Uni Construction construction and remodeling: Desgin

Residentials

Detached ADU at Tiburon

Client

Homeowner

Location

Tiburon

Year

2022

Role

Design

Type

ADU

Represented:

Concept & Objective

Provided full design service for ADU.

Uni Construction - Detached ADU at Tiburon - ADU design and construction - image 2
Uni Construction - Detached ADU at Tiburon - ADU design and construction - image 3

Inspiration

Our design approach focused on smart spatial planning and contextual integration. By maximizing natural light, optimizing circulation, and selecting high-quality yet practical materials, we delivered a home that feels spacious and warm despite its compact footprint. Architectural elements echo the main house’s language while introducing clean lines and contemporary detailing — a hallmark of Uni-CM’s commitment to refined, livable design.

Uni Construction - Detached ADU at Tiburon - ADU design and construction - image 4

Project Detail

The result is a turnkey ADU that delivers both everyday comfort and long-term value. From permitting through project delivery, Uni-CM managed every phase with clear communication, proactive coordination, and attention to detail. Homeowners now enjoy a beautifully crafted space that enhances their property’s functionality and market appeal — a testament to the thoughtful integration of design and build excellence.

Uni Construction - Detached ADU at Tiburon - ADU design and construction - image 5
Uni Construction - Detached ADU at Tiburon - ADU design and construction - image 5

Contact

Together, We Shape the Extraordinary

Interested in working with us? Let’s bring your space to life.

brown wooden bed frame with white and brown bed linen

Contact Us

brown wooden bed frame with white and brown bed linen

Contact Us