3BR/1BA 44×21 L-Shape

798 SQFT, 3 BED, 1 BATH

  • Floor Plan
  • Front Perspective
  • Rear Perspective
  • Left Side
  • Right Side
  • Top View

3BR/1BA 44×21 L-Shape

798 SQFT, 3 BED, 1 BATH

Plan status: Local Approval Required

3 Bedrooms

1 Bath

See floor plan

798 SQFT

44′ × 21′

1 Story

Customize any design to suit your individual needs.

Adjustment options available for your perfect ADU.

In-house designers will adapt any layout to your exact requirements.

Compare this 798 sq ft 3-bedroom ADU with 1 bathroom and explore the floor plan alongside its exterior views.

Plan description

800 Sq Ft ADU Floor Plans: Flexible 3 Bedroom Living in a Compact Design

Our ADU floor plans with 800 sq ft provide the perfect balance of space and functionality with a smart 3 bedroom, 1 bathroom layout. Designed to fit family members or renters comfortably, this layout includes an open kitchen and living area, a separate laundry room, and flexible customization options. Ideal for properties of all sizes, this plan is a great investment for maximizing living space on a smaller footprint.

Read less Read more

Efficient 3 Bedroom, 1 Bath Layout

These 800 sq ft ADU plans feature a thoughtful layout that combines privacy and practicality. Two bedrooms are situated together on one end, while the third bedroom forms the “L” shape on the opposite side. The single bathroom is centrally located, providing convenient access for all rooms and the common area.

Key Layout Features:

  • Three Bedrooms in a Compact Footprint: The layout includes three bedrooms without compromising comfort, making it a rare find for an 800 sq ft plan.

  • Open-Concept Kitchen and Living Room: The great room combines the kitchen and living space, creating a bright, welcoming central area.

  • Central Bathroom Access: The shared bathroom is centrally located for easy access from all bedrooms and the living area.

  • Dedicated Laundry Room: A separate laundry room offers storage space and a full-size washer/dryer setup.

  • Optional Covered Front Porch: Customize the exterior of the ADU and add an optional covered front porch, adding versatility and curb appeal.

Benefits of Building an 800 Sq Ft ADU

Building an 800 sq ft ADU allows for efficient, independent living space while maximizing property use. As a statewide exemption ADU, units up to 800 sq ft must be allowed by California state ADU laws in all municipalities, as long as they meet ADU setback requirements. This size is ideal for adding value without exceeding local size limits.

Key Benefits and Cost Considerations:

  • Allowed in All Municipalities: As a statewide exemption ADU, this 800 sq ft plan is permitted across California, including all cities in Los Angeles.

  • Compact Yet Spacious: With three bedrooms in an 800 sq ft footprint, this layout offers a practical solution for family or rental use.

  • Flexible Rental Potential: With three bedrooms, this ADU is well-suited for families, roommates, or tenants, generating rental income.

  • Enhanced Resale Value: An ADU of this size adds considerable value to your property, making it a smart investment in the long term.

Customization Options to Fit Your Needs

All of our ADU plans offer customization options to help you create the perfect layout.

Customization Highlights:

  • Kitchen Island: Add an island for more storage, seating, and a designated cooking space.

  • Vaulted Ceilings: Increase vertical space in the great room to create a more open, airy feel.

  • Sliding Doors for Outdoor Living: Connect the great room to a covered patio or yard for enhanced indoor-outdoor living.

  • Expand the Footprint: Easily expand on these ADU plans at 800 sq ft to increase living space.

These 800 sq ft house plans with 3 bedrooms combine comfort, functionality, and flexibility in a compact design. Whether for tenants, family, or guests, this plan maximizes livable space and offers great value. Let Uni Construction help you create the perfect ADU that fits your lifestyle and property.

The ROI of your 798 sq ft ADU in real time

A 798 sq ft 3-bedroom ADU can serve different goals: a separate home for family, space for guests or a potential long-term rental. This layout lists 798 sq ft, 3 bedrooms, 1 bathroom and 1 story. Before comparing rental income, consider who would use the home and how the entrance, outdoor space and access would work alongside your main residence. Use the calculator to compare estimated annual rent with your project price. Adjust both figures to explore your own scenario.

$
$

Total Return On Your ADU Investment

12.0%

Compare to other investments:

Real Estate

Avg. 6–8%

Stocks

Avg. 5–7%

Savings Account

Avg. 2–4%

Illustrative comparison ranges. Calculator shows gross annual rent divided by project price, before expenses, financing and taxes. Figures are editable examples, not a quote or guaranteed return.

798 sq ft 3 bedroom ADU: Front Perspective

A tip from our CEO

MK

For this 798 sq ft 3-bedroom ADU, start by deciding which spaces need privacy and which should connect. Mark the route from the entrance to the living area, then check how it passes the bedrooms and bathrooms. Consider window placement, storage and everyday furniture at the same time so changes to one room do not compromise the rest of the home.

