Garage Conversion ADU

Give an existing garage a new purpose.

A garage conversion creates living space within an existing structure. The starting point is a careful understanding of what can be retained and what needs to change.

Book a 30-minute call
AI-generated illustration of a modest garage conversion adu
Illustrative concept, not a completed Uni Construction project.

What does garage conversion ADU mean?

It turns a suitable garage into an independent dwelling with living, sleeping, cooking and bathroom facilities. Replacing the garage door is only one part of the work. The structure and building systems need to support residential use.

Who might consider it?

Owners with a garage they are willing to repurpose who want to assess its potential for independent living.

Decisions worth making early

1

Existing conditions

Review the available information about the floor, walls and roof. Hidden conditions can affect the work even when the building already exists.

2

A comfortable layout

Plan daylight, storage, circulation and furniture rather than fitting rooms around the old garage door. The entrance should feel like the entrance to a home.

3

What moves elsewhere

Think through the storage, laundry or parking functions currently using the garage. A conversion works best when those needs have a realistic alternative.

Services for this project

The ADU type describes what you want to create. Services describe the design, documentation and construction work needed to get there.

Your questions, answered

What is a garage conversion ADU?

It turns a suitable garage into an independent dwelling with living, sleeping, cooking and bathroom facilities. Replacing the garage door is only one part of the work. The structure and building systems need to support residential use.

Can we reuse the slab and walls?

That depends on their condition and suitability. Existing drawings, inspection and any necessary investigation help establish what can stay. Do not budget on the assumption that every part of the garage is reusable.

Is a conversion always cheaper than a new ADU?

No. Existing conditions and required upgrades can change the comparison. Ask for scopes that include the same living requirements, utility work and site improvements before comparing prices.

Compare another option

Compare all ADU types

How could an ADU work for you?

  1. Tell us who it is for

    Family, your own home or a potential rental each brings different priorities. Discuss independence, access, privacy and the rooms you need.

  2. Review the property

    Share the address, photographs and available drawings. Identify the permitting agency and investigate the existing buildings, access, utilities and site constraints.

  3. Compare a realistic scope

    Explore suitable configurations and the work each requires. Compare design, consultant work, fees, construction and site improvements rather than a headline price alone.

  4. Develop the selected option

    Agree the design and documentation scope, prepare the required application and address review comments. Construction follows the necessary approvals and a defined construction agreement.

Discuss your property

Definitions checked against California HCD guidance. Property-specific requirements need individual review.