Chariton Residence Renovation

renovation of single family residence

Task

kitchen remodel

represented

General Contractor

About Project

Uni Construction managed a complete renovation of a single-family residence in Ladera Heights, CA. Our goal was to create a modern and inviting space that would attract qualified buyers and increase the property value for the seller. This project highlights our ability to deliver a successful renovation that benefits both sellers and future homeowners.

Project Scope

The renovation encompassed a variety of improvements designed to enhance the overall appeal and functionality of the residence, potentially including:

Interior Design & Space Planning: Collaborated with an interior designer to create a cohesive design plan that maximizes the home’s potential. This involves rearranging spaces, optimizing flow, and modifying walls to create a more open and inviting layout.

Kitchen & Bathroom Upgrades: These essential rooms received a refresh, including new cabinetry, countertops, flooring, fixtures, and appliances. The focus was on modern finishes and materials that enhance functionality and aesthetics.

Flooring Throughout: Replacing outdated flooring with a consistent and attractive material throughout the house, such as hardwood, luxury vinyl plank, or tile, depending on the desired style and budget.

Interior Painting: A fresh coat of paint in neutral and light colors can significantly brighten the living space and create a more contemporary feel.

Curb Appeal Enhancement: Uni Construction have addressed the home’s exterior, potentially including refreshing landscaping, painting the front door, or adding new lighting fixtures to create a welcoming first impression for potential buyers.

Modern Fixtures & Finishes: Replacing outdated light fixtures, doorknobs, cabinet hardware, and plumbing fixtures with modern and stylish options can significantly elevate the overall feel of the residence.

Permitting & Construction Expertise: Our team ensured all necessary permits were obtained and managed the construction process efficiently to minimize disruption to the seller’s schedule.

Value Addition for Seller & Buyer Satisfaction

A well-executed renovation like this one benefits both the seller and the buyer:

Increased Property Value: Uni Construction’s renovations are designed to enhance the overall value of the property, maximizing the return on investment for the seller.

Enhanced Marketability: A modern and updated residence attracts more qualified buyers, leading to a faster and potentially more profitable sale for the seller.

Move-in-Ready Condition: The buyer enjoys the peace of mind of purchasing a home that is move-in ready, with all the major updates and upgrades already completed.

Project gallery

Top Construction Services in LA by Uni Construction

Hospitality

Mixed Use

FOOD & BEVERAGES

EDUCATION & PUBLIC SECTOR

Broad-museum-featured-image

CULTURAL

RETAIL & RESIDENTIALS