Kitchen and Restroom Remodel

Remodel to create modern space

Task

Kitchen and Restroom Remodeling

represented

General Contractor

About Project

Uni Construction managed kitchen and bathroom remodeling in a San Dimas, CA residence. We collaborated closely with the homeowner to create a personalized design that met their needs and vision. This project highlights our commitment to quality craftsmanship, clear communication, and delivering a stress-free renovation experience.

Project Scope:

The kitchen and bathroom remodel encompassed a variety of improvements, designed to create a modern and inviting space for the homeowner:

Kitchen Transformation

  • Cabinetry & Countertops: The old cabinets were replaced with new white cabinets in a shaker style, offering ample storage and a timeless look. Beautiful granite countertops with a light gray veining pattern complement the cabinetry and add a touch of elegance.
  • Appliance Upgrade: Outdated appliances were replaced with brand new, stainless-steel appliances, including a range, dishwasher, refrigerator, and microwave.
  • Flooring Refresh: The old flooring was replaced with new luxury vinyl plank flooring in a light woodgrain finish, which creates a cohesive flow throughout the kitchen and complements the overall design.
  • Backsplash Magic: A beautiful granite backsplash was installed in a subway tile pattern, adding a touch of personality and protecting the walls from splatters.
  • Pendant Lighting: Uni Construction installed new pendant lighting over the breakfast bar, providing task lighting and a decorative touch.

Restroom Remodel

  • Fixtures & Finishes: Outdated fixtures were replaced with modern and stylish options in the bathroom. A new toilet, faucets with a brushed nickel finish, and a rainfall showerhead elevate both form and function.
  • Vanity Transformation: The old vanity was replaced with a beautiful new vanity in a light gray finish, featuring ample storage drawers and a sleek quartz countertop.
  • Shower Oasis: The existing shower enclosure was removed in favor of a walk-in shower with frameless glass doors. The shower features subway tile surround in a white subway tile pattern, and a built-in shower niche provides convenient storage for toiletries.
  • Flooring Refresh: The old bathroom flooring was replaced with new waterproof luxury vinyl plank flooring that complements the flooring installed in the kitchen, creating a cohesive flow throughout the main living area.

Final Results Achieved

The homeowner is happy with the final outcome. The new design was beautiful and functional, and both kitchen and bathroom seamlessly flow together.

Project gallery

Top Construction Services in LA by Uni Construction

Hospitality

Mixed Use

FOOD & BEVERAGES

EDUCATION & PUBLIC SECTOR

Broad-museum-featured-image

CULTURAL

RETAIL & RESIDENTIALS