LACMA Levitated Mass

Preconstruction and estimating for LACMA’s Levitated Mass project

Managed

Preconstruction & Estimation

Represented

General Contractor

Project Description

Uni Construction represented the General Contractor during the preconstruction phase of LACMA’s Levitated Mass project. This unique artwork features a 340-ton rock hovering above a viewing pathway. Our preconstruction efforts ensured the project’s feasibility, considering both the artistic vision and the logistical challenges of transporting and installing the enormous rock.

Project Scope

Reviewing Design Plans and Specifications: Evaluating the architectural and engineering documents for the Levitated Mass project, including the foundation, support structure, and viewing pathway.

Cost Estimating & Budgeting: Developing detailed cost estimates for all aspects of the project, including materials, construction activities, and the critical heavy haul transportation of the rock.

Value Engineering: Collaborating with the design team to explore cost-saving measures or alternative construction methods while ensuring the structural integrity and artistic impact of the Levitated Mass.

Permitting Strategy: Developing a plan to obtain necessary permits and approvals from the city for construction activities and the transportation route for the massive rock.

Heavy Haul Logistics Coordination: A crucial aspect of this project involved planning and coordinating the transportation of the 340-ton rock. This included:

  • Identifying a suitable route with sufficient weight capacity for the oversized load.
  • Obtaining necessary permits and coordinating with local authorities for road closures or traffic control during transport.
  • Selecting and collaborating with specialized heavy haul carriers experienced in moving oversized objects.

Communication & Collaboration: Maintaining open communication and collaboration with the design team, engineers, and subcontractors throughout preconstruction to ensure everyone is aligned on the project goals, budget, and the unique logistical requirements.

Project Challenges & Solutions

Transporting a Colossal Art Piece:
The sheer size and weight of the Levitated Mass rock posed a significant logistical challenge. Uni Construction’s expertise in preconstruction played a key role in planning a safe and efficient transportation route, considering factors like road weight limitations, permits, and potential traffic disruptions.

Coordinating a Multifaceted Project:
The Levitated Mass project involved not only artistic considerations but also complex engineering and logistical elements. Uni Construction’s ability to manage the preconstruction process effectively ensured a smooth transition from planning to construction.

Project gallery

Top Construction Services in LA by Uni Construction

Hospitality

Mixed-use-modified-featured-image

Mixed Use

Food-and-beverages-modified-featured-image

FOOD & BEVERAGES

Education-sector-modified-featured-image

EDUCATION & PUBLIC SECTOR

Broad-museum-featured-image

CULTURAL

Retail-and-residential-sector-modified-image

RETAIL & RESIDENTIALS