cost
approx. $100m+ hard cost
represented
General Contractor
About Project
Uni Construction represented the General Contractor for the preconstruction phase of Archer School’s ambitious master plan. This plan envisioned a significant transformation of the school’s campus, aiming to enhance educational facilities, athletic spaces, and the overall student experience. Due to on-going operation, the project had to be divided into two phases. Overall construction cost was estimated accounting the phasing, on-going school operation, and delineation between construction and school activities.






