LACCD Child Development Academic facility

LACCD - Child Development Academic Facility at Pierce College

cost

approx $20m design-Build package

represented

design-builder

Project Description

Uni Construction acted as the Design-Builder for this project, leading the pursuit and winning the design and budget competition. This role combined design and construction expertise to deliver a comprehensive solution for the college.

Key Responsibilities

Project Team Assembly: Forming a team with a qualified architect (Hawkins Brown in this case) and other design disciplines (DCI structural engineers, mechanical engineers, etc.) to create a competitive design package with Not-to-Exceed budget adhering to client’s requirements and standards.

Design Management: Overseeing the design process, ensuring the new facility meets Pierce College’s educational requirements, budget constraints, and adheres to all building codes and regulations.

Cost Estimating & Budgeting: Developing accurate construction cost estimates to ensure a competitive bid within the college’s budget.

Project Proposal & Presentation: Creating a compelling proposal that highlights the design concept, functionality, budget, and Uni Construction’s qualifications as the Design-Builder.

Project Award

Uni Construction’s design-build proposal, including the work of Hawkins Brown and other design disciplines, successfully won the project based on its design and budget competitiveness.

Project gallery

Top Construction Services in LA by Uni Construction

Hospitality

Mixed-use-modified-featured-image

Mixed Use

Food-and-beverages-modified-featured-image

FOOD & BEVERAGES

Education-sector-modified-featured-image

EDUCATION & PUBLIC SECTOR

Broad-museum-featured-image

CULTURAL

Retail-and-residential-sector-modified-image

RETAIL & RESIDENTIALS