8th and fig highrise

Cost

$300M+ hardcost

Represented

General Contractor

Task

GMP Package

About the project

We represented the General Contractor for the monumental 8th & Fig development in Los Angeles, CA.

This 42-story luxury residential tower boasts breathtaking views and offers residents a variety of amenities (including a swimming pool, fitness center, rooftop terrace, and lounges). The ground floor features expansive retail space, adding vibrancy to the neighborhood.

Project Summary

Uni Construction represented General Contractor for the monumental 8th & Fig development in Los Angeles, CA. Our role encompassed pre-construction services and the creation of a comprehensive Guaranteed Maximum Price (GMP) package. This project highlights our expertise in:

Preconstruction 

Our team played a vital role in the preconstruction phase, conducting thorough constructability reviews and value engineering exercises. This ensured a complete package for the project’s GMP package utilizing minimum three (3) subcontractor bids for all major trades. 

Collaborative GMP Development

We compiled and analyzed subcontractor bid proposals, culminating in a comprehensive GMP package that provided the owner with budget certainty.

Value Engineering Expertise

Our team identified and implemented numerous value engineering ideas, optimizing construction methods and materials without compromising quality or design.

Project Scope

High-Rise Development

The project involved the construction of a 42-story luxury residential tower, offering breathtaking views of the Los Angeles cityscape.

Extensive Amenities

Residents enjoy a variety of amenities, potentially including a swimming pool, fitness center, rooftop terrace, and dedicated resident lounges.

Retail Space

The ground floor encompasses expansive retail space, adding vibrancy to the surrounding neighborhood.

Project gallery

Top Construction Services in LA by Uni Construction

Hospitality

Mixed-use-modified-featured-image

Mixed Use

Food-and-beverages-modified-featured-image

FOOD & BEVERAGES

Education-sector-modified-featured-image

EDUCATION & PUBLIC SECTOR

Broad-museum-featured-image

CULTURAL

Retail-and-residential-sector-modified-image

RETAIL & RESIDENTIALS