This Project in Pasadena was planned around comfort, safety, and durability. Uni Construction coordinated the scope for pool redesign and outdoor living construction with clear sequencing and buildable detailing to keep the work moving efficiently.
Key considerations included circulation around the pool, material performance in sun and water exposure, and finish selections that are attractive while remaining easy to clean and maintain.
The result is an upgraded outdoor area that feels cohesive, functional, and built for everyday use.