Uni Construction ADU design and construction - Attached ADU - exterior inspiration image

Types of ADU's

Attached ADU

A unit connected to your existing home with its own entrance, kitchen, and bathroom. Ideal when yard space is limited. We design attached ADUs that integrate with your homes structure while meeting all building and zoning requirements.

Attached ADU Design — Add a Private Living Space Connected to Your Home

An attached accessory dwelling unit is a self-contained living space that shares at least one wall with your primary residence. It has its own entrance, kitchen, bathroom, and living area but is physically connected to your main house — making it a practical choice when backyard space is limited or when you want family members close by.

  • Uni Construction has designed hundreds of attached ADUs across Los Angeles County. We specialize in designing additions that blend with your home’s existing architecture while meeting every structural, zoning, and code requirement.

Uni Construction ADU design and construction - Attached ADU - design inspiration image
Uni Construction ADU design and construction - Attached ADU - design inspiration image

Why Homeowners Choose Attached ADUs

  • Lower construction cost than detached — shared walls reduce foundation, roofing, and framing expenses

  • Ideal for multigenerational living — close proximity with full privacy

  • Shared utilities can simplify connections and reduce infrastructure costs

  • Works well on smaller lots where setbacks limit detached construction

  • Increases property value while expanding your home’s overall footprint

What We Design

Our attached ADU design package includes every document required for permit approval:

  • Integration analysis: We study your home’s existing structure, foundation, and roof to determine the best connection point

  • Full set plans: Floor plans, building sections, and elevations showing how the ADU integrates with the existing home

  • Structural engineering: Connection details, load calculations, and reinforcement plans stamped by a licensed engineer

  • MEP design: Plumbing, electrical, and HVAC layouts — tied into or separated from existing systems based on what’s most efficient

  • Title 24 & CALGreen: Energy compliance and green building reports

Size & Zoning Quick Reference

California law allows attached ADUs up to 850 square feet for a studio or one-bedroom, and up to 1,000 square feet for two or more bedrooms. Attached ADUs cannot exceed 50% of the existing home’s floor area. Height limits are up to 25 feet or the height of the primary dwelling, whichever is lower. No additional parking is required if the property is within half a mile of public transit.

Uni Construction ADU design and construction - Attached ADU - construction planning inspiration image

Common Attached ADU Configurations

  • Side addition: Extends off the side of your home with a separate entrance from the driveway or side yard

  • Rear addition: Built off the back of the house, often opening to the backyard

  • Second-story addition: Stacks the ADU above the existing home or garage — preserves your entire yard

Each configuration has different structural and cost implications. We walk you through the trade-offs during the feasibility stage so you can make an informed decision.

Wondering if an attached ADU makes sense for your home? Get a free feasibility report and find out what’s possible on your property.

FAQ

Questions?
We’ll Make It Clear

ADU and construction projects come with a lot of questions—here are the answers we get most.

What are the different phases of a construction project?

Do I need a design team for my project?

How long does the construction process typically take?

How much will my project cost?

How do I believe you're the right fit?

Contact

brown wooden bed frame with white and brown bed linen

Contact Us

brown wooden bed frame with white and brown bed linen

Contact Us