Burbank Home Kitchen

Complete Kitchen remodeling

Task

kitchen remodel

Role

General Contractor overseeing the entire kitchen renovation project.

About Project

This project transformed an outdated kitchen into a modern and functional space perfectly suited to the homeowner’s needs. Uni Construction handled all aspects of the renovation, from initial design consultations to final installation, ensuring a smooth and stress-free process for the homeowner.

Project Scope

The kitchen renovation encompassed a variety of improvements, potentially including:

Demolition & Removal: Removing existing cabinets, countertops, appliances, flooring, and any outdated fixtures.

Space Optimization: Potentially modifying walls to improve overall functionality and flow within the kitchen.

Cabinetry Installation: Collaborated with the homeowner to choose new cabinets that meet their style and storage needs. We then handled the installation, ensuring a seamless fit and finish.

Appliance Installation: Upgrading the kitchen with new, energy-efficient appliances, including a range, dishwasher, refrigerator, and potentially other features like a microwave or ventilation hood.

Flooring Installation: Replacing the old flooring with a new material that complements the overall kitchen design.

Plumbing & Electrical Work: Updating plumbing fixtures and electrical wiring to accommodate the new appliances and layout.

Lighting Design & Installation: Creating a well-lit kitchen environment through a combination of overhead lighting, under-cabinet lighting, and task lighting over key areas like the sink and cooktop.

Finishing Touches: Took care of all the final details, including painting, trim work, and installing hardware for cabinets and drawers.

The Uni Construction Difference

Uni Construction understands that a kitchen renovation is a significant investment in your home. We are committed to providing the following:

Personalized Design Consultations: We work closely with homeowners to understand their vision, needs, and budget to create a customized kitchen design that reflects their personal style.

Expert Project Management: Our experienced project managers oversee every aspect of the renovation, ensuring the project stays on schedule and within budget.

High-Quality Craftsmanship: Uni Construction employs skilled craftspeople who take pride in their work, delivering a kitchen renovation that is both beautiful and functional.

Clear Communication: We keep homeowners informed throughout the entire process, addressing any questions or concerns promptly.

Project gallery

Top Construction Services in LA by Uni Construction

Hospitality

Mixed-use-modified-featured-image

Mixed Use

Food-and-beverages-modified-featured-image

FOOD & BEVERAGES

Education-sector-modified-featured-image

EDUCATION & PUBLIC SECTOR

Broad-museum-featured-image

CULTURAL

Retail-and-residential-sector-modified-image

RETAIL & RESIDENTIALS