Uni Construction ADU design and construction - Junior ADU (JADU) - exterior inspiration image

Types of ADU's

Junior ADU (JADU)

A compact unit of up to 500 sq ft created within your existing home. JADUs are the most affordable ADU option no new foundation required and are often exempt from impact fees under California law.

Junior ADU (JADU) Design — The Most Affordable Way to Add a Unit to Your Home

A Junior Accessory Dwelling Unit (JADU) is a small, self-contained living space of up to 500 square feet of interior livable space, created entirely within your existing single-family home. JADUs include their own entrance and a cooking facility, and may share a bathroom with the main residence or have their own.

Because a JADU is carved from existing space, it requires no new foundation, no new exterior walls, and minimal structural work. This makes it the fastest and most affordable ADU option available to California homeowners.

Uni Construction ADU design and construction - Junior ADU (JADU) - design inspiration image
Uni Construction ADU design and construction - Junior ADU (JADU) - design inspiration image

Why Homeowners Choose JADUs

  • Lowest cost — no foundation, framing, or roofing. Conversion costs are a fraction of new construction.

  • Fully exempt from development impact fees and school fees under current California law

  • No fire sprinkler requirement if the main home does not already have sprinklers

  • Fastest Permitting timeline — cities must process JADU applications within 60 days

  • Can be built in addition to a full-size ADU on the same property — giving you two additional units

JADU vs. ADU — Key Differences

Feature

JADU

Standard ADU

Maximum size

500 sq ft

850–1,200 sq ft

Location

Within existing home

Attached or detached

New foundation

No

Often yes

Bathroom

Own or shared

Own (required)

Impact fees

Fully exempt

Exempt under 750 sq ft

Owner occupancy

Required*

Not required

Short-term rental

Not allowed

Check local rules

*Owner occupancy is required unless the JADU has its own separate bathroom, per AB 1154 (effective January 2026).

What We Design

Even though JADUs are small, they still require a complete plan set for permit approval:

  • Space planning: We optimize layouts within the 500 sq ft limit to include a sleeping area, living space, kitchenette, and bathroom.

  • Separate entrance: Required by law. We design an independent entry that maintains privacy for both units.

  • Cooking facility: At minimum, a kitchenette with a sink, counter, and small cooking appliance hookup. Full kitchens are also an option.

  • Fire separation: Fire-rated wall or ceiling assemblies between the JADU and the rest of the home.

  • Title 24 & CALGreen: Energy and green building compliance documents.

Uni Construction ADU design and construction - Junior ADU (JADU) - construction planning inspiration image

Best Candidates for a JADU

JADUs work especially well in homes that have a spare bedroom, large bonus room, or underutilized section of the house near an exterior wall. Common conversions include master suites, in-law quarters, large laundry/utility rooms, or enclosed patios.

You can also build a JADU in combination with a detached or attached ADU on the same lot. This means one single-family property can have up to three units total — the main home, a JADU, and a standard ADU.

Want to explore whether a JADU works in your home? Get a free feasibility report — we’ll assess your space and walk you through the options.

FAQ

Questions?
We’ll Make It Clear

ADU and construction projects come with a lot of questions—here are the answers we get most.

What are the different phases of a construction project?

Do I need a design team for my project?

How long does the construction process typically take?

How much will my project cost?

How do I believe you're the right fit?

Contact

brown wooden bed frame with white and brown bed linen

Contact Us

brown wooden bed frame with white and brown bed linen

Contact Us