Restroom Remodel

outdated bathroom into a modern space

Task

Restroom Remodeling

Role

General Contractor

About Project

Explore how Uni Construction transformed an outdated bathroom in into a modern space. We collaborated closely with the homeowner to understand their vision and create a design that met their needs and budget. This project highlights our commitment to quality craftsmanship, clear communication, and delivering a relaxing renovation experience.

Project Scope

The bathroom remodel encompassed a comprehensive upgrade, creating a spa-like atmosphere for the homeowner:

Fixtures & Finishes:

Outdated fixtures were replaced with modern and stylish options. A new low-profile toilet, sleek faucets with a brushed nickel finish, and a rainfall showerhead with multiple spray settings elevate both form and function.

Cabinetry & Countertops:

The old vanity was replaced with a beautiful new vanity in a calming light gray color, offering ample storage. A stunning quartz countertop with a polished finish adds a touch of luxury.

Shower Transformation:

The existing shower enclosure was removed, and a walk-in shower with frameless glass doors was installed. The shower features beautiful subway tile surround in a calming neutral tone, and a built-in shower niche provides convenient storage for toiletries.

Flooring Refresh:

The old and worn-out flooring was replaced with luxurious heated tile flooring in a wood-look finish. This not only enhances the aesthetics but also provides a comfortable warmth underfoot, especially during the cooler months.

Lighting Design:

Uni Construction designed and installed a new lighting scheme that combines recessed overhead lighting with dimmer switches for a relaxing ambiance. Additionally, task lighting over the vanity mirror ensures optimal task lighting for grooming.

Storage Solutions:

We maximized storage by incorporating built-in drawers and cabinets within the vanity unit, providing ample space for towels, toiletries, and other bathroom essentials.

Ventilation Upgrade:

A new ventilation system was installed to prevent moisture buildup and mold growth, ensuring a healthy and comfortable bathroom environment.

Discover the Difference

Collaborative Design Process:

We prioritized understanding their vision and needs to create a personalized bathroom design that reflects their style and needs.

Expert Project Management:

Our experienced project managers kept the renovation on track and within budget, minimizing disruption to the daily routine.

Open Communication:

Maintained clear communication throughout the entire process, addressing any questions or concerns promptly.

Project gallery

Top Construction Services in LA by Uni Construction

Hospitality

Mixed-use-modified-featured-image

Mixed Use

Food-and-beverages-modified-featured-image

FOOD & BEVERAGES

Education-sector-modified-featured-image

EDUCATION & PUBLIC SECTOR

Broad-museum-featured-image

CULTURAL

Retail-and-residential-sector-modified-image

RETAIL & RESIDENTIALS