Key details of this 798 sq ft 3-bedroom ADU

This 798 sq ft 3-bedroom ADU lists 1 bathroom and 1 story.

798 sq ft 3 bedroom ADU: Floor Plan

3 bedrooms

Review sleeping space, furniture placement and the route to the bathroom in this 3-bedroom drawing.
798 sq ft 3 bedroom ADU: Front Perspective

1 bathroom

The source lists 1 bathroom. Review the drawing for fixture positions, access and any changes you would like to discuss.
798 sq ft 3 bedroom ADU: Rear Perspective

798 sq ft

The listed floor area is 798 sq ft. Confirm the final measurement and site fit during drawing development.
798 sq ft 3 bedroom ADU: Left Side

1 story

This is listed as a 1-story arrangement. Review entrances, circulation and its relationship to surrounding structures.
798 sq ft 3 bedroom ADU: Right Side

Layout and circulation

Trace the route from the entrance to the kitchen, bathroom and sleeping space. Check furniture clearances and door swings on this 798 sq ft drawing before deciding whether an opening or partition should move.
798 sq ft 3 bedroom ADU: Top View

A starting point for your property

Use this 798 sq ft 3-bedroom ADU to discuss orientation, openings and the details that need to be coordinated for your address.

Look at the possibilities

Is this 798 sq ft 3-bedroom ADU right for you?

Compare the layout with how you intend to use the home. These are planning questions, not promises of approval or rental returns.

The room arrangement

Compare the recorded 798 sq ft area and 3 bedrooms with the room relationships shown in the drawing. Use furniture, storage and access needs to assess whether this layout suits your household.

The size of the home

Consider whether 798 sq ft suits the occupants, furniture and storage you have in mind.

Bathrooms and access

Review how the 1 bathroom is reached from the living and sleeping spaces.

Outdoor relationships

Compare the front and rear views of this 798 sq ft 3-bedroom ADU with the access, privacy and outdoor space on your own property.

Designed around your property

Adapt the plan to your property

Local Approval Required

The status for this 798 sq ft 3-bedroom ADU is Local Approval Required. The layout does not establish approval for your address.

Start with the site

Use the 798 sq ft layout and the floor-plan drawing to discuss property boundaries, access, utility routes and orientation.

Coordinate your changes

Review changes to rooms, openings or finishes together with the drawings and technical coordination they require.

Plan smart. Build right.

What to check before planning this 798 sq ft ADU

Use the 3-bedroom plan as a reference while gathering the information for your property.

Your address and jurisdiction

Confirm which local authority reviews the property and which requirements need checking for the proposed design.

The proposed footprint

The drawing is listed as see floor plan. Its recorded dimensions are 44′ × 21′. Review the drawing against a measured site plan.

Entrances and connections

Discuss access, privacy and the route for water, drainage and electrical connections.

The approval status

Local Approval Required. Complete the property-specific review and submission process before treating a plan as ready to build.

Room for your next chapter

Plan your 798 sq ft around everyday life

798 sq ft 3 bedroom ADU: Rear Perspective

Family living

Consider how the 3-bedroom arrangement could support the family members who would use the home.

Independent space

Review whether the 798 sq ft layout provides the living space and privacy your household needs.

Potential rental use

Discuss the intended use and applicable requirements before making assumptions about rental eligibility or income.

Long-term flexibility

Consider furniture, circulation and changing household needs when discussing revisions to the drawing.

Your path to a 798 sq ft 3-bedroom ADU

Move from a reference layout to a property-specific proposal with the relevant design and approval steps.

1

Discuss your property

Bring your address and your goals for this 798 sq ft 3-bedroom ADU to a 30-minute consultation.

2

Review the layout

Discuss the site information and the changes to investigate in the floor plan.

3

Develop the drawings

Coordinate the design documents and the technical information needed for the proposed project.

4

Review and plan the next step

Work through local review and the project scope before planning construction.

Frequently asked questions about this 798 sq ft 3-bedroom ADU

Explore the layout, customization, budgeting and property considerations for this 798 sq ft plan. Start with the drawing, then check how the design would work at your address.

How many bedrooms and bathrooms does this 798 sq ft plan have?

This layout lists 798 sq ft, 3 bedrooms, 1 bathroom and 1 story. Use the drawing to compare the relationship between the sleeping space, bathroom, kitchen and living area.

What are the dimensions of this 798 sq ft 3-bedroom ADU?

The recorded overall dimensions are 44′ × 21′, and the listed area is 798 sq ft. Overall dimensions and floor area describe different things, especially where a building has an irregular outline or more than one level. Use the dimensioned drawing when checking the footprint, and confirm dimensions in the final coordinated drawings before construction.

