One Beverly Hills

multi-billion dollar development

cost

$3b+

represented

owner representative

About the project

One Beverly Hills, exemplifies our expertise in managing large-scale developments while maintaining the integrity of existing structures. We served as a trusted advisor to the ownership group, providing project estimating, scheduling, and a phasing plan ensuring the existing Beverly Hilton remained operational throughout construction.

Project Summary

Uni Construction played a key role in the successful preconstruction of this transformative project revitalizing a 17.5-acre site in the heart of Beverly Hills, CA.  This project highlights our ability to:

Trusted Ownership Representation

We provided invaluable guidance and expertise to the ownership group throughout the entire development process.

Comprehensive Cost Estimating

Our team meticulously reviewed design plans and created detailed cost estimates for multiple design schemes, ensuring the project remained within budget.

Strategic Scheduling & Phasing

We developed a comprehensive project schedule and phasing plan that prioritized the continued operation of the Beverly Hilton. This minimized disruption to the hotel’s guests and staff.

Project Scope

One Beverly Hills represents a dynamic mixed-use development, encompassing a variety of new structures seamlessly integrated with the existing Beverly Hilton and Waldorf Astoria:

Luxury Residences:

The project incorporates two high-rise residential towers offering stunning views and unparalleled amenities.

Flagship Aman Hotel:

A world-renowned Aman hotel brand makes its West Coast debut with a luxurious hotel featuring exceptional service and sophisticated design.

Retail Pavilion:

A curated selection of high-end retail stores adds vibrancy to the development.

Expansive Gardens

Over 10 acres of landscaped gardens create an oasis in the heart of Beverly Hills, offering public and private spaces for relaxation and exploration.

Project gallery

Top Construction Services in LA by Uni Construction

Hospitality

Mixed-use-modified-featured-image

Mixed Use

Food-and-beverages-modified-featured-image

FOOD & BEVERAGES

Education-sector-modified-featured-image

EDUCATION & PUBLIC SECTOR

Broad-museum-featured-image

CULTURAL

Retail-and-residential-sector-modified-image

RETAIL & RESIDENTIALS