needs to change. Moving walls, changing windows or rearranging plumbing can affect several parts of the drawing, so review those changes together rather than treating each as an isolated edit.
What should I bring to a 30-minute consultation?
Bring your property address, available site drawings, photos of the existing home and a short list of goals. Tell us why this 749 sq ft 1-bedroom ADU appeals to you and what you would change. Information about access, existing structures and utility locations helps make the conversation more specific, even if you do not yet have a complete set of plans.
How much would it cost to build this 749 sq ft 1-bedroom ADU?
The 749 sq ft area alone is not enough to price construction. Access, ground conditions, utility work, the selected building system and finishes all affect the scope. Request a property-specific estimate that separates design, engineering, permit fees, site preparation and construction. The images on this page do not establish a construction price or a guaranteed total budget.
How long would design, approval and construction take?
The schedule for this 749 sq ft 1-bedroom ADU depends on the property, the extent of customization and the required reviews. Separate the schedule into design, engineering coordination, permit review, site preparation and building work. Ask which decisions or records are needed before each stage begins. A schedule for another property is not a reliable completion promise for yours.
Can this layout work for a family member or multigenerational living?
This layout lists 749 sq ft, 1 bedroom, 1 bathroom and 1 story. Discuss the intended resident’s daily routine before choosing the final arrangement. Check privacy, access to the bathroom, kitchen use and the relationship to the main home. If step-free access or other mobility needs matter, raise them at the start so the entrance, clearances and fixtures can be considered as part of the design.
Can I use part of the home as an office or flex space?
A workspace needs to fit without displacing the essential living and sleeping functions. Consider a desk location, daylight, storage and how the work area can be separated at the end of the day. The 749 sq ft drawing should be reviewed around the actual activities you need the home to support.
Does this plan automatically fit my backyard?
No. The recorded dimensions of 36′ × 25′ are only one part of a fit check. The design team also needs to understand the property boundaries, existing buildings, required access, utilities and applicable development standards. A clear area in a photograph does not establish a buildable envelope. Review the building placement on a measured site plan.
Could this be used for a garage conversion?
This page presents a 749 sq ft floor-plan layout, not a confirmation that an existing garage can accommodate it. A conversion starts with the actual garage dimensions and condition. Structure, floor levels, openings and services need assessment before deciding what can stay. Compare the existing building with this drawing before assuming that the same footprint or room arrangement will transfer.
How should I plan the kitchen, bathroom and laundry?
Review appliance sizes, door swings, storage and the space needed to use fixtures comfortably. Check where water, drainage, electrical and ventilation services would run. Keeping a preferred room arrangement is useful only if the coordinated design can support the way those spaces will be used.
Can the entrance or windows be repositioned?
Entrance and window changes can be explored when adapting this 749 sq ft 1-bedroom ADU. Consider privacy from the main home, the approach from the street, daylight and furniture placement. Moving an opening can also affect the wall and the surrounding design. Review it with the site layout and coordinated drawings rather than relying on the preview image alone.
Will this plan require additional parking?
Parking needs to be checked for the property and proposed ADU type. This 749 sq ft drawing does not establish a parking requirement or an exemption for your address. Include existing parking, driveways and the proposed access route in the site review. Confirm the applicable requirements with the reviewing authority before fixing the building placement.
How can I compare this layout with other ADU floor plans?
Start with the actual 749 sq ft area, the bedroom and bathroom count, and the recorded dimensions of 36′ × 25′. Then compare the kitchen, storage, privacy and access to each room. A larger advertised area does not by itself mean a better fit. Use the floor plan alongside the exterior views, and shortlist the layouts that support your intended use and property.
How does this layout compare with 1 bedroom flat plan drawing?
This plan has 749 sq ft, 1 bedroom and 1 bathroom.