Is this a pre-approved ADU plan?

The status of this 798 sq ft 3-bedroom ADU is Local Approval Required. The drawing is a starting point for a property-specific design, not an approval for your address. Site placement, utilities, access and the final construction documents still need to be reviewed. An approval held by a reference plan elsewhere does not establish approval for your property.

Can I customize this 798 sq ft floor plan?

Yes, changes can be explored during design. Start with the rooms and features you want to retain, then identify what needs to change. Moving walls, changing windows or rearranging plumbing can affect several parts of the drawing, so review those changes together rather than treating each as an isolated edit.

What should I bring to a 30-minute consultation?

Bring your property address, available site drawings, photos of the existing home and a short list of goals. Tell us why this 798 sq ft 3-bedroom ADU appeals to you and what you would change. Information about access, existing structures and utility locations helps make the conversation more specific, even if you do not yet have a complete set of plans.

How much would it cost to build this 798 sq ft 3-bedroom ADU?

The 798 sq ft area alone is not enough to price construction. Access, ground conditions, utility work, the selected building system and finishes all affect the scope. Request a property-specific estimate that separates design, engineering, permit fees, site preparation and construction. The images on this page do not establish a construction price or a guaranteed total budget.

How long would design, approval and construction take?

The schedule for this 798 sq ft 3-bedroom ADU depends on the property, the extent of customization and the required reviews. Separate the schedule into design, engineering coordination, permit review, site preparation and building work. Ask which decisions or records are needed before each stage begins. A schedule for another property is not a reliable completion promise for yours.

Can this layout work for a family member or multigenerational living?

This layout lists 798 sq ft, 3 bedrooms, 1 bathroom and 1 story. Discuss the intended resident’s daily routine before choosing the final arrangement. Check privacy, access to the bathroom, kitchen use and the relationship to the main home. If step-free access or other mobility needs matter, raise them at the start so the entrance, clearances and fixtures can be considered as part of the design.

Can I use part of the home as an office or flex space?

With 3 bedrooms, this plan gives you rooms to compare for sleeping, work or flexible use. Decide how many bedrooms you need to retain, then check furniture, storage and circulation before assigning an office. The 798 sq ft drawing should be reviewed around the actual activities you need the home to support.

Does this plan automatically fit my backyard?

No. The recorded dimensions of 44′ × 21′ are only one part of a fit check. The design team also needs to understand the property boundaries, existing buildings, required access, utilities and applicable development standards. A clear area in a photograph does not establish a buildable envelope. Review the building placement on a measured site plan.

Could this be used for a garage conversion?

This page presents a 798 sq ft floor-plan layout, not a confirmation that an existing garage can accommodate it. A conversion starts with the actual garage dimensions and condition. Structure, floor levels, openings and services need assessment before deciding what can stay. Compare the existing building with this drawing before assuming that the same footprint or room arrangement will transfer.

How should I plan the kitchen, bathroom and laundry?

Review appliance sizes, door swings, storage and the space needed to use fixtures comfortably. Check where water, drainage, electrical and ventilation services would run. Keeping a preferred room arrangement is useful only if the coordinated design can support the way those spaces will be used.

Can the entrance or windows be repositioned?

Entrance and window changes can be explored when adapting this 798 sq ft 3-bedroom ADU. Consider privacy from the main home, the approach from the street, daylight and furniture placement. Moving an opening can also affect the wall and the surrounding design. Review it with the site layout and coordinated drawings rather than relying on the preview image alone.

Will this plan require additional parking?

Parking needs to be checked for the property and proposed ADU type. This 798 sq ft drawing does not establish a parking requirement or an exemption for your address. Include existing parking, driveways and the proposed access route in the site review. Confirm the applicable requirements with the reviewing authority before fixing the building placement.

How can I compare this layout with other ADU floor plans?

Start with the actual 798 sq ft area, the bedroom and bathroom count, and the recorded dimensions of 44′ × 21′. Then compare the kitchen, storage, privacy and access to each room. A larger advertised area does not by itself mean a better fit. Use the floor plan alongside the exterior views, and shortlist the layouts that support your intended use and property.

How does this layout compare with 800 sq ft adu floor plans?

This plan has 798 sq ft, 3 bedrooms and 1 bathroom. The search phrase "800 sq ft adu floor plans" describes a different or rounded size; the listed area for this drawing remains 798 sq ft. Compare the actual dimensions and room arrangement rather than assuming plans in the same size range are identical.

Compare related floor plans

3 BR | 2 BA

In-house designers will adapt any layout to your exact requirements.

893 SF

3 Bed

2 Bath

3 BR | 2 BA

In-house designers will adapt any layout to your exact requirements.

999 SF

3 Bed

2 Bath

2 BR | 2 BA

In-house designers will adapt any layout to your exact requirements.

836 SF

2 Bed

2 Bath