Interior Renovation

Remodeling single-family residence

Task

Interior Renovation and Remodel

represented

General Contractor

About Project

This recently completed project in Valencia, CA exemplifies our expertise in transforming single-family residences into beautiful and functional living spaces. We collaborated closely with the homeowner to create a personalized design that reflects their unique style and fulfills their needs.

Uni Construction managed a comprehensive interior renovation of a Valencia, CA residence. The project aimed to create a light-filled and inviting atmosphere, perfect for entertaining family and friends. This project highlights our commitment to quality craftsmanship, clear communication, and delivering a relaxing home renovation experience.

Project Scope

The interior renovation encompassed a variety of improvements, designed to create a welcoming and functional living space for homeowner and their family:

Space Planning & Design Collaboration: Worked closely with the homeowner to assess the existing layout and explore opportunities for improvement. This might have involved rearranging furniture to maximize natural light or potentially modifying a non-load-bearing wall to create a more open and inviting floor plan for the living room and dining area.

Kitchen Refresh: The kitchen received an update as part of the kitchen renovation project, potentially including new cabinet doors and drawer fronts in a modern style, new countertops, and an upgraded sink and faucet. This kitchen remodeling also featured a fresh coat of paint and new hardware, which can significantly enhance the beauty & functionality of space.

Family Room Transformation: Through our expert room renovation services, we transformed the family room into a cozy and inviting space. This renovation included built-in bookshelves and cabinets flanking the fireplace, a brand-new entertainment center, and comfortable new furniture. The result is a perfect area for relaxation and gatherings, enhancing both the functionality and beauty of your home.

Enhanced Functionality: Uni Construction implemented features to optimize space utilization and improve overall functionality. This involved built-in mudroom lockers for organized storage near the entryway, or custom closet organizers in the bedrooms.

Interior Finishes: Upgrading the interior finishes significantly transformed the look and feel of the home. New hardwood flooring or luxury vinyl plank flooring were installed throughout the main living areas, while plush carpeting added comfort to the bedrooms. Fresh paint in light and neutral tones brightened the space, and updated trim work added a touch of elegance.

Bathroom Updates: The bathrooms received a refresh remodeling look, including new shower doors, vanity tops, faucets, and light fixtures.

SUCCESS

The homeowner is happy with the outcome. Their home now feels light and airy, and the open floor plan is perfect for entertaining. They especially like the cozy family room and the organized mudroom.

Project gallery

Top Construction Services in LA by Uni Construction

Hospitality

Mixed-use-modified-featured-image

Mixed Use

Food-and-beverages-modified-featured-image

FOOD & BEVERAGES

Education-sector-modified-featured-image

EDUCATION & PUBLIC SECTOR

Broad-museum-featured-image

CULTURAL

Retail-and-residential-sector-modified-image

RETAIL & RESIDENTIALS